V. \s "^ ^P.E C'lFlC ATIOJ^I j? UiSA SSBSSSSS !■ <«" ■ ■> ' fUK '- iv n- r: r" xx^ 'o 0' -\^ %l Digitized by the Internet Archive in 2011 with funding from The Library of Congress http://www.archive.org/details/manualofengineerOOhaup 11 tJ > > 3 A MANUAL Engineering Specifications AND Contracts, DESIGNED AS A TEXT BOOK AND WORK OF REFERENTCE FOR ALL WHO MAY BE ENGAGED IN THE THEORY OR PRACTICE OF ENGINEERING, BV y LEWIS M. HAUPT, PROFESSOR OF ClVIf- ENGINEERING, TOWNE SCIENTIFIC SCHOOL, UNIVER- SITY OF PENNSYLVANIA; DIRECTOR, FRANKLIN INSTITUTE DRAWING SCHOOL; IN CHARGE, GEODESY OF PENNSYLVANIA; MEMBER, AMERICAN INSTITUTE MIXING ENGINEERS; FRANKLIN INSTITUTE; PENNA. HISTORICAL SOCIETY, Etc., Etc. Scienliarum omnium, robur in star fascis iliius scnis ; non in singulis bacilhs , sed in OTnnibns vinculo co77.Junciis." — BACON, PHILADELPHIA: Published by J. M. Stoddart & Co., 723 Chestnut Street, 1818. Entered according to Act of Congress, A. D. 1878, by L. M. Haupt, in the office of Librarian of Con- gress, at Washington. J' L^~\ ^l1d TO THE HONORABLE, THE BOARD OF TRUSTEES, OF THE UNIVERSITY OF PENNSYLVANIA, AND CHARLES J. STILLE.LL. D. PROVOST, THIS WORK IS VERY RESPECTFULLY DEDICATED BY THE AUTHOR. INTRODUCTION. In preparing a piece of work for letting-, the duties of the Enelneer are manifold. He must first of all have a clear conception of the thing- to be done, and must give graphical expression to this idea, both by drawings and writing. It then becomes necessary to inform himself as to the probable cost of the proposed work, and if within reasonable limits, and he desire to let it, he must next notify contractors, and others, by such public announce- ments as will reach the largest number of reliable parties. It is thus seen that the preparation of the drawings, esti- mates, specifications and advertisements are all duties of the Engineer, which he has heretofore been allowed to learn as necessity required, and often on the spur of the moment. But his duties do not end here ; to insure the rapid and faithful execution of the work, he generally prepares the form of bid, ^vith certain "instructions to bidders," giving restrictions with which they must compl)' to render their bids valid, and finally, to adopt a form of agreement which shall be approved by both parties to the contract. The duties of the contractor are simply to examine drawings and specifications, or the site of the work, present his bid, and, if successful, sign the contract and furnish the required securities. The construction of the work is foreign to the object of this book. These six steps are developed more fully in the corresponding chapters which follow. PRE FAC E. In the course of their professional career, Engineers are frequently called upon to prepare papers connected with the lettingr- of work by contract. Often devoid of Instruction, without experience and with no works of reference at hand, it frequently happens that their efforts result In Inconvenience and loss. Essential points are sometimes overlooked, and too great confidence is re- posed In the good intentions of the parties. To aid in pre- ventlnof such unfortunate results and to meet an acknowl- edged want in our schools for Engineers, the author has been Induced to prepare this monograph on Engineer- ing, Specifications and Contracts, and has aimed to make It equally useful as a text book and work of refer- ence. An effort has been made to present clearly all the essential elements connected with the letting of work by contract. The several operations required have been systemati- cally arranged, and the principles involved stated in their proper connections, and Illustrated by a few typical forms carefully selected from the most reliable authorities. To accomplish this object most effectively the entire operation has been divided into its six elements, as given under the headings to the several chapters. It is not intended to make this work an exhaustive compendium of every possible form and condition, but to exhibit In the most concise manner the o-overni'no- VI 11 PREFACE. principles in all operations between two or more parties. Hence a careful analysis of the several cases presented has been made, showing the items and essentials which should enter into ordinary contracts with the manner of uniting them to form a complete instrument. This analy- sis is rendered more apparent by the use of marginal re- ferences throughout the work and by a series of questions on the contents of each chapter. Considerable difficulty was experienced in preparing the Code of Artisans' Rules for measuring work, since the little that exists in print on that subject is in such form as not to be generally applicable. The rules as given are the result of much correspondence and many inter- views with experts. As prices for labor and materials are so variable no effort has been made to prepare lists, but an illustration is given of their use in the fifth section of the second chapter. For more complete information on this subject the inquirer is referred to the third volume of a work published by J. Haviland, in Philadelphia, 1829 entitled '* The Builders' Assistant, including The House Carpenter s Book of Prices and Rules for Measuring and Valuing all their different kinds of Work" and also to the "Architects' and Builders' Companion:" Phila. 1875, by Frank W. Vogdes, Architect. In the Engineering Specifications, Chapter III, cited as examples, much technical information is given which is not to be obtained from text books. It is therefore re- commended that students should read them carefully, and for explanations of terms refer freely to the glossary specially prepared to accompany them. The questions PREFACE. IX upon this chapter will be found very useful in a general review of the course. To render the Instruction as practical and interesting as possible, it has been the custom to require students at the University of Pennsylvania to perform all the oper- ations for a special piece of work, such as the con- structions of the model of a bridge, a tunnel, or other object, on a scale of about 1-24. Students should make the drawings, estimate quantities, and prepare bills of material, specifications, bids, and contracts. The bids may then be opened in presence of the section or class, and the work awarded to some member, selected as foreman to superintend its execution. It is not, how- ever, necessary to carry the practice so far as the co7i- struction of models. Where facilities for such work do not exist It is recommended that the students be given special problems in constructions, as of a culvert, section of railway, either road bed or laying track, bridge or roof trusses to make estimates upon and prepare for let- ting. Such exercises prove very instructive, and compel an active interest in all collateral studies, by developing at once their practical applications. In conclusion the author gratefully acknowledges the information furnished by Genl. A. A. Humphreys, Chief of Engineers, U. S. A.; Col. Peter C. Haines, Secretary U. S. Light House Board; Genl. Wm. F. Raynolds^ U. S. E. Engineer, Fourth Light District; RIchd. K. Betz, and Jno. McClure, members of Carpenters* Company of Phila. and professional measur- ers; Messrs. Wilson Bros. & Co., Engineers and Archi- tects; Hazel Wilson, C. E. Chief Eng. Penna. R.R.; Henry PREFACE. S, Drinker, E. M.; Saml. L. Smedley, Esq. Chief Engineer and Surveyor, of Phila.; Rudolph Hering, C. E. Assist.; Jas. G. Hill, Supervising Architect, Washington; Wm. J. Twining, Maj, of Engineers, and many others ; with such works of reference as Haswell, Trautwine, Spon, Moles- worth, Hurst, Vogdes, and other hand books; Johnson's Universal Cyclopedia, Parson's Laws of Business, Vogdes' Mensuration, Tracy's Commercial Arithmetic, Robertson's Engineering Notes, Col. Lee's Tables, &c. L. M. H. University of Penna. TowNE Scientific School. October J^th, iS'^j. CONTENTS. CHAPTER I. Drawings. Defined ; form ; scale ; shades and shadows ; three projections ; working drawings ; dimensions marked ; papers ; profiles and cross sections ; section lines ; colors ; code of conventional colors; sizes of paper; requirements of drawings for contracts ; for maps ; Law requiring plans and estimates for government works. Questions on this chapter. CHAPTER II. ESTIMA'IES AND MEASUREMENTS, Necessity for preliminary estimates; elements of estimates ; Section I — Formulae for computing lines, surfaces and volumes. Section II. — Standard units and their functions, with U. S., British, French and Spanish tables of Weights, Measures and Capacity; Time; Eight hour law; Miscellaneous tables; Book sizes. Section III. — ■ Notes on the measuring of Artisan's work and materials; Lumber; Timber; Carpen- ters' and Joiners' work ; Excavators' work ; Plastering; Painting; Roofing; Plumbing ; Paving. Section IV. — Specific Gravities : definition ; formulae ; Full table of Specific Gravities, arranged alphabetically. Section V. — Estimate for one mile of R. R. Super- structure; Estimate for an Art Building at the International Exhibition. Questions. CHAPTER III. Specifications : Definitions, suggestions, &c. ; Examples for special cases. Specifications for River and Harbor Improvemenls : Dredging sand and mud at Cedar Keys, Florida ; for Granite Rip Rap for Breakwater at Block Island, R. I. ; for dredging rock at Hell Gate, N. Y. ; for a Cribwork Breakwater at Cleveland, Ohio; for an Iron Landing Pier at Lewes, Del. ; for the removal of Snags from the Minnesota river ; for the construction of five Canal Locks on the Tennessee river ; for a Dam of masonry on the Kanawha river ; for a Lighthouse at Southwest Ledge, Long Island Sound. Municipal Works: Specifications for a Main Sewer; for a Reservoir at Wilmington, Del. ; for a College Building at Philadelphia. Railroad Engineering : Specifications for a Passenger Depot, B. & P. R. R., Washington, D. C. ; for Masonry of a Railroad Bridge, (two) ; for Superstructure of a Wrought Iron Bridge ; for Grading a Drive ; for Macadamizing an Avenus ; forOraduation and Masonry P. R. R. and P. & R. R. R. ; for Superstructure and Track Laying ; for a Tunnel P. R. R. ; for Graduation, Masonry, Tunnels, Founda- tions, Bridges, Viaducts, Trestle- Work and Rails on the Cincinnati Southern R. R. ; Ohio River Bridge Specifications, C. S. R. R, for Freight and Passenger Locomotives ; for Rolling Stock, Empire Transportation Co. Questions on this chapter. Xll CONTENTS. CHAPTER IV. Advertisements. General instructions ; object of advertising ; headings ; U. S. law ; the information to be given. Forms of Advertisements for the specifications already given under River and Harbor Improvements ; also for a Sewer ; for opening Trenches for Water Pipe ; for a Bridge ; removal of a portion of a pier at Staten Island; for Gravel ; for Stone for the East River Bridge abutments ; for furnishing Steam Power for Machinery Hall, U. S. Centennial Buildings, and for Shafting. Questions. CHAPTER V. Bids or Proposals. Definitions ; Straw Bids ; Forms to be prepared by engineers r Instructions for Bidders for government work ; Law relating to transfer of contract ; Law concerning opening of bids ; Forms of proposals for Removing Snags ; Building Canal Locks ; constructing a a Dam with guaranty ; form for erection of Lighthouse, with bond, bondsmen's oath and certificate ; form for a Sewer, filled out with prices actually bid per lineal foot, with cer- tificate of City Solicitor ; tabular form for submitting bids for Railroad Graduations ; Tunnel Work, Masonry, Macadamizing, Drain Pipes, Foundations, Wood Trestles, and Girder Bridges used on Cincinnatti Southern R. R. ; forms for Graduation Masonry and Tunnels used on P. R. R. ; proposal of Keystone Bridge Company for an Iron Bridge on Easton & Amboy R, R. ppening the bids: Method of proceeding; tabulating and comparing prices ; form for Sewer filled out, giving comparative prices per lineal foot and totals; proposed modification of same ; another form where bids are made by quantity of material and work ; notice of award served ; results of bids published. Questions. CHAPTER VI. The Contract. Definition ; component parts ; classification ; the four essential constituent elements : I, the parties ; 2, mutual consent; fraud, offers on time, by correspondence ; 3, the consideration ; definition; necessity for, adequacy of, illegal, if worthless ; 4, subject mat- ter ; anything not illegal or immoral ; meaning must be clear ; nature of a perfect con- tract ; oral evidence, when admitted; usage; obscure contracts ; other conditions; general duties of parties stated separately ; payments ; risks ; certificates ; penalties for delays; time; limitations for actions at law ; guaranty, its requirements ; written con- tracts ; appropriations required by U. S. Law before contract can be signed ; forms of agreements used by II. S. Engineers and U. S. Light-House Board with bond and bondsmen's oaths ; form in use in Philadelphia for a Sewer ; contract for a Reservoir at Wilmington, Del., filled out ; form for Iron Water Pipe ; agreement for College Build- ing ; general form for contractors and builders ; for grant in fee of Right of Way ; prelim- inary agreement for Right of Way ; deed for same ; formfoV Graduation and Masonry. Questions on chapter VI. APPENDIX. Legal decision concerning that clause of the contract resting the sole power of arbi- tration in the Engineer. Glossary of Technical Terms used throughout the work. CHAPTER I. The Drawings. Drawing is the art of representing graphically, Drawing dcfme.L objects or ideals, as they exist or appear to exist. The representation of objects as they exist, Classification, showing their forms, sizes and positions, is included in those sub- divisions of the art known as Orthographic Projections, Iiisoinetri- cell Perspective^ and Shades and Shadows. The representation of objects as they appear to exist is known as Scenogtapliic Projec- tion^ Linear or Aerial Perspective. To draw correctly, therefore, involves a thorough Vaiue of DescHp. knowledge of Descriptive Geometry with its appli- study. cations to the Arts and Manufactures. Its study should be in- sisted upon in all Technical Schools, as in addition to its direct use, it is particularly valuable in developing the inventive and perceptive faculties, which of all others are most useful to the practical engineer. All objects possess two general characteristics — Form and color. form and color ; but the color, which serves merely to give variety and expression to the object, is limited by Form, the chief and contained within the form. It is to the latter jeJis. therefore to which our chief care and attention should be di- rected in all drawings. Form is an universal lansruao-e, and hence the ne- . ^ , c> <=> ' Langiia2:e of form, cessity of resorting so largely to it in the repre- ""^^''^''sai- sentation of all tangible and visible objects. It avoids much ambiguity and a multiplicity of words, and is intended in the drawing to be a representation in miniature of the idea or thing to be delineated. The scale is the expression of the ratio of the Scaie defined. drawing to the object. The value of a drawing depends, therefore, principally upon the accuracy of its outline, which should be made Simplicity and ac- T 1 -,1,1 curacy of outline, on as large a scale as convenient and not be con- requiied. fused by a mass of details. 2 THE DRAWINGS. To make a complete representation of a solid, at ^j^^ ^j^^^^ p^.^^^^^ least three projections are necessary, tJie plan^ eleva- ^'°"^- //f?;/ and sectioriy but frequently many more are required, and in complex constructions there should be shown, firstly, the general views of the various parts properly assembled as a whole, either in linear or isometrical perspective or in projection, and secondly, the three or more projections of each of the parts or details^ usually on a larger scale. To this latter class belong Working drawings. all *' working drawings " which are always made to a scale, and to prevent any mistake which might arise from errors in the drawings, all distances and dimensions should be dimensions should carefully written upon the parts to which they Remarked, belong. The space intended to be embraced by the figures is. indicated by dotted arrows extending outward from them, thus: |< 24^6^' •>! I< 29' >| Should it happen that the dimensions marked do ^^.^^^^ dimensions not correspond with the distances given by the JJ^^^^ ^in^cases^of scale, and it is impossible to determine from any '^°"'^^- source which is correct, preference should be given to the nu- merals, unless they are manifestly in error, and the work con- structed in accordance therewith must be accepted. The scale should be so large that the least di- selecting the scale mension may be distinctly represented. It is desir- r^tfo ^ to'^'draSii? able also to construct it upon the same sheet of constant. paper with the drawing, that it may be subjected to the same varia- tions from changes of temperature, moisture and other causes,, and thus the ratio of the two remain constant. A detached scale upon a piece of paper of the same quality will be found very convenient and more accurate than the dividers, ^v,- .• . .-u ' Ubjections to the which are liable to slip or spring back as well as to ^^'^i^^^s. injure the drawing. For small measurements the other scales. diagonal scale is the most accurate. Triangular box- wood scales are also very useful. Constructions in Architecture, Machinery or any Decimal and duo- . -I 1 i • 11 1 decimal systems works executed by artisans are usually represented when used. by the duodecimal scales, whilst those for the engineer are ex- THE DRAWINGS. 3 pressed in the decimal or metric system, but the rule is not ab- solute, and either may be used. The vertical and horizontal scales are not always Vertical and hori- .■t 'i. • r ^^ I'll, • r- 2ont:il scales frc- tne same, as it is irequcntly desirable to maynify qucmiy iiifiercnt. the irregularities of surface lines as in profiles or longitudinal sections of earth, either above or under water, and to represent fluctuations of various kinds, as prices of materials, pressures, &c. For such purposes ''profile" paper, ruled in Description of pro- various forms is published either in sheets or con- ^.^ ^^^^^>^ k\\\\\\\\\\\\\\\\\\\\\\\\ Illustration. -M 6 CONVENTIONAL COLORS. In the first panel the centre and the borders are Explanation, raised and in the second depressed, as shown in the sections. A general law is also deduced from these princi- j^^j^^ ^^^ drawing pies, namely, that in draiving projectionSy the right ^'^'^^^ ^^°^^- ha7id and bottom lines shoidd be the heavier^ a7td i7i recesses the left hand and upper lines the heavier. To render drawings still further intelligible all section lines or sections of solids should be shaded by a series of hatchings, parallel lines called section lines or hatchings, drawn at regular intervals. In curved or irregular surfaces, the effect may be shown by parallel lines drawn at irregular intervals. To represent timber and metals of various kinds, colors are sometimes used with good effect, but they are not coiors— not ener- generally required, as the specifications should in- ^^^^ required. dicate with sufficient clearness the nature of the materials. ' To secure uniformity in the use of colors when desired, a code is hereto annexed : — Conventional Colors. ■p { Exterior Gamboge ^^^^^ J Interior Dark Indian Yellow •p ' 1 5 Exterior Lt. red with carmine "*" I Section Crimson lake or carmine Brushwood Green and bt. sienna, marbled Buildings Crimson lake Buildings, shadows of. .Indigo, bt. sienna and lake Cast iron Payne's gray Clay or earth Burnt umber Concrete work Sepia Copper Gamboge and crimson lake Cultivated land Bt. sienna Earth and clay Bt. umber Fir timber Indian yellow Granite Violet, carmine Grass Hooker's green Gravel Yellow ochre dotted with bt. sienna Gun metal Dark cadmium or orange J ( Cast _ Payne's grey iron ^ Wj-ought Prussian blue and indigo Mahogany Indian red Meadow land Hooker's green Mud Sepia or India Ink Oak timber Bt. sienna, grained Roads and streets Yellow ochre Sand Yellow ochre Sky Cobalt Slopes Sepia with bt. umber Steel Indigo or Prussian blue and lake Stone Sepia and yellow ochre C Light — Gamboge and bt. sienna f on a Trees < Shade Gamboge and indigo < green t Shadows. ..Bt. sienna and indigo C ground Uncultivated land. . Green and bt. sienna, marbled Vineyards. Purple Water Indigo Exterior Yellow ochre or raw sienna Sections Bt. sienna Wrought iron Prussian blue and indigo Wood^ Sizes of Drawing Papers in Sheets. Antiquarian SS'^Si Adas 34x^6 Columbier 35^23^ Demy 20x15 J^ Double Elephant 40x27 Elephant 28x23 Emperor 68x48 Imperial 30x22 Medium 22^x17^ Royal 24x19 J^ Super Royal zj%xig% DRAWING PAPERS. ^ Paper is also manufactured in continuous rolls of 36, 42, 54 and 59 inches in breadth and of various weii^hts, qualities and colors. The light brown manilla is extensively used for work- ing drawings. Hot pressed papers have a smooth ^^^^^ .^^^ ^^,^j surface; cold pressed, rough. The latter are gener- i"^'^^'^'^- ally preferred. The drawings to accompany a contract should Requirements of r ^\ y 1 1 1 drawings for con- be so lull, complete and accurate as to leave notn- tracts. ing to the imagination or discretion of the contractor that may be shown on paper. All the sheets should be carefully desig- nated by letters or numbers for convenience of reference, should contain a title, a scale, the date when finished, and name of the person who may be consulted in cases of doubt or errors, should they arise. In addition to the above, maps should always For maps. show a meridian and the magnetic variation when it is possible to determine it. These last requirements are frequently over- looked. Every piece of work, however small, should be Necessity for draw- represented by drawings, that the artisan may have "^*'^- a distinct idea of what is to be done. For Government works, the law of 15th July, 1870, is very explicit. It provides that, "Before any new buildings for the use of the United Law requiring States are commenced the ^ians 2.n(l full estimates Xhcreior p'-'^'is and estmiates , . for Government shall be prepared and approved by the Secretary of the work. Treasury, the Postmaster General and the Secretary of the Interior ; and the cost of each building shall not exceed the amount of such estimate,"* The above law requires not only drazviiig^s but ,, , • , T- J Q Complete estimates estimates in full, which shall be equal to the cost of '■^q^^'^ed the proposed structure. It is important therefore that the engineer or architect should have sufficient prescience based upon expe- rience to include and provide for every item or contingency that may arise in the progress of the work, that his estimates may not fall short of the actual cost, as is too often the case. The prin- cipal items entering into estimates with the manner of working them up will be found more fully developed in the succeeding chapter. Revised Statutes U. S. Section 3734. 8 QUESTIONS. QUESTIONS ON THE FIRST CHAPTER. Page I. Define drawing. What are its sub-divisions? State the gen- eral characteristics of all objects. Which is most important? Why is so much stress laid upon correct outline ? What is the scale ? Page 2. What are the views given in projections? What are working drawings ? How are dimensions indicated ? How are the correct dimensions determined ? How is the scale determined and where should it be placed ? Why are dividers objectionable? When are decimal and duodecimal scales used ? Page 3. Why are the vertical and horizontal scales sometimes different ? What are profiles ? What are cross sections ? Page 5. In what direction is the light supposed to enter? What is the distinction between shade and shadow ? Page 6. Give the rule for drawing shade lines. What are section lines ? When may colors be used ? Page 7. What are the requirements in drawings for contract work? for maps ? Why are drawings necessary ? What is the U. S. law concerning drawings and estimates ? CHAPTER 11. *^ For which ofyoti intending to build a tower, sitteth not down first, and counteth the cost, whether he have sujficient to finish it. Lest haply, after he hath laid the foundation, and is not able to finish it, all that behold it begin to mock him, saying. This man began to build, and was not able to finish. '" — St. Luke xiv: 28, 29, 30. Estimates and Measurements. That the engineer may be able to present the case properly in his advertisements as well as to determine for his ^^^^ ^^ ^ preiimi- own guidance in letting, the amount of work to be "^ry estimate, done, it will be necessary for him to prepare from the drawings or from, surveys approximate estimates of quantities as well as of costs. In making up such estimates it must not be forgotten that there are other items of expense than mere cost of ^, ^ , i -/ iilemcnts to be em- materials ^XiA labor. To these must be added the bodied in estimates. expense of engineering, stipefintendence, the tools, machinery, in- struments, buildings, &c., known as the ^^ plant !' interest of money invested, a fair allowance {or coiitractor's profit, wear ajid tear oi tools and machinery, insurance if necessary, and a percentage for contingencies, such as damage to property or to the work itself from the elements or from accidents. Some of these quantities are functions of others which are very variable, as prices and animal power, systems of working, &c., so that such tables of statistics would be an incumbrance to this work, especially as they can be so readily referred to in num- erous engineering hand-books, but the more constant data used in the calculation of quantities will be found serviceable for reference in this connection, and are therefore introduced in as condensed a form as possible. 10 FORMULA FOR COMPUTING Section I. Fof mules for Computing Lmes, Surfaces and Solids. Lines. Ratio of diagonal to side of square 1 1]/ 2=1. 414=^ nearly. Side of inscribed square : R :: ] 2 : 1. " Side of inscribed equilateral triangle: R :: 1/3 : i. Side of inscribed regular hexagon=R. Side of inscribed regular decagon=o.6 1 8 R. For any part of triangle ^:^ or <: :: sin A: sin B or sin C f a, b, ^=:height If but one base, r becomes zero. Of the Spherical Pyrainid-=^\ R 5, j=area of Spherical pyramid. spherical polygon forming the base and R=radius of sphere. Of the Spheroid^=^ — p — , <3;=the revolving, b the Spheroid. fixed axis. Of the Frustra of Spheroids. Frustra of s he (A) When the ends are cut off by planes perpen- '■°'^^- dicular to the axis of rotation=(^^-[-s- 3^—1/2. Regular poiyhod- Of the Hexaed?'on-^=S ^. Of the Octaed7'OJi^=.^'j 14.04. S ^. Of the Dodecaedro72='/ .66^1 S ^. Of the Icosaedroii^=2.i'^ij S ^ where s^ength of one edge. Of the Ciradar RiiigD^ T^'^X 2.46'/ 4. \d\QrQ De circular ring, ^exterior diameter, Tu=thickness of ring^R^^').* Section II. Standard Units and their Functions. In all contracts for quantities of material no ambiguities are allowable, but the precise amounts should be clear- -^^^^^ amounts ly set forth. There is much room for misunder- should be stated. standing in the ordinaiy use of terms, as for instance, a ton may be 2240 or 2000 lbs; a perch, 22, 24 ?4 or 25 cub. Ambiguities, ft.; a month, lunar or calendar; a year, Julian or Gregorian; a bushel, heaped or struck; a working day, 10 or 8 hours, or "from daylight 'till dark," &c. To pre\^cnt any uncertainty as to the meaning of the terms it is necessary to refer all a weii defined . f. M 1 J • '11 11 Standard should be amounts, 11 possible, to some mvariable standard adopted. unit as a lineal, square or cubic yard or foot, a pound or an hour. * The above are the formulae most frequently referred to in mensuration. They are compiled chiefly from Col. Lee's Tables, Professional Papers No. 12, Corps of Engineers and Vogdes' Mensuration. For additional information see Trautwine or Haswell's Hand Books. 14 FOREIGN MEASURES. There are certain conventional methods of measuring Artisans* work requiring allowances to be made for workmanship, which will be explained hereafter. The United States and English measures of u. s. and British J ,■• 1 ' 1 , r l^ 1 •• measures of length lengtli and weight, oi the same denommation are and weight. practically equal, but there are wide differences between the same denominations of liquid and dry measure* The British standard of length, the simple seconds pendulum, 39.1393 ins. long, having been destroyed by fire in 1834, it was found practically impossible to restore it, so that the British yard is about 1-14 of an inch in 100 ft or 3 J^ ins. in a j,-,^^,^^^, between mile shorter than that of the United States, thus *^"'- accounting for the difference between the British and American scientists' estimates of the length of a metre, a degree of longi- tude, a nautical mile, &c. To convert British linear dimensions into Ameri- r> , . . ■ Rule for reducing can , multiply by 1 .00005 8, and American into British, ""^^ *° '^^ °^^''- multiply by .999942. U, S, Measures of Length. The standard unit is the yard, TABLE OF EQUIVALENT LENGTHS. Ins." 12 36 198 7920 63360 190080 Feet (Ft) Yards. Poles (Yds) (Ps) I. 0-333 0.0606 3- I. 0.1818 16.5 5-5 I. 660. 220. 40. 5280. 1760. 320. 15840. 5280. 960. Furlongs. (Fs) 0.001515 0.004545 0.025 I. 8. 24. Statute Miles. (Ms) 0.00018939 0.00056818 o. 003125 0.125 I. 3- League. (L) Miscellaneous. A point=i-72 of an inch. A line=6 points=^ inch. A palm=3 inches. A hand=4 inches. A span=9 Miscellaneous equi- inches. A fathom=6 feet. A cable's length— 1 20 ^^''^^^^ '^^ '^"s*- fathoms=72o'. FOREIGN MEASURES. 15 K sfafufe or land mile=7j^ cables=.8675 5 nautical milcs= 1609.315 metres. A geographical or nautical mile or " knot''=i min. of longi- tude on the equator, at the sea levcl=i. 152664 statute miles= 1855. II mctres=2028.69 yds. =6086.07 ft. One degree at the eq.=69. 16 or 69 J- statute miles. One minute of latitude at the equator (sea level)=6o46 ft. One minute of latitude at the pole (sea level)=6i07 ft., giving a mean of 6o/6^4 ft. which is sometimes used. The length of a degree of lo?igitude decreases towards the poles as the cosine of the latitude and may therefore be found by multiplying 69/5- by cos L., (or for table of computed values see Trautwine p. 75.) For /a7id measures the Gunter's chain 66 ft. long is generally used, consisting of loO links of 7.92 inches each, but for road, railroad and canal surveys the engineers chain of lOO or 50 ft. is taken as the unit. The parts of the Gunters chain are. TABLE OF SURVEYORS MEASURE. Inches. Feet. Links. Poles. Chains. Furlongs. Miles. 7.92 0.66 I. 0.04 O.OI O.OOI 0.000125 198. 792. 16.5 66.0 25- 100, I. 4- 0.25 I. 0.025 O.I 0.003 1 25 0.0125 7920. 63360. 660. 5280. 1000. 8000. 40. 320. 10. 80. I. 8. 0.125 I . As the Metric System was legalized by an Act of Congress, dated July 28, 1866, as a recognized standard of Memc System. Weights and Measures in this country, it is thought proper to introduce it here, although it has not yet come into general use. The metre is the unit. i6 FOREIGN MEASURES. FRENCH MEASURES OF LENGTH. > 'B H In. Ft. Yd. Ms. Millim. o.ooi m. .0393685 &c. Centim. o.oi m. .393685 .0328 &c Decim. 0.1 m. 3-93685 .328071 Metre. Decam. Hectom. Kilom. Myriam. I. m. 39-3685 3.28071 I -09357 10. ms. 393-685 32.8071 IO-9357 100. ms. 1 1000. ms. 109-357 .0621347 1093-57 loooo.ms 10935-7 .6218491 6.213466 Road measures. Spanish Measures of Length. In Mexico the metric system was established in 1856. The old measures are Spanish ; the legal unit being the vara of Burgos =32.91 inches or 835.9 "^ ^' The vara in actual use in Amer- ica is, however, 33.385 in.^847.96 m m.=.84796 ms„ TABLE OF EQITIVALENTS. Puntos, Lineas. Polgardas. Sesmas. Pies. Varas. Estadal. U. S. Inch. 12 I 0.077 144 12 I 0.927 864 72 6 I 5-564 1728 144 12 2 I II. 128 5184 432 36 6 3 I 33-385 20736 1728 144 24 12 4 I 133-540 (Note. For equivalent itinerary measures in the principal foreign coun- tries see Lee's Tables, Pages 18 and 19.) Two Dimensions. Surface Measures. The unitior small areas is a square foot. Superficial units. The unit ioi extensive areas is an acre or a square mile. FOREIGN MEASURES. 1/ Sqiiarc Measure is composed of the following equivalents : TABLE FOR SQUARE MEASURE. Sq. ins. Sq. feet. | Sq. Yds.' Poles. 144. 1296. 39204. 1 5681 60. 6272640 I. 9- 272.25 10890. 435^0 4014489600. ' 27878400. O.IIII 0.00367 I. 30.25 I2IO. 4840. 3097600. 0.033058 I. 40. 160. 102400. Roods. ! Acres. Sq. M. 0.0000918 0.0008265 0.025 I. 4- 2560. 0.00002296 o 0002066 0.00625 0.25 I. 640. Miscellaneous. rela- 16 sq. rods or poles^=i sq. chain. 2]/^ sq. chains JJonsf^"^°''^ = 1 rood. lo sq. chains=l acre. A Govennncnt Section of land is one mile square and contains I sq. mile=27, 878,400 sq. ft.^(528o)^ &c. An acre is=to a square whose side is 208.71 ft. long. A half acre is=to a square whose side is 147.581 ft. long. A quarter acre is=to a square whose side is 104.355 ft. long. French Measures of Smface. The square metre is the unit. TABLE OF FRENCH SURFACE MEASURES. Val.in Sq.Metre. In U. S. sq. Sq. Millimetre. Sq. Centimetre. Sq. Decimetre. Sq. Metre orCen- tare. Sq. Decametre or are. Hectare Sq. Kilometre. Sq. Myriametre. looooooo. .000001 .0001 01 I. 100. 1 0000. 1 00000. .001594 .15498S 15.4988 1549. 88 154988. Sq. ft. .00001076 .00107631 .10763058 Sq. Yds. .0000012 .OOUII96 .0119589 I0.76305S I. 195895 1076.3058 119.5895 107630.58 j 11958-95 I .38607sq.m. 10763058. 'II958S5. Acres, ,000247 .024709 2,47086 247,086 38,607 " ! i 1 24708.6 i8 FOREIGN MEASURES. Spanish Surface Measures, The unit is \^\^ fanegada ^N\{i<:)i\ 13=1.5871 acres=o.642563 hectare. The multiple being 50 fanegadas=l yugada=79.355 acres. Three Dimensions. Cubic or Solid Measure. The standard unit ior mineral substances generally ^|- ""'^^ °^ '•'°'- is the cubic yard. The units of capacity are : for liquids, the gallon^ and for dry' measure, the busliel. TABLE OF SOLID MEASURE. Cub. Ins. Cub. Ft. Cub. Yds. Cords. 123== 1728 46656 221 184 I 3^=27 128 I 4 20-27 I Notes, I cord of fire wood piled, is 8 ft. long, 4 ft. wide Jfi^sures"''''"^ and 4 high making 128 cub. ft. I chaldron of coal=:57.25 cub. ft.=36 bushels. The U. S. Government Engineers generally esti- ^^-.x^' ^"^meers mate stone by the cord ; sand and earth by the cubic yatd; timber by the cubic foot \ sawed ti7nberf joists, planks, scantling, &c., by \hQ superficial foot board measure ^b. m. containing 144 cub. in.; and iron by the pound, A perch of masonry by quarrymen's measure is '^^g^^s'^^n^ '^^II 16 1^ ft. long, 114 ft. wide and I ft.thick=24^ cub. son's measures. ft. in the pile. It is generally taken at 25 cub. ft. ; and some- FOREIGN MEASURES. 19 times at 22 as in mason'' s measure where it is i6j<^ ft. loni^, 16 ins. wide and 12'' high measured in the wall. Stone walls less than 16" thick are assumed to brTadtil "0" have that breadth in estimating workmanship. To avoid any misunderstanding it is better to express the ya3s"or'cor'ds'^" '^ volumes in cubic yards or cords, which are becoming recognized standards in contract work instead of in perches as formerl). Measures of Capacity. The siaftdard units 2iTQ the lVi7ichester bushel 2ind ^'"it^ "<" f^paci^- the wine gallon. The bushel is a cylindrical vessel i8>< ins. in ^im^^n^ions, .vc ,of J / " bushel. diameter and 8'' deep, containing 2150.42 cubic inches or 1.24446 cub. ft. of distilled water, and weighing 543,391.89 stan- dard grains or 77.627413 lbs. Avoirdupois. When "heaped" the cone must be at least 6" high making the He^p<^^^ h^x^\^^i. heaped bushel^=^\y^ "struck" bushels=5 pks.= i.555 cub. ft. The relations in Dry Measure are, TABLE FOR DRY MEASURE. Pts. Qts. Pks. Bush. 2= 16= 64= I. 8. 32. 0.125 I . 4. 0.03015 0.25 I. The gallon in Dry Meas- ure contains 268|- cub. in., but is seldom used. The relations in Liquid Measure are, TABLE FOR LIQUID MEASURE. Gills. Pts. Qts. Gal. Hhd. Pipes. ' Tun. 4- I- 8. 2. I- 32. 8. 4- I. 2016. 504. 252. 63. I. 4032. 1008. 504. 126. 2, I. 8064. 20l6. 1008. 252. 4- 2. I. 2Q FOREIGN MEASURES. Notes. The gallon contains 231 cub. in. of distilled water ^X^"^^°"^ °^ ""^^ weighing 58,372.2 grains or 8.3389 lbs. avoirdupois. In Beer Measure 54 gallons make I hhd. A barrel of oil contains 42 gallons. In Massachusetts 32 gallons make a bbl. In some States 31^, and in others from 28 to 32. A Uerce=A.2 gfallons and two tierces=one punch- ^'^^""^^ and punch- ^ Q £ eon. eon. Apothecaries divide the p-allon into 8 pints ; the Apothecaries liquid J- cj r 1 measure. pint into 16 ounces ; the ounce into 8 drams; and the dram in- to 60 minims or drops. French Measures of Capacity. The litre is the unit=6i.oi65 cub. in. TABLE OF EQUIVALENTS. Names. 1 No. of Cubic ft. Cubic mea- Dry measure. Liquid measure. litres. sure. Myriolitre or De- castere. Kilolitre orStere. Hectolitre or De- 10,000 1000 353-105 35-3105 10 cub.metres. I 283.742 bush. 1.3078 cub. yds. 2641.41 gals. 264.141 " cistere. Decalitre or Cen- 100 3.53105 0.1 '« 2.83742 bush. 283742 26.4141 " tistere. Lit7-e or cubic 10 •353105 ID decim. Cubic ins. 2.64141 " decimetre. I 61.0165 I « .908 quarts 1.05656 quarts. Decilitre. 0.1 6.10165 O.I « \ .1816 pints. ( 6.i022cub.ins. .84525 gill^- Centilitre. Milliliire or cub. centimetre. .01 .001 .610165' locub.centim. .061016 I " i .01816 pts. ( .61022 cub. in. i 001 81 6 pts (0612 cub. in. .084525 " .00845 « Spanish Liquid Measures. The cantara or arroba is the tinit. The arroba mayor, for wine=4,079 gals.= 15.44 litres. FOREIGN MEASURES. 21 The arroba mcnor, for oil=3. 1 86 gals.= 12.06 litres. The submultiplcs arc, Copas. Quartillos ) Azumbre. Cuartillos. ) Arroba. 4 16 12S I 4 32 I 8 I Spanish Dry Measure, The fanega, the unit is=i.555i bushs.=54.8 litres. Ochavillos. Racious. Quartillos. Medios. Almudes. Fanegas- Cahiz. U. S. bushels. 4 I 0.0081 16 4 I 0.0324 32 8 2 I 0.0648 64 16 4 2 I 0.1296 768 192 48 24 12 I i-S-^Si 9216 2304 576 288 144 12 I 1S.6612 Weights. The standard unit of weight is the pound avoir- Units of weight. dupois ; the only legalized unit is the pound Troy. AVOIRDUPOIS WEIGHT. I ■Drams. Ounces. 1 1 Pounds. Quarters. Cwt. Tons. 16 256 6400 25600 51200 I 16 400 1600 32000 0.625 .025 I. ; .04 25. I. TOO. 4. 2000, 1 80. .00625 .01 •25 I. 20. .0003125 .0005 .0125 .05 I 22 FOREIGN WEIGHTS. Notes. The ton of 2240 lbs. known as the old ox long ton oidand new ton. is the standard used at the custom houses of the U. S. Govern- ment but the short ton is now the one intended unless otherwise specified. Iron is sold by the long ton. The avoirdupois pounds of Great Britain and the ^-^^^ e"uiv?ienf U. S. are equal to each other and to the weight ot 27.7015 cub. inches of distilled water at its max. density — barometer 30 ins. — volume (3.0258 ins. 2). Troy Weight, TABLE OF TROY WEIGHT. Grains. Pwt. Ounce. Pound. 24 I 480 20 I 5760 240 12 I The pound Troy, in both the U. S. and Great Pound equivalent Britain, is equal to the weight of 22.7944 cub. inches of distilled water — barometer 30'^ It is used in weighing precious metals. Apothecaries Weight. TABLE OF APOTHECARIES WEIGHT. The apothecary pound is the same as that in Troy Pound equivalent, weight, the only difference in the table being in the subdivisions of the unit. FOKKIGN WKIGHTS. 23 French Syshju of Weights FRENCH E()U1VALKNTS OF WEIGHTS. Names. XT r r- \\ eu'ht ofwliat (luantilv l',(iuivalcnts in Avoir- 01 water at max. density. dupois weight. Milligramme. .001 I cub. millimetre. ■01543316 grains. Centigramme. .01 TO " " .1543316 Decigramme. .1 O.I " centimetre. 1-543316 Lrram/ne. I. I.O'' " 15-43316 Deca gra77inie. 10. 10. ■•' " .o22o4737pounds. Hecto <' 100. I decilitre. .2204737 Kilo " 1000. I litre. 2.204737 " Myria " 10,000, 10 litre. 22.04737 Qunital " 100,000. I hectolitre. 220.4737 Millier or Tonneau. 1,000,000. I cub. metre. 2204.737 Sp anisJi Weights. The legal iinit is the libra of Castile=i.oi43 lbs. Avoirdupois. =460 grammes. TABLE OF SPANISH WEIGHTS. CO en ranos. omines. chavas. N G u5 u5 f/5 CS onclada .S.Ounc Avoirdu H < ^ h-1 < a r"' D 12 I 0.0211 36 3 I 0.0634 72 6 2 I 0.1268 576 48 16 8 I I.0143 4608 384 128 64 8 I 8.1144 9216 76S 256 128 16 2 I 16.2288 220400 19200 6400 3200 400 .S" 25 I 15-3575 lbs. 881600 76800 25600 12S00 1600 200 100 4 I 61.4280 *' 17632000 1536000 512000 256000 32000 4000 2000 So 20 I 1228.56 *' 24 DIVISIONS OF TIME. Divisions of Time. Seconds. Minutes. Hours. Days. "Weeks. Julian Years. 60 3600 86400 604800 31557600 I 60 1440 10080 525960 I 24 168 8766 I 365 j^ I 52T8 I The Mean Solar or Gregorian year is the interval Gregorian year. between two successive passages of the sun over the Vernal equi- nox, and is=:365d, 5h, 48m, 49.7sec.=the Civil. Year=365. 2422 18 days. The Gregorian Year was instituted by Pope Gregory XIII in 1582, and is now the Civil or Legal y^-d^r. It contains 365 days for 3 successive years, and on the 4th, 366, excepting on those centennial years whose number cannot be exactly divided by 400. Thus the error is only I day in 3866 years. The Julian year contains 365 )^ days, which is too great by juiian year. urn., 103^ seconds, or I day in 120 years. The Common j^ear extends through ^6^ days from common year. midnight December 31, excepting on a leap or bissextile year, when there are 366 days. A leap year is one whose number is divisible by Leap year. 4, except those divisible by 100 but nothy 400. e\g\ 1800, A siderial year is the interval between two sue- sideriaiyear. cessive arrivals of the earth at the same point of the celestial sphere. The 1st point of Aries is usually taken. A month is the interval of one lunation or 29 ds., a month. 12 hs., 44 m., 2.84 sec, or nearly 29^ days, and is called a lunar month, but for business purposes the calendar months of 28, 29, 30 and 3 1 days are sanctioned by custom. MISCELLANEOUS TABLE. 25 \ Zi'orkin^ day for government employees con- a workinfj day. sists of eight hours.* With engineers and f irmers it is fre- quently from sunrise until sunset. — Revised Statutes, ^ 3738. June 28, 1868. Eight hours shall constitute a day's work for all laborers, workmen and mechanics who may be employed by or on behalf of the Government of the U. S. Fourteen days=one ''fortnight.'' Ten years=i decade. Fortnight. Miscellaneous Table. 12 units=i doz. 12 dozen=i gross. 12 gross=i great gross. 20 units^l score. 24 sheets of paper=l quire. 20 quires=i ream. 2 reams=i bundle. 5 bundles=i bale. 25 lbs. of powder==i keg. 300 lbs. cement=i barrel. 100 lbs.= i quintal. 3^ cub. ft.=3 bush. (struck)= I barrel. 14 lbs. of metal=i stone. 21^ stones=i pig. 8 pigs=i fother. 18 inches=l cubit. 3odegs.= i Sign of the Zodiac. 12 Signs=The circle of the Zodiac. 90 degrees=i quadrant. 60 dep:rees=i sextant. A sheet of "medium paper" 24x38 doubled i,ooksu.«. Foiio, once forms a folio ; doubled twice, making four ^'^■ leaves, a quarto ; doubled thrice, making eight leaves, an octavo ; folded into twelve leaves, a i2mo. ; into eighteen leaves, an l8mo. ; and into 24 leaves, a 24mo. * The Attorney General decides now (1877) that contracts may be made with laborers, and others for ten (10) hours per day, and that if they elect to work (8) hours they are to be paid pro rata. 26 artisans' work and materials. Section III. Notes on the Measiu'hig of Artisa7is' Work av.d Materials, Lumber is sold by the square foot of surface 07ie Lumber inch thick known as board measure (b, m,). One foot b. m. there- fore contains i//.^ cubic inches^ which is the unit of Unit, measure. If the material be more or less than an inch thick, find its cubic contents in inches and divide by. 144. Should ^^5^^^ calculating any one of the dimensions be expressed in feet contents. divide their product by 12; and any two dimensions expressed in feet multiplied by the third in inches will give the contents in feet b. m. Round timber may be measured either by the Round timber. number of lineal feet of a given cross-section the How measured, stick will square ; by the number of cross-ties or fence rails it will make ; the number of feet b. m. it will furnish or the amount of cord wood that may be cut from it. All spruce and white pine spar timbers under 1 1 5^^^.^^ .^^^^ ^^^ inches in diameter are called *' inch spars ;" those p^^*^^- over it, *^ piece sparsT For the volume of round timber take the sfirth at ^^ ^ , , o lo find volume o the middle, and multiply the square of one-fourth ''°""'^ ^''^''''''• of it by the length. If ash or beech, deduct J^ in. from the quarter girth before squaring, for the bark, if any ; and from I to 2 inches for oak, elm, fir, &c., according to thickness. Hewn Timber. Straight pieces are estimated either by the n///- straight pieces. fling, superficial or solid foot. Keel pieces by the running foot. Keei pieces. Wharf and crib timbers are measured on the face wharf and crib or upper side of the log, and sold by the superficial t^'"'^'^''- foot; whilst crooked, curved, and all pieces hewn i^eguiar pieces and to a particular shape are sold by the piece. If pur- ^^'''^''- AKTiSAiNs' WORK AND ^lATERIALS. 2/ chased by the government they are all measured by tlic solid foot, except kncfs, which are bou«^ht by the inch; f of the smallest girt of the arm in inches is considered the contents of the knee in feet. Scnvcd timber=lumber, by the looo ft. (per M.) pJlX',;'"^'^"^'' ''^ b. m. Cai'pe7iters' aiid Joi/icrs' IVork."^ Includes all the woodwork in buildings, which is loosq. ft. \.\x ^^ y » Dimensions of cubic foot is assumed to contain twenty bricks ^'■''^''^■ ^Yz" X4'' X2}4 ') a cubic yard, 600 ; and a perch of 22 feet, 500 in the wall. When brickwork is done by the rod it should be reduced to the standard thickness of a brick and a half or " 13 inches." To find the number of bricks required for a wall -r ^ , , u i 10 hnd the number of c^^iven dimensions allow ^ of the volume for of •^"cks in any c> i *J wall. mortar and deduct all apertures for doors and win- dows. Brick work in tunnels and arches is usually meas- Tunnels and arches. ured by the cubic yard or perch of 25 feet. It is customary to estimate the number of bricks xt u ru ■ 1 -^ Number of bncks to in a wall by allowing a certain number, for each "'■'^^'' volumes. superficial foot, varying with the thickness ; thus a 4" inch wall 32 artisans' work and materials. contains 7 bricks per sq. ft. ; a 9 inch wall contains 14 bricks per sq. ft. ; a 1 3 inch wall contains 2 1 bricks per sq. ft., &c , increas- ing by multiples of seven. A square foot of paving takes about 5 bricks. Plastering. Plastering on th^JIat is usually measured by the unit for plastering square yard, sometimes by the "square" of lOO sq. is the square yard. ft. It is of two kinds, that on laths known as ceiliiig^ and that on walls, as renderi7tg, '"§• Cornices, mouldings, &c., are estimated by linear cormces.&c.when measure, and an additional foot is added for each more than i ft. wide. mitre. When more than 12 inches in gjrt, the square foot is taken as the unit. Deduction is made for doors and windows. Deduction. One cent extra is usually allowed for each lineal Extras. foot of corners, and chimney breasts which project less than 9 inches are assumed to be of that width in measuring. Whitening, coloring or kalsomining arc measured Coloring, in the same way as plastering. Ceiling and render- Painting. Painters' work is computed in square yards. Unit=a sq. yd. Every part is measured where the color lies, and How measured. the measuring line is forced into all the mouldings and corners. It is sometimes computed by the number of pounds of paint consumed. Double measure is allowed for carved mouldings. Allowances. Windows, sash frames, sky lights, &c., are done Piecework. by the piece. For balustrades take the length of the hand-rail Balusters. for one dimension, and twice the height of the balusters upon the landing plus the girth of the hand-rail for the other. In trellis or lattice work double the area of one Treiiiswork. side is often taken as the measure of both. artisans' work and materials. 33 Glazijig. Glaziers compute their work b\' the square foot, cbzing by the sq. in which case the sash is iuchided, by the h'ght. f'^ot. or light. For circular and oval windows take the extreme ^. , , , Circular and oval dimensions, and their product will be the area as ^^'^'^^^^s. computed. Roofing. . Slaters and tilers compute the contents of their Area of roofs, work by multiplying the length of the ridge by the girth or "girt" from cave to eave. In takincr the e^irt for slating^ the line must be ^^ , , ,, .,, c> o tD io take the girt for extended under the eaves until it meets the wall, slating; for tuing. but for tiling it is only brought to the eaves. Double measure is allowed for hips, valleys, gut- Extras, ters, &c., and no deductions are made for chimneys, skylights, &c., unless expressly stipulated. The area may be expressed in sq. yds. or squares. Sq. yds.=unit. PliDnbinor^ =w7 hence to find the SPECIFIC GRAVITIES. 35 Specific gravity of a fluid, weigh a body whose S G is known, both in the air and in the fluid. The loss of weight will be that of an equal \'okinie of the fluid, tlien as the weight of the body (W) is to the loss (W), so is the specific gravity of the body to that of the fluid. The annexed table will be found of value, in connection with the formulae of Section I, in enabling the engineer to compute the weight or volume of various substances. It is arranged alphabetically and compiled from numerous authorities,* that it may be as complete as possible. The weights are computed from the specific gravity by multiplying by looo and dividing by 16 to reduce to pounds. Chiefly Brandt;, Jos. P. Cook, Haswcll, Hurst, jMolesworlh, Spon and Traulwine. 36 TABLE OF WEIGHTS AND SPECIFIC GRAVITIES. ALPHABETICAL TABLE OF WEIGHTS AND SPECIFIC GRAVITIES. Acacia wood Acetone Acid, acetic, monohydrated " " greatest density " arsenic " arsenious " benzoic " boracic, crystalized " " fused " carbonic " chlorohydric, concentrated, liquid -. *' citric ** cyanohydric ** formic , " fluoric " hydrocloric, (muriatic) " hyponitric " hyposulphuric, most concen " molybdic , " nitricj fuming " ** of commerce Sp. Gr. Agate . Ai "_ tetrahydrated oleic phosphoric, liquid solid silicic, quartz " agate ** opal sil. hydrate sulphuric, most concentra'd. sulphurous tannic tartaric telluric tellurous Alabaster Alcohol, absolute 60° " greatest density. •' of commerce " proof spirit Aldehyde Alder wood Alum ( corundum, Alumina, < sapphi ( ruby, " emery Aluminate of magnesia, (spinel) . " of zinc Aluminium Amber Ambergris Amethyst, common mdum, ^ jhire, > . •750 •79 1.068 1.079 3 391 3.782 .667 1.479 1.803 .00197 1.208 1.034 .696 1. 116 1.060 1.200 I-45I I 347 3.460 I-45I 1.220 1.420 .898 1-558 2.800 2.653 2.615 2.250 i.£ 2.210 Weight of a cub. ft.inlbs. 2.615 .001205 2.700 .792 .927 •834 .916 .790 .800 I.714 4.160 3.900 3.700 4.700 2.600 I 078 .866 2.750 46 5 49.4 66.37 67-3 212 233 41.7 92.44 112. 7 .123 75-5 64.67 43-5 70. 66.25 75.00 9c. 7 84.2 216.25 90 7 76.25 88.75 56-125 97-37 175 165.6 163 140.6 115 o A 163.4 •075 168.75 49 5 58.0 52.1 57-25 49-4 50. 107. 1 260.0 243-75 231-25 293-75 162.5 67.37 54-1 172. ol Amethyst, oriental Amanthus, .313 to i.ooo.. . . Ammonia, aqueous Antimony, cast, 6.67-6.75.. " native Apple wood Aqua fortis, double " " single Arragonite Arsenic Asbestos, starry. . , Ash, perfectly dry, average. ■ American, white, dry. Asphaltum, .905 to 1.65 Azure, stone B Bamboo Barytes, Sulphate of 4. — 4.558... " carbonate of 4.1 — 4.6 Barium Basalt 2.421 — 3.000 Bath stone (Oolite) Baytree wood Beech " .852 — .690 Beech ** perfectly dry Beer Beeswax Beryl, oriental ' occidental Bichloride of mercury Bismuth Bisulphide of mercury ' tin Birch Bitumen, liquid Blood, human Blood, crassamentum of Borate of magnesia, boracite Brandy Brass (copper and zinc) cast av " cu. 67, zinc 33 parts " " 84, tin 16 " rolled or plate " wire Brick, pressed ■' common, 1.367 — 1.40 " fire .- -'.. " work in cement " " in mortar 1.6-2 " soft Bromine Bronze, Cu. 8 parts, tin i, gun metal Sp. Gr. 3-391 -657 -857 6.710 6.670 -793 1.300 1.200 2.900 S-673 3-073 •752 .610 1.277 2.850 .400 4.279 4-350 .470 2.710 2.100 .822 .771 .624 1.034 -965 3-594 2.723 5.420 9.822 8.124 4-415 ■567 .848 I-053 1.245 2.500 .924 8. 100 7.820 8.832 8.380 8.214 2.400 1-633 2.201 1.800 i.Soo 1.600 3.00 8.500 Weight of a cub. ft.in lbs. 212.0 41. 1 53-6 41937 417-9 49 o 81.25 75.00 181.25 354 6 192. 1 47.0 38-15 80.0 178.15 25.0 267.3 272.0 29.4 169.4 131-25 51-4 48.2 39-0 64.62 60.31 223.4 170.2 338.75 614.0 507-75 276.0 354-4 53.000 65-875 778 156.25 57-75 506. 488-75 552.0 524-0 513-4 150.0 102. 1 137.6 112.5 112.5 100.0 187.S 531-2 5 TABLE OF WEIGHTS AND SPECIFIC GR.WITIICS. 37 Bullet, wood Butter Butternut wood. Sp. Gr. c Cadmium Calcite, transparent 2.52-2.73 Calcium Campeachy wood Camphor Caoutchouc (India rubber) Carbon, diamond ' ' graphite Carbonate of Barj'ta " " Iron (iron spar) " " lead (white lead) " " lime, arragonite " " " Iceland spar '• " magnesia, giobertite. " " manganese " " strontia Carnelian (speckled) Cedar, wild '• Palestine " Indian; Cement, Am. hydraulic Rosendale, loose Cement, Am. hydraulic, well shaken Cement, Am. hydraulic, thorough- ly shaken Cement, a struck bus. loose, 75 lbs " well shaken, 88 lbs " " packed for sale 100 " I bbl. contains 3 struck bushels, or 3^/^ cub. ft. packed Cement, " Portland ? about no C a V. . " Roman 5 Ihs. bush. ( av. . Chalcedony, common, 2.6-2.65... Chalk, 2 .75v;-2.657 Charcoal of pine " fresh burned " of oak " of soft wood •* triturated Cherry "' well seasoned Chestnut, perfectly dry Chromium Chloride of ammonium (sal. am- monia) Chloride of barium ■' calcium silver " sodium " potassium Chromate of lead " of potash ChrA'solite, 2.782-3.400 Cider Cinnabar " from Almaden Citron wood Clay, dry potters, i . 8-2. i '" " in loose lumps Clay, with gravel Coal, anthracite, i. 436-1. 64 " a solid j-an' makes i|^ yds. when broken for use .928 .942 •376 8.690 1.620 1.5S0 •913 .998 •903 3o30 3-500 4.300 3-850 6.730 2.Q46 2.723 2.880 3550 3-<55o 2.613 •596 .613 1-315 1.300 1.560 2.625 2-454 .441 .380 1-573 .280 1.380 •715 .672 .660 5-900 3.200 5-548 2.100 1.836 6.600 2.700 3.091 I 080 8.098 6.920 .726 I. goo AVeight I of a cub. ft. in lbs. I 58.0 58-875' 23-5 543-7 163-75 9^-5 57.00 62.4 56-4 220.6 218.75 268.7 240.6 420.6 184.1 170.2 180.0 222. 228.1 163-3 37-25 38.3 82.157 60. 70. 80. Coal, cannel, 1.23S-1.318 " caking " bituminous, 1.2-1.5 " broken, loose •' a heaped bush. 70-78 lbs. . . *■ a ton occupies from 43-48 cub. ft Cobalt " cast Cocoa, wood Coke " loose, of good coal *' National of Va " a heaped bush., 35-42 lbs. . . '' a ton, 80 to 97 cub. ft Columbium Concrete, mean Copper, cast " rolled " wire Copal Coral, red " white Cork Cornelian Corundum Crab tree Cypress tree " " well seasoned jWeiKht bp. Or. of a cub. ft. in lbs. 1.278 1.277 I-350 80. 79.8 84.4 47-52. 2.480 1-538 81.25 97-25 164 153-4 27.562 23-75 98.312 17-50 86.25 44-7 42.0 41.25 368.75 95-0 231-5 200. 346-75 131.25 "4-75 412. s 168.7 193-2 67-5 506.1 432-5 45-4 119 63- I55-0 96.1 Deal wood, Christiana Deutiodide of mercury- Deutoxide of mercury- " copper tin. Diamond, oriental colorless. . . " " colored, av. :' Brazilian " " colored Dog wood Dolomite, 2.54-2.83 Dragon's blood (a resin) Earth, dry common loam, loose. " " soil " loose dr\' " " slightly moist " shaken, more " " fluid mud " moist sand " mould, fresh ' ' rammed " rough sand " with gravel Ebony, American " Indian Egg Elker wood Elm, perfectly drj' Elm Emerald Emery Ether, acetic " chlorohj'dric " muriatic " nitric " sulphuric 8.600 7.812 1.040 1. 000 .746 6.000 2.000 8.788 8.95 8.88 1-045 2.700 2.550 .240 2.613 3.710 -765 •644 .441 6.320 11.000 6.130 6.700 3-521 3-536 3-444 3 550 -756 2.685 1.280 2.194 1.500 537-5 488.25 65.0 62.5 23.-32. 46.62 2.050 2.050 1.600 1.920 2.020 1-331 1.209 1.090 .695 .570 .671 2.680 4.000 0.868 .874 •729 375.0 125.0 549.23 560.0 555-0 65-3 168.75 160.0 15.0 163-3 232.0 47.81 40.25 27.6 43. 3950 6S7.5 383.12 418.75 220.1 221.0 215.25 222.0 47-25 168.0 75-25 72.-80. 137^^ 93-75 70.-76. 75- -90- 104-1T2 1281/8 i?S^ 100. 120. 126I< 861,6 75l< 68.0 43-4 35-6 42.0 167.5 250. 54-1 54.6 45-6 5^-75 44-7 38 TABLE OF WEIGHTS AND SPECIFIC GRAVITIES. Fat of beef " hogs , " mutton Feldspar, 2.438-2.700 Filbert wood Fir, Norway Firestone Flint, black •* white Fluoride of calcium (fluor spar) . Fluorine Fusel oil Gamboge Garnet, precious, 4.-4.23 " common, 3.576-4 Glass, 2.50-3.45 " bottle " common window, crown " thick flooring ** green " flint, 2.76-3.00 " optical "_ white Gneiss, common, 2.62-2.76 " in loose piles " hornblendic Granite, Egyptian red " Patapsco " Old Dominion, Va " Quincy " Scotch " Susquehanna, Pt.Deposit. Gravel, about equal to sand Greenstone, ftrap) 2.8-3.2 " in loose piles Grindstone Gold, cast pure, 24 carat " native pure " hammered pure, 19.4-19.6.. " 22 carat '• 20 '; Gum Arabic Gum tree, blue " water... Gimpowder loose " shaken ^°^^^^ 1.800 Gutta percha Gypsum (plaster of Paris) av ' ' in lumps " ground, loose (st. bush. 70 lbs. ) Gypsum, ground, well shaken, 80 lbs , Gypsum, ground, thoroughly sha ken, golbs , H Hackmatack wood Hazel " Hawthorn '" Heliotrope (bloodstone) < ' " > Hemlock Hickory, pig nut " shell bark Sp. Gr, .923 •936 •923 2.569 .600 .512 1.80 2.582 2.504 3.200 1.320 1.222 4-II5 3.288 2.975 2.732 2.520 2.530 2.642 2.880 3-450 2.892 2.690 2.8 2.654 2.640 2.630 2.652 2.625 2.704 1.749 3.00 2.143 19.258 19.32 19.50 17.486 15-709 1.452 .843 1.000 .900 1.000 1-675 .980 2-305 .592 .860 .910 2.664 .368 .792 .690 Weight of a cub. ft. in lbs. 57-68 58.5 57.68 160.6 37-5 32.0 112. o 161.37 156-5 200. 82.5 50.5 76-5 257 2 205.5 186.0 170.75 157-5 158.1 165.1 180.0 215.6 180.7s 168. 96. 175. 165.9 165. 164.4 165.75 164.06 169.00 109.31 187. 107. 133-94 1204. 1206. 1217. 1093.0 982.0 90-75 52.69 62.5 56.25 62.5 104.7 61. 1 144. 82. 56. 64. 72. 37.00 53-75 56.87 166.5 23.0 49-5 43-12 H Hickory, red Holly...... Hone, white Honey Honeystone or Mellite Horn Hornbeam, wood Hornblende " black, 3.1-3.4. Hornstone, 2.533-2.810 Hyacinth, 4-4. 78 Hydrogen gas Ice at 320 F India rubber Indigo Iodide of potassium " silver .. lead Iodine Iridium, cast by electric battery. " hammered Iron, cast, 6.9-7.4 " at 450 lbs. to the foot, 86oi.6 cub. in. will make a ton. . Iron, wrought, 7.6-7.9 ': magnetic oxide " cast, gun metal '• hot blast " old blast * ' wire *• rolled plates " large rolled bars Ironstone, 3.28-3.57 Iron wood Isinglass Ivory Sp. Gr. Jackwood Jasmine Jasper, 2.3t;8-2.8i6 Jet-. : Juniper L Lance wood Larch " 5.44-5.60 Lard Lead, cast " rolled Lemon tree Lignum-vitse Lime wood Lime, ordinary quick ' ' hydraulic " ground, loose, st.bush. 71 lb " " well shaken, 80 " " " thoroughly g3}i " Limestones & marbles, 2.85-2.65.. '* one cub. yd. solid makes about 1.9 yds. loose, or 15^ yds, piled when .571 is solid and .429 voids Linden wood Lithium Locust wood Logwood .760 2.876 1.450 1.620 1.689 .760 3-540 3-25 2.671 4-390 000089 .920 ■903 1.009 3.000 5-614 6 100 4.Q. 18.6; 23.000 7-15 7-77 5-400 7-308 7.065 7.218 7-774 7.704 7f 3-475 1-15 i.iii 1.825 .670 .770 2.587 1.300 0.566 720 552 947 352 388 703 333 804 843 745 2.75 .604 •590 .728 -913 Weight of a cub. ft.in lbs. 52.375 47-5 179-75 90.62 101.25 105.56 47.0 221.25 203.00 167.0 273-1 .0056 57-5 56.437 63.06 1S7.5 350.9 381.25 309-25 1167.5 1437-5 446. 485. 337-5 456.7 441.6 451-1 486.0 481.15 480. 217.2 71- 69-437 114.062 42.0 48.125 [61.7 81.25 35-37 45. 34-5 59-2 709-5 712.0 43-94 83-31 50.25 52-7 171-5 57- 64. 75- 172. 37-74 -15-5 45-50 57.06 TAni.E OF WEKHITS AND SPECIl-IC GRAVITIES. 39 M Magnesia, carbonate of •' native hydrate of Magnetic oxide of iron Maliugany, .72-1.063 " Honduras " Spanish Malachite, compact Manijancse ..Maple wood '* bird's eye ^larble, Adelaide '* African " Biscayan, black " Carara " common " Egyptian " French " Italian, white " Parian *' Vermont, white Marl, mean Masonry, of granite or limestone. . " of well scabbled rubble, i-S mortar Masonry, of granite, dry rubble. . . " roughly scabbled rubble }{-yi mortar Masonrj', roughly scabbled, drj'. . " at 155 lbs. per cub. ft., a cub. yd. weighs 1.S68 tons, ' and 14.45 cub. ft.=i T Masonry of sandstone about J^ less than the above Masonry of brickwork, pressed, fine joints Masonry of brickwork, medium. . " " coarse, soft bricks Masonry at 125 lbs. per cub. ft., a cub. yd. weighs 1.507 tons and 1 7. 92 cub. ft.=:i ton . . . Mastic " wood Melanite or black garnet !Mercaptan Mercurj'- at (J-C. or 32° F " " — 40'' F " "+6o°F " " 1I2°F Mica, 2.75-3. ^ Mills tone Milk... Mineral pitch or asphaltnm, .905 -1-650 Mineral tallow Molybdenum Molybdate of lead Mortar, jiardened, 1.4- 1.9 ^lud, dr>' clo.se " wet, moderately pressed " fluid M ulberry wood " Spanish Myrrh Sp. Gr, Weifrht of a cub ft. in lbs 2.400 2.330 5.400 .892 .560 .852 3-790 8.000 •750 .576 2.715 2.708 2.695 2.716 2.689 2.663 2.649 2.708 2.838 2.65 1-75 150.0 145-6 337-5 55-75 3 5- 53-25 237.0 500.0 46.87 36. 169.68 169.25 168.43 169.75 167.87 166.75 165.56 169.25 177-37 165-57 i'^9-37 165. 154- 138. 150. 125- N Naptha . Nickel . 1.074 .849 3-750 .804 13-598 15.632 13-580 13-37 2-93 2.484 1.030 1.277 0.770 8 600 6.700 1-65 .561 .897 1.360 140. 67.125 53.06 234-4 50-25 849.9 977. c 848.75 835-6 183. 155-25 64.4 3.1 537-5 418.75 103. O-IIO 110-130 104-120 35-06 56.06 " cast. Nitrate of baryta . 52 9 8 666 541.6 8.270 517.3 3.185199 1 N Nitrate of lead " potash " strontia Nitre Nitrogen (about 1-35 lighter than air) O Oak, African " Canadian " Dantzic " English " green " heart (60 years old) '• live, green " " seasoned " white, dry " red, black, &c Obsidian Oil of amber. " aniseseed " sweet almonds " bitter " " carraway seed " cinnamon ' ' citron " cloves " codfish " cotton seed " cumin " hempseed " lavender ■' linseed " naptha " olive " palm " petroleum " poppy seed " rape seed " sun flower. " spirea " turpentine " whale " wormwood Olefiant gas Olive wood Oolites or roestones, 1.9-2.5 Opal, precious ' common Opium Orange wood Orpiment, 3.048-3.5 Osmium Oj-ster shell O.vide of bismuth 9 " silver " zinc. O.xygen gas (1-10 heavier than air) Sp. Gr. 'of .It lib. :ft.inlbs. 4. 400 277. 5 1.930 120.6 2.S90 1S0.6 1.900 118.73 Palladium rolled Paving stones Pear wood Pearl, oriental, 2-51-2. Pearl, stone Peat, dry unpressed. . Pero.xide of iron " lead .969 .926 60.6 57-9 56- 58-75 53-0 57-i8 60.56 54-875 587 57-12 57-875 73-3 54-37 57 6S 56.7 .079 87.6 37-0 132.1 1127.5 -940 .848 •915 .969 .878 ■939 .914 .926 1-173 .870 •923 .907 .00127 •923 2.200 2.114 2.04 1-3361 °o-5 .7051 4406 3.274 204.6 lo.ooo- 625.0 2.092130.75 8.968 560.5 7.250 453 I 5.600 350.0 .00143 .089 11.300 706.2 ii.Soo 737.5 2.416 151.0 .661 41-31 2.630 164.4 2.340 146.2 20-30 5.225 326.6 9.200 575.0 40 TABLE OF WEIGHTS AND SPECIFIC GRAVITIES. Peroxide of manganese " titanium, rutile Persimmon wood Peruvian bark Petroleum Phosphorus Pine, Dantzic " Memel " Riga " white, perfectly dry " " looo It. b. m., weighs .930 ton Pine, yellow Northern, .48-. 62 " 1000 ft. b. m. weighs 1.276 T. " yellow, Southern, .64-. 80... " " " heart, un- seasoned Pine, pitch Pitch Pitchstone, 1.92-2. 72 Plaster of Paris P latinum " wire " rolled " in grains, native forged ' Plum wood Plumbago or graphite Pomegranate Poon wood Poplar " white Porcelain, China " Sevres Porphyry, red " Seltzer Potassium at 59° F Powder, slightly shaken Proof spirit Protoxide of antimony " copper " lead, cast Protohcloride of mercury Protoioide *• " Protosulphlde of tin " manganese " copper Pummice stone, .792-. 9 14 Quartz, common pure " finely pulverizedjloose " " " well shaken " "_ " packed.... *• quarried loose, i part solid, makes i^-^ loose Quince wood R Realgar, 3.225-3.38 Red lead Red oxide of manganese. Resin or rosin Rhodium Rock crystal Rosewood Rotten stone Ruby Ruthenium Sp. Gr. .480 .250 .710 .784 .878 .770 .649 .550 .466 ,400 •550 17 .720 .04 ■ ISO .150 •345 .176 •530 .042 .060 .500 ■336 ■78s .200 ■351 .580 .383 •529 .300 •145 •765 .003 • 865 .000 .916 778 300 500 140 750 267 950 2.65 •705 278 ,940 .722 089 .650 ■735 728 981 04 600 Weig-ht ofa cub. ft. in lbs. 280.0 265.6 44-375 49.0 54-875 no. 6 40. 34-3 29.0 25.0 34-3 45-0 65.0 71.7 71.9 146.6 73-5 1342. ^315 I 1379- 1094. 1271. 49.06 137-5 84.62 36-25 23 9 33-o6 143-75 134-1 172.8 62.7 54-1 62.5 56.0 361.0 331-2 593-7 446. 484,4 329.2 24 7.0 355-6 55-2 165.0 90. 105. 112. 44.06 204,7 558.7 295.1 68.1 665.6 171.0 45-5 123.8 252.5 537'5 Salt Saltpetre Sand, pure quartz, dry and loose.. " struck bushel, 112-133 lbs. . . " average 98 lbs. per cub. ft.. " a struck bush. =122,^/2 lbs and 18.29 bush.=i ton. A cub. yd. = i.i8i tons, and 22.86 ft.=i ton Sand, well shaken, st. bush. 123- 147 lbs Sand, well packed " perfectly wet, drained off. . . Sandstones, for building, dry, 2. 10 -2-73--.- Sandstones, piled, i measure solid ^ =''yi Sapphire - " oriental Sardonyx Sassafras wood Satin wood Scammony of Smyrna Schorl Sea water Selenium Selenite of lead Serpentine, 2.264-3.00 Sesquioxide of manganese Shale, red or black Shingle, (pebbles and sand) Silicate of zirconia Silver, pure cast " hammered " glance, 5.2-7.2 Slate, 2.672-2.90 " purple " drawing Smalt Snow, freshly fallen " compacted by rain Soapstone or steatite, 2 65-280. . . Soap Sodium at 59'' F Spar, fluor 3.094:3.791 ", feld. " calc, 2.62-2.837 Spelter or zinc, 6.8-7.2 Spermaceti Spruce Stalactite. 2.323-2.546 Starch Steam Steel, 7.8107.9 " plates " soft " tempered and hardened " wire Stone, Bath, Eng " BlueHill " Bluestone (basalt) " Breakneck, N.Y " Bristol, Eng ' ' Caen, Normandy " common " Craigleth, Eng " grind " Kentish rag " Kips bay, N. Y " Norfolk, Parliament house. " Portland, Eng Sp. Gr. 2.07 2.090 1.65 2 41 3-994 4,100 2.615 .482 .885 1.274 3.170 1.026 4.400 7.690 2.634 4.810 2.600 1.420 10.474 10.5 1 1 6.25 2.791 2.784 2. no 2.440 2-73 1. 071 .972 3-442 2.700 2.729 7.000 •943 .500 2-434 •950 .0088 7-85 7.806 7-833 7.818 7.847 1.961 2.640 2.625 2.704 2.510 2.076 2.520 2.316 2.142 2.651 2-759 2.304 2.368 Weight ofa cub. ft. in lbs. 129.4 130.62 90-106 99-117 101-119 120-140 150. 237.1 256.2 163.4 30.122 55-315 79-6 198.1 64.1 275- 480.6 164.6 306.2 162.5 88.7 654.6 686.9 390.6 173-2 174. 132. 152- 5 to 12 15-20 170. 66.9 60.75 215-1 168.75 170.6 437-5 58-937- 31-25 152-1 59-37 •05 s 490.0 488. 489.6 488.6 490.4 122. 56- 165. 164. 169. 156.8 129-75 157-5 144-75. 134.0 165.6 172. 144. See Gen. Q. A. Gillmore's Report on the Strength and Specific Gravity of Building Stones. TABLE OF WEIGHTS AND SPECIFIC GRAVITIES. 41 Stone, rotten " sandstone (mean) " Sydney " StatenId.,N.Y " Sullivan Co Strontium Sugar — Sulphate of Bar^'ta, (heavy spar). " strontia (celcbllnc) lead silver " lime (anhydrite " " g^-psum " potash " soda, anhydrous Sulphide of antimony " bismuth " carbon " lead, galena " molybdenum " silver - " zinc (blende) Sulphur, native -. ' ■ fused Sycamore wood Talc, mean '< black Tallow Tamarack tree Tar Teak, African oak, 6.57-7.45 Tellurium Thalium Tile Tin, Cornish hammered " " pure Topaz (oriental) Tourmaline Trap Tungsten Turf, or peat dry and unpressed. Turquoise. 2.50-3.00 Weight Sp. Or. I of a cub. ft.in lbs. 1.98] 2.400, 150.0 2.237'i39.8 2.976 186. 2.688! 168. 2.540J158.7 1.606 100.4 4.700.293.7 3.950,247.0 6-300J393.7 5-340 2.900 2.305 2.400 2.630 4-334 6 540 3--i3-7 1S1.2 144.0 150.0 164.4 270.9 408.7 i.263'7S9.4 7-580 473.7 4.600J287.5 7.200 450.0 4.16c 260. "' 130-4 124.4 39-0 1.990 .623 2.S00 2,900! .940 .383 1. 00 .701 6. no 11.850 1-815 7.390 7.291 4. on 3.210 2.720 17.600 u Sp. Or. Ultramarine . Uranium 2.750 I75-0 1S1.25 58.6 23-93 62.25 43-8 382.0 740.6 113-4 462.0 455-7 250.7 200.6 ■170.0 IIOO.O I 20-30 172.0 Vine wood [Vinegar, 1.013-1.030. W Walnut wood " black.... Water, pure rain or distilled, at 32' " 60^ '• sea " Dead Sea " Meditteranean Wa.x, bees " shoemakers • Whey, cows White oak, upland *• James River Willow, .585-. 486 , Wine, Bordeau.x , " Burgundy , " white champagne " Const.ance " IMadeira '• Malaga I " Port 'Wolfram Woodstone, 2.045-2.675 Yew, Dutch... j " Spanish. Zeolite- Zircon Zinc, cast. .. " rolled. 2.360 18.23 1-327 1.047 .671 .500 Weijjht of a CUD. ft.in lbs. 1. 000 1.026 1.2481 1.0291 •965 .897 1. 019 .687 •759 •535 •993 .991 •997 1. 081 1.038 1.022 •997 7. 119 2.360 .788 .807 M7-5 114. 8 83.0 65,5 41-937 31-25 62.37 62.331 64.1 78.0 64.3 60.5 56.1 65.0 42.9 47-3 33-4 62.1 62.0 62.3 67.6 65.0 64.0 62.3 445- 147-5 49.2 50.4 2.40 150.0 4.542 284.0 6.861 428.8 7.191 449.4 42 ESTIMATE FOR RAILROAD SUPERSTRUCTURE. Section V. The accompanying estimates for one mile of R.R. super- structure, and for an art building, will illustrate briefly the methods of working up and presenting the data contained in this chapter : Estimate for one mile of Superstructiire for the Cincinnati Southern R. R. * Iron rail at the present time. 94.285 tons Iron Rail, @, $52.75, $4j973 54 360 Joints, @, $1 40 504 00 6000 Spikes, @ $2 85 per C 171 00 2640 Cross Ties, 8 ft. x 6 ins. x 8 ins. and 10 ins., @, 40 cents,.. 1,056 00 Ballasting, -- IjSoo 00 Distribution of Material, 250 00 Laying Track 400 00 $8,854 54 If Steel Rails be used it will require 83.285 tons, @, $76 75, $6,392 12 360 Joints, @, 95 cents, 342 00 And for distributing material 230 00 The remaining items being the same as above, give a total of. . .$10,091 12 The total estimate for cost of track was for 132 miles Steel Rails, @, $10,091 12, ,..$1,332,027 84 129 " Iron '' including 25 miles of turnouts, @, $8.854.54..- $1,027,689 66 Switches and frogs 30,000 00 $3,389,717 50 From which $30,000 were deducted for old rails, leaving. .$3,359,717 50 * From the report of Thos. D. Lovett, Consulting and Principal Eng. Nov. i, 1875. ESTIMATE FOR AN ART BUILDING. 43 REVISED DESIGN IN COMPETITION FOK PROPOSED CENTENNIAL EXHIBITION BUILDING, FOR EXPOSITION OF INDUSTRY OF ALL NATIONS, To LE HELD IN Philadelphia in 1876. John IMcArthur, Jr., Joseph T^I. Wilson, C. E., Architects. LIST OF PLANS TO ACCOMPANY REVISED DESIGN.* 1. South Elevation, Main Building. 2. Plan ot first floor, r^Iain Building. 3. Plan of second floor, JVIain Building. 4. Plan of basement of Memorial Hall. 5. Section through Memorial Hall. 6. Section through Temporary Building. 7. Block Plan. 8. Supplementary Block Plan. 9. Plan showing Temporary Buildings removed. 10. Perspective of Memorial Building. 11. Interior Perspective of Memorial Hall. Plans, Elevations, &c., of Preliminary Design. * These plans are omitted, as the elements of the design are sufficiently manifest from the accom- panying description. 44 ESTIMATE FOR AN ART BUILDING. TO THE HONORABLE THE COMMITTEE ON PLANS AND ARCHITECTURE, OF THE U. S. CENTENNIAL COMMISSION: Gentlemen : — In presenting our modified preliminary plans of the pro- posed Centennial Exposition Buildings, for a second and final competition, we respectfully call attention to the following essential and consequently imporiajit considerations : ist. Our design can be executed without fail between now and 1876. 2d. It admits of the most plain and common sense application of the dual classification. 3d. It is built of the ordinary materials — iron, brick and wood — in every day use in the United States, and they are used according to the latest and most improved methods of construction. 4th. Both the exterior and the interior efTects are more imposing than those of any previous Exhibition Building in the world. 5th. The ordinary rolled sections of wrought iron having been used, and the reduplication of parts having been carefully attended to in working up the design, the result is that these superb effects can be obtained at the most reasonable cost. 6th. We confidently believe that the Memorial Hall will be found, when left standing alone after the Exhibition is over, to be a fair representative of the progress which America has made in Engineering and Architecture during the past hundred years. We have made the following modifications in our design : First, we have abandoned altogether the use of galleries Modification of for exhibition purposes ; and secondly, we have simplified original design. the construction of the temporary portion of the building ; omitting the towers and modifying the fronts so as to lessen as far as practicable the cost of this part of the structure, consistent with a creditable appearance, and a proper adaptation to the purposes in view. The space formerly provided in the galleries has been transferred to the first floor, thereby enlarging the plan, and in this respect, perhaps, increasing the expense; but there is no doubt as to its being a decided improvement for exhibition purposes. In order to obtain good views of the scene below, narrow galleries have been placed in the Memorial Hall, and in certain parts of the Temporary Build- ings ; but they have not been included in what would be denominated the exhibition space of the structure. The block plan shows the general arrangement of the The block building, and its accessories. The portion tinted carmine p^^"- represents Memorial Hall; and that tinted India ink, is the temporary part. ESTIMATE TOR AX ART JJLTLDING. 45 GENERAL DESCRIPTION. The modified design comprises a central, permanent, Memorial Hall, flanked by two equal temporary wings. The Memorial Hall itself forms a complete design, either alone or in connection with the temporary parts. The Memorial Hall consists of two principal parts cross- Memorial ing each other at right angles, forming a nave with transepts, ^^'^• at the intersection of which, in the centre, rises a tower. This is entirely of skeleton construction, built of wrought iron, and the lower „,, ' . . I he tower. portion open, so as to obstruct the view as little as possible ; being formed of sixteen columns, arranged in sets of four each, with those of each set braced vertically and laterally, to resist the heaviest winds. The exterior portion above the roof of the building is covered with galvanized iron on the vertical sides, and slate on the roofs ; and at proper intervals in the height, floors are laid to furnish outlooks to visitors ; access being had to the same, by convenient stairways and steam elevators, stairways and Platforms are intended on the ridges of the main roof, ac- ^^"^^"^ elevators, cessible from the tower. These platforms will not be observed from the ground below, and will be found very attractive as promenades. The four main fronts of the building are each designed so as to be finished and com- plete in themselves, when the temporary structures are removed. The south front, which we consider the main approach, provides South entrance or on the first floor an ample entrance flanked by waiting mam approach, rooms, both for ladies and gentlemen, with all appropriate conveniences ; also, coat room, telegraph office, and news stand. A portion of the area under the main roof, and not interfering wdth the classified Restaurant. exhibits, is devoted to restaurant purposes, as also are open corridors or porches on the sides. A basement is intended under this front, divided into kitchens, pantries, rooms for steam boilers, fuel, cellars, &c.; ^^. , ^ ' ^ 7 ^ Kitchens, Pan- boilers will furnish steam for cooking, for heating the build- tries, Steam ings when necessary, and for motive power for elevators. The kitchens connect with restaurants above by dumb waiters. From the first floor, the second floor is reached by wide stairways. It Pover or concert contains a foyer or concert room, retiring rooms, and some ^°°"^- smaller rooms which may be used by commissioners, or rented to officials representing the various countries exhibiting. Such rooms w'ill be found very convenient, and can readily be let at remunerative rates. The foyer opens on a gallery next to the interior of the building, w^hich Galleries. communicates with open corridor restaurants at the sides, and connects with galleries extending around into the transepts, and having stairways in the transept towers to the first floor. The foyer communicates in the front of the building with an open air promenade over the main carriage porch. The north front provides on the first floor, the proper conve- North entrance, niences for visitors entering at this end of the building ; and also contains a restaurant within the building, and open corridor restaurants at the side. Wide stairwavs communicate to a lars^e orgran and orchestra Oroan. 46 ESTIMATE FOR AN ART BUILDING. or chorus gallery, from which side galleries run the whole Orchestra gallery, length of the nave, and around into the transepts, the same as those from the south front. Under this front is a basement or cellar, that may be used for the same purposes as that under the south front. There is ample water closet accommodation on the first floor of the transept towers. The Memo- rial Building being intended to be permanent, there are certain features in way of kitchens, cellars, heating apparatus, &c., introduced, not so much on account of being required now, as that they will be needed in the future. The two equal portions of the temporary building con- Temporary portion necting with the permanent building at the transepts, may °^ *^^ bmidmg. be said to consist each of a nave, with transepts facing north and south. The nave is available directly for exhibition purposes, forming with the tran- septs of the Memorial Building, a grand space of 2,040 feet q^^^^^ sp^ce for loner by 360 feet wide. In the transepts are located offices, exhibits, with 1 • . . . o -n r ,1 offices, &c. ample waitmg rooms, restaurants, &c., as will more fully appear on examination of the plans. These departments all require provi- sion to be made for them, and we prefer placing them in transepts, distinct as it were from the exhibits, yet convenient to them, thus allowing us to obtain the necessary projections for a fine facade to the elevation, and at the same time fully utilizing all of the space. The width of the nave, 360 feet, is made up of a centre -^^^^ ^^^ rj,^^j^_ span of 120 feet, two spans of 72 feet, and four spans of 24 septs. feet each. Small galleries have been introduced in the transepts and at the ends of the naves, the latter communicating with outside terraces or porti- coesj from which fine views can be obtained. The suites of rooms in the second floor of transepts, can be made use of for bureaus of foreign com- missions, &c. It will be seen by reference to the cross sec- Light, tions, that ample light has been obtained for the whole building without re- sort to skylights. There are certain portions of the temporary buildings contiguous to the Memorial Hall, and marked A A, BB, on the block plan, that have been taken in our computations of areas, estimates, «&c., as temporary, but which we would recommend to your committee, if possible, to retain as perma- nent, when the temporary buildings are removed. The open corridors or porches, AA especially, now intended for restaurant purposes, will be found very pleasant adjuncts to the permanent building, and in working up the perspective for this, we have shown them as retained. We would call attention to the great number of openings Openings and that we have provided for the reception of goods. The ^^^'^^• main entrances are all large and commodious, and all of the first story win- dows open to the floor, in the temporary and permanent building, forming doors of 10 feet width of opening, 07ie occtirring on the side of the building every 24 feet. These are all available for the reception of goods, and may be used or not after the exhibition opens, as may be desired. Levels and The level of the floor of the building has been assumed at shades. ESTIMATE FOR AN ART BUILDING. 47 1 1 8, and of the ground outside the walls, at 114, which is about the grade of Belmont avenue. This will allow us to cross Belmont avenue with our temporary tracks at grade, and run them into the building Railroad commu- 4 feet below the level of the lloor. This is the standard "'Nation, height adopted in this country for freight platforms above the rails. It is the most convenient for unloading, as it brings the floor of car level with the platform of building ; and joist can easily be introduced and floored over a few days before the exhibition opens, leaving the track below ready for use again when the exhibition is over. We have introduced four tracks through the whole length of the building, and more can be put in if desired. Underneath certain portions of the floor of the temporary storage of empty buildings, considerable area occurs, and the idea has been ^°^^^- suggested of appropriating this to the storage of empty boxes, &c. It would be very useful for this purpose, except on account of the great risk from fire, and for this reason we w^ould not recommend it. R'^'^ ^^°"^ '^'■^• Dust is a great trouble to exhibitors, and it is absolutely Removal of dust necessary to adopt the best means of removing this expeditiously and quietly. We know of no better method than that of laying the temporary floors with a narrow space between the boards, into which the dust may fall; the same as adopted in most of the previous exhibitions. This plan is open to the objection of allowing articles, carelessly dropped, to fall through and be lost. If the floors are laid close, the dust accumulates very rapidly, and must be swept up in piles and conveyed away, at considerable trouble, ex- pense, and risk of spreading again over the exhibits. The utmost care might not prevent a match, for instance, from dropping through one of these openings, and the presence of boxes and packing cases below, would increase the risk of fire immenseh'. Plan No. 8 shows the system of drainage proposed for Drainage. the building, to connect with a main sewer on Forty-eighth street. It also shows the arrangement of water supply, fire plugs, and gas pipes. No previous exhibitions have been artificially lighted, or i^i„^^ij^„ .^yjth open at night, on account of the danger from fire. There g£^s and night is no doubt that the receipts would be vastly increased, if such an arrangement v/ere possible. The public in this country are not as well accustomed to day exhibitions as in Europe ; and our previous experi- ence in all cases has been, that the evening receipts amount to a large pro- portion of the total. What we propose is, to light the building by large reflectors, such as are used in our railroad depots, suspended from the roof, and rows of lights along the various iron cornices, where necessary, the gas being ignited by means of- electricity, as now in practical use in many places. Gas itself drops no sparks. By such a method of lighting, the burners being far above anything inflammable, the risk of fire would be at a minimum. 48 ESTIMATE FOR AN ART BUILDING. DIMENSIONS. The following are the principal dimensions of the build- Dimensions, ing: Memorial Hall. Length of nave, exclusive of waiting rooms at ends, 720 feet. Length through transepts, 456 '' Span, in clear, of nave and transepts^ each, 216 '^ Temporary Building. Extreme length of each nave, — 884 feet. Length through transepts, — 700 ' ' Total width of nave, 360 " " " transepts, 312 " Extreme total length of whole building, 2,224 '^ Area available for classified exhibition purposes, 734,400 sq. ft... 16.86 acres Portion of Memorial Hall available for unclassified Exhibition purposes, 67,392 sq. ft, 1.55 " First floor area for restaurants, not including open air corridors, 177,808 sq. ft 4.08 " Total first floor area for exhibition and restaurants, without open corridors, , 22.49 '' Area of open corridors, first floor, 29,400 sq. ft o. 6 " Area for offices, waiting rooms, &c 2. 3 " Total area first floor, 25,39 '* Height of central tower to extreme top of finial 500 feet. Side of square base of tower, 120 " Height of nave, floor to ridge of roof, 148 " By way of comparison, in order to obtain an idea of the comparison with dimensions given above, we would state that the span of other bmidmgs. the roof of the Memorial Hall, 216 feet, is 16 feet greater than that of the Grand Central Depot in New York City; that the centre span of the nave of the temporary building, viz., 120 feet, is exactly the same as that of the grand nave at Sydenham Crystal Palace, London, and that the width of the square base of tower, 120 feet, is very nearly the same as the outside diame- ter of the dome on the Capitol at Washington; the height of this tower, 500 feet, being the greatest in the world. The extreme height of the dome at Washington is, 287 feet 5^ inches. St. Peter's, at Rome, 430 Spire of Friburg Cathedral, 385 Spire of Strasburg, 468 Spire of St. Stephen's, Vienna, 441 Spire of Town Hall, Brussels, 374 Spire of Antwerp Cathedral, 406 ESTIMATE FOR AN ART BUILDING. 49 The spires of Cologne Cathedral, when finished, according to the original design, will be 510 feet high, and the height of tower of the new public buildings for the City of Philadelphia, when completed, will be 450 feet. As it regards the height of the nave of the Memorial Hall, which is 148 feet above the floor, we would state that the height of the Nave at Strasburg is loi feet. '' Cologne Cathedral, 155 " " St. Peter's, at Rome, 150 " " Bourges, France, 117 '' " Chartres, 106 *' We are confident that a far finer and grander effect can be produced by a tower as we have designed it, at much less cost than by a dome. The only iron dome of any size in existence, with which comparison can be made, is that at Washington. This dome having the same diameter at base as our tower, and far less height, cost $950,000, exclusive of the base of the old dome which extended from the ground to the height of 68 feet. In estima- ting for the cost of the tower, we beg to state that we have computed all of the material necessary to resist safely the greatest stresses that can come upon it, and have made our estimate from the number of pounds weight of this material, so that we believe our figures are correct. ♦ ****»♦ ESTIMATE IN DETAIL. In accordance with the request of the Commission, by their circular of October 2d, 1873, we hereby furnish the following itemized statement of the quantities and prices of all the material estimated to be necessary to build the structures according to our design as presented. In preparing our estimate we have been conscientious, and we feel no doubt but that the Commission can have the buildings constructed for the amounts we have here stated. Our prices and quantities are full, and it is quite probable in working up the finished drawings, that some of the items can be reduced both in amount and price. We have been careful not to under estimate any portion of the work, but have made it a point in every instance to assure ourselves that the figures presented are a maximum. Memorial Building. Fo7indatioyis a7id Stone IVails. i8,632>^ perches masonry, (r/) $9.00 $167,693 00 4,000 perches masonry, @ $10,00, 49,000 00 $207,693 00 Bricks and Brick Work. 13,264,257 bricks, @, $35.00 per M 464,249 00 (The price of brick is made to include a large amount of ornamental tile, terra cotta, and stone laid with the brick, that could not be separated in detail, also colored bricks.) Carried forward $671,942 00 D 50 ESTIMATE FOR AN ART BUILDING. Brought forward $671,942 00 Dressed Stojie. 78,375 cubic feet, @ $3.00, 235,126 00 Wrought and Cast Iron Work, 4,200,000 lbs. wrought iron roof trusses. 1,259,250 lbs. wrought iron purlins. 3,200,000 lbs. wrought iron, main tower. 300,000 lbs. wrought iron gable ends. 720,550 lbs. wrought iron, north and south fronts and transept towers. 9,679,800 lbs. wrought iron, @ 10 c, $967,880 00 Elevators, main tower, 32,000 00 Stairways, main tower, ...„ 86,027 00 1,720,540 lbs. cast iron, @- 5 c, 86,027 00 1,010 feet lineal crest railing on roof, @, $7.00, . . 7,070 00 1,124,877 00 Carpenters'' Work a?id Lumber. 143,143 feet B. M. purlins, sheathing and flooring in tower, and flooring in galleries, white pine, @, $70,00, $10,020 00 807,848 feet B. M, temporary flooring, part hem- lock, @, $50.00, 40092 00 1,377 piles, hemlock, @ $5.00 each, 6,885 00 Carpenters' work and lumber in north and south fronts and transept towers, 216, 1 66 00 273,463 00 Galvanized Iron Work. Tower, $145,000 00 Gables, 30,000 00 264 clerestory windows, @, $60.00 each, 15^840 00 198 dormer windows, @, $50.00 each, 979^9 00 ^d main windows, @, $ 1 20.00 each, 75920 00 3.360 feet lineal main cornice, @ $5.00 each, 16,800 00 Finish in north and south fronts, and transept towers, windows, cornices, roofs, &c 5 15872 00 277,332 00 Hardware. Hardware, 15,000 oa Plumbing, Gas Fitting and Drainage. 7,150 feet lineal 4 inch pipe from roof, @, 60 c, . .- $4,290 00 660 feet lineal 3 inch pipe from corridors, @ 50 c, 330 00 1,270 feet lineal 12 inch, terra cotta, @ 80 c, 1,016 00 3,960 feet lineal 4 inch, terra cotta, @ 20 c, 792 00 Carried forward ^2,597,740 00 ESTIMATE FOR AX AKT BUILDIXH. 5 1 Brought forward $2,597,740 00 1 10 4 inch bends, terra cotta, {o42 00 179,042 00 Heating aud Cooking Apparatus. Including 8 boilers 14 feet long, 54 inch diameter, 50 horse power each, and 125,000 feet steam pipe, valves, radiators, &c., complete, 50,000 00 Incidentals, ..- 140,000 00 $3,142,200 00 QUESTIONS. 53 QUESTIONS ON THE SECOND CHAPTER. Page 9. Of what use are preliminary estimates ? What are the essen- tial elements of all estimates ? Page 13. What is a standard unit? What are ambiguities and why should they be avoided ? Page 14. How do the U. S. and British measures compare? What is the difference between the standard yards ? Give the rule for reducing one to the other. Repeat the table for U. S. linear measure ; also the miscel- laneous measures. Page 15. What is the difference between a statute and nautical mile ? What is the value of a degree of latitude at the equator and the pole ? How is the length of a degree of longitude determined for any latitude? What units are used in measuring land and for line surveys ? Page ID. Give the divisions of the metric system for linear measures and their equivalent values. Which are the road measures ? What are the units for surfaces both in the U. S. and France ? Page 17. What are their subdivisions and multiples ? Page 18. What are the units for volumes ; how divided? How do Gov- ernment engineers measure stone, sand, earth, timber, &c. ? Page 19. What is the difference between the mason's and quarryman's perch ? How are walls less than 16^^ thick to be measured ? What are the best units ? What are the units of capacity ? Give the dimensions of a bushel. What is a heaped bushel ; a struck bushel ? State the relations in dry measure ; in liquid measure. Pages 20 and 21. What are the dimensions of a gallon ? What are the divisions of the gallon used by apothecaries ? Name the French measures of capacity. What are the Spanish units? What is the unit of weight? Give the table. Pages 22 and 23, How many cubic inches are there in a pound of water? Give the table for Troy weight. Apothecaries* weight. What is the French system of weights? Page 24. How is time divided ? What is the distinction to be made in the several years in use ? What is a month ? Page 25. What is a working day ? How is the law to be construed? Page 26. How is lumber sold ? Define board measure. How are con- tents calculated ? How is round timber measured ? What are inch and piece spars ? What allowances are made for bark on round timber ? How are straight pieces^ keels, wharf and crib timber, &c., measured? 54 QUESTIONS. Page 27. Sawed timber is how sold? What is the unit in carpenters' work ? Give the rules for measuring the several parts of building as stated in the context. Page 28. Excavators' work is how measured ? What is meant by the lead? How are prices adjusted for long hauls ? Bed of foundation is how measured? dredging? rock work, clearing and grubbing? What is the unit generally used in mason's work ? How are walls measured for material and workmanship ? other forms? What are the most definite units ? Page 31. How is bricklayers' work estimated ? What is the standard? Give the average dimensions of a brick. When measured by the rod what is the thickness ? How is the number of bricks in any wall determined ; Page 32. In plastering how is flat work measured ? cornices, mouldings, &c. ? What deductions and extras are allowed ? How is coloring meas- ured ? painting? What allowances are made for piece work, balusters, &c. ? P^ge Z?)' How is glazing computed ? Roofing is how measured ? What extras are allowed ? What is the unit ? Plumbing ? Paving ? Page 34. What is specific gravity ? give the formula and general rule. How is the specific gravity of a body lighter than water found? that of a fluid? Page 42. How many spikes, ties and joints are required per mile on the C. S. R. R. ? What are the estimates for one mile of iron and of steel track, laid ? Page 44. What were the six " important considerations " to be provided for in the plans for the Art Building, U. S. Centennial Exhibition ? Pages 45 et seq. How were the original designs modified ? Describe the design for Memorial Hall with its appointments and approaches ; also the temporary portions. Pages 47 et seq. What is the standard height for freight platforms ? What provision was made for storage ? What objection existed ? How were the floors to be arranged, and why ? What were the arrangements for lighting ? Define transept, nave, finial, clerestory, purlins, sheathing, &c. What advantages were claimed by the proposed tower over a dome ? What was the estimated cost of the building ? CHA.PTERIII. Specifications. The Specification is \\\dXpart of the contract which specification de- shows specifically all those features that cannot be ^"'''^• clearly represented in the drawings; such as quality and q2Lantity of materials ; nature of zvorkmanship and manner of executing the work, with any general stipulations or instructions that may be found necessary or desirable. The greatest care should be given to its preparation as it forms the basis of the ghouid be contractor's offer and is his guide all through the carefully prepared. work. Every detail should be clearly and accurately defined and nothing should be omitted, nor left to the imagination. A memorandum tablet should be constantly used dur- ^, , ■J Memorandum ing the preparation of the drawings, and every shouu be kept. thought or suggestion carefully noted. These points will be sufficiently exemplified by an examina- tion of the accompanying forms furnished by reliable anthorities. \Frorn the U. S. Cor^s of Engineers .1 For Harbor and River Improvements. Specifications for the Improvement of the Harbor of Cedar Keys, Florida. United States Engineers' Office, No. 40 Church Street, See pages 209, 219, 251. Mobile, Alabajia, April 7, 1877. Specificatio7is. The work to be done consists in either widening the ^, ° Character, extent channel across the bar at the mouth of the Harbor of Cedar and locality of the Keys, Florida, about 5 miles south of Cedar Ke} s ; or widening and deepening the channel from the bar to Cedar Keys. The uniform depth of water to be attained through this channel is 12 feet 56 SPECIFICATIONS. at mean low water, and the work will be continued until the appropriation^ Ten Thousand (10,000) Dollars, is exhausted. The ordinary rise of the tide is about 2J feet. Tides. The material to be excavated is sand and mud, intermixed ^, . , , , . Character of mate- with shell, (easily removed by an ordmary dredgmg ma- rial and distance ot chine,) and will have to be deposited in not less than 6 feet '^""^p^^s S''°"^d- depth of water, at an average distance not exceeding 3 miles. The amount of material excavated shall be determined by Measurement. measurement in the scows or barges in which the material is deposited, whose capacity shall be ascertained by the engineer in charge, or his agents, before the work commences. Inspectors of Dredges will be appointed by the Engineer in charge, and acting under his instructions, shall determine when the scows or barges contain " full loads." The decision of said Inspectors as to the amount of material excavated and removed, as well as to its location and deposit shall be final, and without appeal on the part of the contractors. The precise location of work to be done shall be fixed by Method of working. the Engineer in charge, or his assistants, plainly marked by stakes or buoys furnished by the contractors, who will also provide a suitable boat and men to set them, and necessary help for sounding, at their own expense, under the direction of the United States Agent in charge. Contractors will be held responsible for any Government property de- stroyed by the negligence or carelessness of their employees or agents. All excavations below the required depth, or beyond the lines of the channel shall be deducted from the amount returned by the Inspectors ; such excess to be determined by examinations made by the Engineer or agent in charge at suitable intervals. In the event of a deficiency in depth " being found and reported to the contractor, payments shall be suspended until the excavation is carried to the required depth by them. A. N. DAMRELL, Capt : Engrs : U. S. A' The above specifications are accompanied by the advertisement (see page 209) and "instructions to bidders" (page2i9.) They do not exhibit the amount of material to be removed, but this will be found in the advertisement to be 20,000 cubic yards, so that it must form a necessary part of the papers composing the con- tract. In the last three paragraphs will be found mentioned some of the precautions necessary to be taken that the work may be effectively done and all fraud prevented. SPECIFICATIONS. cy For a Stcme Brcakivater. Sec pages ao9, 219, 251. SPECIFICATIONS For Rip Rap Granite for the Breakwater at Block Island, R. I. Rip-rap granite is required to complete the main break- Material, water, and build a detached piece about 300 feet long to the northward. It is now carried out to fourteen (14) feet of water at mean low water. Amount to be expended for granite, about $45,000. Appropriation. The work will be built with a width on top of twenty-five Dimensions. (25) feet, and side slopes of about forty-five (45) degrees. It is to be carried up to about six (6) feet above mean high water. The stone may be thrown in from the deck of a vessel with an ordinary spar derrick. No stone shall be put in more than fifty feet in advance of the finished portion, and all must be completed to the required height before the work will be accepted. The granite must be of the best quality as to durability, Nature of Material. in blocks averaging not less than one and a half (i ^^2) tons each. No block of less than one-half (J^) of a ton will be received. The blocks must be as nearly cubical as practicable, the smalllest dimension must in no case be less than one-third (^) of the largest. The stone found on Block Island will not answer for this part of the work. The breakwater is now so far completed as to give shelter in all storms except those from the northeast, to vessels drawing twelve (12) feet. The inner harbor gives shelter from storms in any direction, and has a depth of seven (7) at mean low water. Information. The mean rise of the tide is three and one fourth (3X) f^^^* The proper season for doing this work advantageously is between the ist of April and the ist of October, the season of long days and pleasant weather. The frequent calms at this period prevent sailing vessels from improving it because of their inability to move. For this reason parties bidding must be prepared to use a steam tug for towing their vessels to and from the work, and this will be required in the contract. The time of beginning this work is on or before May ist, The time. 1877, and it must be completed on or before November 30th, 1877. The monthly rate of progress must from the beginning The monthly rate at least, equal the average rate for the whole period in which °^ progress. it is proposed to do the work. The price asked for doing this work must be stated by the The price. ton of 2,240 pounds of stone placed in the work. The vessels to be used by the coniractor will be loaded by Measurement, weighing stone into them at the quarry and putting draught marks on them for every five (5) tons, from the smallest to the largest load that they will carry. These draught marks will be taken as indicating the load of the vessel, if she is in the same condition as to water in the hold, tackle, &c., as when gauged. The gauging of the vessel will be done by the contractor, 58 SPECIFICATIONS. under the direction of an inspector appointed by the Engineer in charge, before any stone is dehvered. The scales for weighing must be furnished by the contractor. Any failure to commence work on the day specified, or to Failure to commence prosecute it thereafter at the rate and in the manner required, will be con- sidered to allow the United States to annul any contract made, and declare a forfeiture of all reserved percentage or other dues, or to allow the United States, at the option of the Engineer in charge, to carry on the work at the expense of the other party to the contract, and to render him and his sure- ties liable for any increase of cost over that proposed and agreed upon. No transfer of a contract, or of any interest in it made in No transfer- accordance with bids received under these specifications will be allowed. No member of Congress, officer or agent of the Govern- j^„ member of Con- ment, nor any person employed in the public service, will s^^^^ be permitted to have any share in any contract made to do this work. All work done will be subjected to a rigid inspection by Inspector an Inspector appointed by the Government, and all that does not conform to these specifications will be rejected. Payments will be made at the end of each month, as the Payments. work is accepted, reserving twenty per centum till the whole is completed. Proposals and guaranty must be made in duplicate, and Proposals and none will be considered unless upon blanks furnished from guaranty. this office attached to this advertisement and specifications. Further information maybe had by applying in person Further information. or by letter to this office, where maps of locality may be seen ; but bidders are expected to visit the locality and determine everything themselves, and mu3t include the effect of all contingencies in the proposed price. The right to reject any and all bids reserved. Right to reject, G. K. WARREN, Maj. EjtgWs. and Bvt. Maj. Gen. U, S, A Engineer Office, U. S. Army, Newport, R. L, February 22d, 1877. For Removing Rock. Specification For Removing the Obstructions in East River and Hell Gate, New York. Army Building, Houston and Green Sts., See pages 210, 219, 251. New York, October 5, 1876. The dredging consists of the removal of about 24,000 tons Amount. of rock from Hallett's Point Reef. Dredging must commence at the outside edge of the reef, Manner of working and 26 feet mean low water. The excavation must be carried regularly for- ward in such direction as the Engineer in charge shall from time to time SPECIFICATIONS. 59 prescribe, so that that depth sliall be preserved over all the ground dredged. All stDnes weighing more than Lea tons will be broken at the expense of the Government. The dredging will be bid for by the ton measured in the Measured. scows ; capacity of each scow to be determined by the Engineer in charge. The rock may be either deposited above high water Deposited, mark, or at such places upon the river bed as may be selected by the Engi- neer in charge. In case of any doubt as to the meaning of the specifica- Arbiter. tions, the decision of the Engineer in charge shall be considered the correct one, and shall be final. No proposals will be considered except those coming from Conditions. parties proposing to use dredges capable of resisting collisions. Payments will be made monthly on certificate of U. S. Payments. Inspector, reserving ten per centum until completion of work. The work must be completed by June 30th, 1877. Time of completion. JOHN NEWTON, Lieut, Col. Engineers, Bvt. Maj. Gen' I. For a Breakwater of Crib- Work. Specifications For the Extension of Cleveland Breakwater. Engineers' Office U. S. A. 120 Pearl Street, See pages 210, 219, 251. Buffalo, N. Y., March 26, 1S77. The cribs, four in number, will be (50) fifty feet in length and (26) twen- ty-six feet wide, with a superstructure of (7) feet. They will rest upon a foundation of rubble stones, in fragments varying from (50) fifty to (150) one hundred and fifty pounds each in weight, forming a layer of (5) five feet in thickness and (52) fifty-two feet in width at the top of the bed of the lake, which is about (18) eighteen feet in depth along the line. The rubble foundation is the only portion of the work to be put in place during the year 1877, — the cribs may be framed and put together, but will not be sunk and filled with stone until the spring of 1878, so as to allow time for the possible settlement of the foundation, upon the amount of which the number of courses of crib-work will depend. Immediately after the cribs are sunk, they will be protected on each side by a rip-rap of heavy stones, weighing each not less than one ton, which will be thrown in so as to accord as nearly as practicable with the official drawings, and as directed by the Engineer officer in charge, or his agent. 6o SPECIFICATIONS. No superstructure will be put on until all the cribs are in place, nor is it desired that the work should be fully completed before the date limiting the contract, (September 30th, 1878.) The unfinished superstructure of the three cribs sunk in 1876, is also to be finished. This may be done during 1877. Work must be commenced within thirty days after notification of accept- ance of bid, and the whole completed on September 30th, 1878. Timber and lumber to (5) five feet or more below standard low water, must be of good white or hard pine or white oak, distributed as may be directed by the authorized agent of the U. S. Below the level of (5) five feet below standard low water it may be of white hemlock. All, both above and below water, must be of the best quality of its kind, free from splits, shakes, decay, rotten knots, and all other defects tending to impair durability or strength, and must be truly and squarely sawed to full dimensions. Timber may be counterhewed if preferred, but truly and squarely, and to full dimensions. Iron — Head, nut, screw and washer bolts to be round, of lengths as speci- fied in bill of material, one and one-fourth (iX) inches diameter; each bolt to be made with one head, one nut and screw, and to have two washers. Heads and nuts to be two and one-quarter {2}^) inches square, and one and one-eighth {i}i) inches deep. Washers to be four inches (4) square, three- sixteenths (3-16) of an inch thick, and cut to fit the bolt. Threads to be cut for a length of three (3) inches, and seven threads to the inch ; all the parts to be so made as to assemble truly and accur ately, to be interchange- able and to have full bearings. Drift bolts to be one (i) inch square and cut to assorted lengths, as speci- fied in bills of material. Spikes to be ordinary ship spikes of assorted lengths, as specified in bills of material. All iron material must be of the best quality of wrought iron and of exact dimensions specified, and any bolts or spikes failing in driving from any cause, must be replaced by the contractor for iron. The contractor for construction of the breakwater will be held responsible for all material until it is used in the work. All work must be done in a workmanlike manner, strictly in conformity with the plans and specifications, or such modifications of the same as may be made by the Engineer officer in charge, or through his instructions to his Assistant or Inspector. Cribs to be framed and built in accordance with plans and specifications, and to the entire satisfaction of the Engineer officer in charge, to be placed and fastened in position as required by him, then to be filled with stone, leveled and covered with superstructure. Superstructure must be well and squarely built and securely bolted, and before being accepted must be filled with stone flush to the decking, and planked over. SPFXIFICATIONS. 6 1 Framing must be done accurately, and care taken in handling framed tim- ber not to chip off the edges or split the dovetails. In framing timber, no stick must be so cut as to fall easily into its place, but on the contrary, each stick will be required to be mauled into place, and subject to the foregoing paragraphs. To prevent splitting while bolting, timber, plank and joists must be bored to receive the bolts. Boring for bolting will in no case be allowed of the same diameter as bolts, but always slightly less. Payment will be made monthly on Inspector's returns, retaining ten (lo) per centum until completion of the contract. The iron material must all be delivered before the first ( i ) of August, 1877, and will be paid for as soon thereafter as practicable. The rubble stone of the foundation will be measured in the scows, if thus delivered. If in vessels, the weight and cubic contents will be determined in a manner satisfactory to the Engineer officer in charge. These specifications will form a part of the contracts. Detailed bills of material will be furnished the contractor. C. E. BLUNT, Lieut. Col. of Engineers. For Iron Landing Pier. Specifications For Iron for Landing Pier near Lewes, Delaware. U. S. Engineers' Office, No. 1328 Chestnut St., See pages 210, 219, 251. Philax)ELPHia, Pa., March 31, IS77. The pile shafts will be of hammered iron, swedged smooth Shafts, and true to dimensions. The heads of the piles must be faced on the top, and Heads, turned on the sides, to fit the caps, as shown on the drawings. The necks must be turned on the pile shafts, and the Necks. collars or clamps turned inside, to fit each other, as shown on the drawings. The foot of the pile shafts to be smooth forged and faced Foot. on the bottom, to accurately fit the socket of the screw, which will be ca^ as smooth as possible on the sides, and faced on the bottom to receive the foot. The braces will be of rolled iron ; the eyes of the tension Braces. braces will be formed by a turn and weld with a long scarf. There will be no welding to form the length of the braces. Weids. Screw-ends to be ''upset," or fulled on the bars to drawing Screw-ends dimensions. The threads to be full cut from solid metal. Franklin Threads. Institute standard. 62 SPECIFICATIONS. Screws of the turn-buckles must be cut from solid metal, Screws, one end with a right, and the other with a left hand thread. Bolts must be forged to fit body hound ; diameter to be Bolts, uniform the entire length; no enlar"gement under the head. Bolt-holes in braces, lugs and clamps, to be drilled to fit Bolt-holes. body-bound bolts. Forgings and rolled iron must be smooth, and without flaws. Forgings. Material to be fagoted scrap iron. Material. Wrought iron must bear an ultimate tensile strain of Strength. 60,000 pounds to the square inch of cross-section, and a strain of 24,000 pounds to the square inch without taking a permanent set. Set The castings must be of tough gray iron, cast in dry sand. Castings. sound, true and smooth. Cast iron must bear an ultimate tensile strain of 25,000 Strength, pounds, and a transverse strain (to the foot length) of 600 pounds to the square inch. Machine and hand work, and finishing to be without fault. Fnishing and fitting All parts belonging on or to others to be put together in shop to insure fits. The U. S. Inspector to select such pieces as he wishes for Testing. testing. Pieces for testing will be cut off and turned to the required Pieces, dimensions, and tested either at the place of manufacture or elsewhere. Castings for testing will be run as required by the Inspector. Castings. All expense of testing to be borne by the contractors. Expense. Full extra thickness of metal must be provided for all Full metal. turning, boring, facing, and finishing required. All pieces must be marked with chisel or punch, or with Marking. paint, as may be required. Access to the work, and works, must be free at all times inspector. to the U. S. Inspector. Collars, clamps, turn-buckles, bolts and nuts, of propor- Dimensions, tionate dimensions. Caps and screws to correspond. Rolled Iron — • Upper cross braces, 24 — \\^ &fV^y^2.%^^ diam., 5280 1 Lower *' 24 — 20^ 7^^ Vs.^V^ " 8400 Longitudinal ** 30 — 26^ ioX^''X3^^ '* 19800 Bands for screws, 15 — 240 Hammered Iron — Pile shafts, 15 — 15 — 55^X8*^^ diam 156000 Screw-buckles, 54 2652 Yokes for cross braces, 24 1200 Bolts and Nuts, 174 4002 Collars and Clamps, 30 6720 Cast Iron — Screws, 15 6300 Caps, 15 9756 Material. bs .@ cts. per lb. Total bid for material. SrEClFl CATIONS. C^ The contract price will be determined on this total, but the right to vary amounts and dimensions is retained by the United States. The price's /^er pound will not be changed. The above prices are for iron delivered either at the U. S. Place of delivery. Landing Pier, or at the Railroad Pier, near Lewes. The material for each bay complete (5 piles with braces, Delivery. screws, »X:c. ) shall be delivered at the same time in order that there may be no interruption in the work of construction ; and in case such interruption should occur through non-compliance with this specification, the contractor shall be liable for all loss to the Government accruing therefrom. A bay complete shall be delivered not later than June 5th, Deliver}'. and the remaining two not later than August 5th, pro.x. All material when ready for delivery shall, previous to inspection at the shipment, be inspected at the works by the U. S. Inspector, "^^orks. and any material rejected by him shall not again be offered for inspection. Upon delivery at Lewes all material will be weighed and inspection at the again inspected by the Engineer Officer in immediate charge P"^""- of the work, and if any be then rejected it shall be replaced by the contractor without expense to the United States. All surfaces of iron work must, subsequent to the inspec- Paint. tion at the works, receive two coats of Spanish brown, or brown zinc, ground in oil, as may be required, thoroughly put on, at the luorkskops, and left to dry for some days before shipment. All bright surfaces to be similarly protected with white Paint. lead and tallow, or with white lead and oil. Sigjiature, « For removing Snags^ &c. Specification For the Removal of Snags, (S:c., from the Minnesota River. See pages 211, 219, 222, 251. U- S. Engineers' Office, St. Paul, Minn., June 2, 1877. The work will consist of removing snags and boulders Nature of work. from the channel, and cutting down and removing overhanging trees from the banks of the Minnesota River, between St. Peter and Mendota, at "such points as may be designated by the Engineer Officer or Inspector in charge. Trees, snags and boulders must be totally destroyed or placed beyond the reach of high water, at places to be designated by the En- Place of deposit. gineer Officer or Inspector in charge of the work. The prices for removing snags, boulders and overhanging Price. trees must include all the labor, machinery, and other appliances necessary to do the work. 64 SPECIFICATIONS. The contractor will not be permitted to take any advan- Stipulations, tage of an error or omission in the foregoing specifications, as full instruc- tions will always be given should such error or omission be discovered. The boulders removed will be measured in cubic yards, Measurements after the same are removed and piled. The trees will be cut off at a height not to exceed one (i) foot from the ground, and the measurement will be made at the cutting. Snags will be measured two (2) feet from the highest root. Payments will be made at the end of each month, to in- Payments, elude the work done on the last Saturday of the same — ten per cent, being retained from each payment until the completion of the work. The work will commence as soon as the stage of water Work to commence will permit, after the signing of the contract, and must be prosecuted with due diligence until the funds available ($10,000) are exhausted. The time not to extend beyond the first day of April, 1878. Approximate Quantities to be Removed. 50 cubic yards Boulders. 26 Trees, 36 in. and upwards in diameter. 75 " 30 in. to 36 in. in diameter. 224 *^ 20 in. to 30 in. " 474 " 6 in. to 20 in. " 201 " 4 in. to 6 in. " 47 Snags, 36 in. and upwards in diameter. 102 " 30 in. to '^6 in. in diameter. 212 " 20 in. to 30 in. ^* 496 " 6 in. to 20 in. ** 143 " 4 in. to 6 in. F. U. FARQUHAR, Maj. of Engineers, • For Canal Locks, Specifications For the Construction of Five Canal Locks on the Muscle Shoals Canal, Tennessee River. U. S. Engineers' Office, See pages 211, 219, 224, 251. Chattanooga, Tenn., April 18, 1877. Specifications. . To Bidders. The locks, for the building of which bids are invited, are numbers 6, 7, 8, 9 and 10 ; but awards will only be made for such of these as the prices bid and amount of funds available may warrant. The lock chambers are to be about 300 feet Ion g, and 60 feet wide, with side walls from 13 to 20 feet high. SPECIFICATIONS. 6^ The lock pit excavations will be about 370 feet long by 80 feet wide, and will be carried down to, or into solid rock when required. Concrete floors will be used where the rock is found so cracked and unreliable as to render them necessary. Bids luill be received in the two following forms, a?id not otJicnuisc : («.) For a single lock, giving its nnviber. JEach bidder being, of course, allowed to bid on as many locks as he chooses ; submitting a complete, dis- tinct, i Ionized proposal for each. {b.) For the whole work to be let under these specifications, provided at least three locks are awarded to the bidder. These bids are also to be item- ized as indicated on the annexed '' Form of Proposals.'' The contract will then be awarded on the separate bids or on an aggregate bid, whichever will secure the completion of the work at the lowest cost to the United States. If, under these provisions, it is decided not to ac\'ard contracts for all the locks mentioned, the Government will designate which locks are to be omitted. It is assumed that every bid is made in the interest of the bidder, and that he expects to- make a fair profit on the work. If, therefore, items of any bid are manifestly below their actual and necessary cost, it will be attributed either to the ignorance of the bidder or a design to gain some unfair advan- tage, and such bids will not be accepted. Each bidder should state whether he has ever been engaged in building canal locks, or similar works, or has ever been interested in any contract with the United States, and if he has been so interested, he will give the date and character of the cor^tract. Special atte7ition is directed to the Instrtuiions for bidders, attached here- to. Bids not made in conformity with these iiistructions will not be enter- iai^ied. These specifications v/ill be attached to, and form part of, the contract. Bidders are advised to read them carefully and to visit the work at Muscle shoals. An Assistant Engineer, stationed near Shoal Creek, about 8 miles from Florence, Alabama, will be prepared to furnish all necessary informa- tion as to the location and surroundings of the work. General Conditions. The entire v/ork must be executed in accordance with working drawings, furnished from time to time by the Engineer; and all orders and instruc- tions given by the Engineer, relative to the prosecution of the work or de- tails of construction, shall be promptly and fully complied with by the con- tractor. The Government reserves the right to make such alterations in the plans, location and details of the work as shall seem advantageous ; and it is to be aistinctly understood that any increase or reduction of quantities, resulting from such alterations, is not to be assumed as the basis of a claim against the Government for damages or for the loss of prospective profits. 66 SPECIFICATIONS. The contractor will not be allowed to take advantage of any defect or omission, either in the drawings, specifications, or instructions given by the Engineer. In such cases, or in any doubtful case, it is his business to bring the matter to the attention of the Engineer, who will make all necessary^ corrections or explanations. All jnaterials and workmanship must be such as are approved by the Engineer in charge, and must be carefully examined either by himself or by a duly authorized Inspector acting for him. Rejected materials must be removed at once from the vicinity of the work ; and no payment will be made for materials so rejected or disapproved. Stone and other materials will be paid for only when permanently placed in their final position in the work, and are then approved and accepted by the Engineer. The contractor must protect his work until it is completed and duly ac- cepted, and he must repair any damage done to it by freshets, rains or other accidents, in such manner as the Engineer may direct, at his own cost. Before receiving his final payment he must, unless otherwise directed, at his own cost, remove all unused materials, dams, and other temporary works, used by him, and leave the work in a neat and orderly condition. No convict labor will be allowed on the work, nor will the contractors be allowed to interfere with each other, nor to obstruct the roads required for the use of other contractors or of the Engineers ; nor to retain on the work men who are disorderly, or who attempt deception or evasion in carrying out these specifications. Work must be begun within thirty (30) days after the executio7i of each contract J and must be completed by June 30, 1878. A fair monthly progress must be made. Excavation. The prices bid for excavation will be estimated per cubic yard, measured in position, and must include the clearing and grubbing of the site, building dams, pumping and draining, and the excavation, removal, and deposit where directed by the Engineer, of all the materials of whatever name or nature, that may be encountered in preparing for the foundations of the locks. The excavated materials will be deposited where the Engineer considers they will be most advantageous to the whole work ; and, if he so directs^ they must be left in regular and evenly distributed masses. When materials are required by the Engineer to be hauled more than two hundred feet from the lock pit, an allowance of one (i) cent per cubic yard, for each additional hundred feet of haul will be made, but no allowance of this kind will be made where the materials are deposited within two hundred (200) feet of the lock. No allowance will be made for excavation below the grade nor outside the limits given by the Engineer. SPECIFICATIONS. 6/ All the excavation will be classified as follows, the Engineer being the judge as to which class any material encountered belongs : {a.) Earth Excavatio)i. This will include clay, sand, gravel and all other earthy materials, (except hard pan, as specified in the following para- graph,) and loose stones, not larger than one cubic foot each. [b.) Hard Pan a/td Loose Rock. This will include tough, indurated clay, hard, tough, cemented gravel ; and other earthy materials which, in the opinion of the Engineer, require blasting, or at least three times the usual amount of picking ; boulders containing from one cubic foot to one cubic yard, each ; and all slate, shale, stratified limestone and sandstone that, in the opinion of the Engineer, can be removed by picking and without neces- sarily using explosives. As it is not known what quantity, if any, of these materials will be encountered, ''Hard pan and Loose rock" will not be bid for as a separate item, but one-half of the quantity excavated will be paid for as ''solid rock,'' and one-half as "earth excavation.'* {b.) Solid Rock. This must be such as to require blasting, or some more expensive method, to reduce it to masses of less than one cubic yard each, that can be handled with a derrick. When the Engineer shall require any part of the rock in place to be pointed or axed to true surfaces for face work, an allowance will be made of 20 cents per square foot of surface dressed, in addition to the contract price, per cubic yard, for the quantity of rock actually removed. This provision relates only to cases where, as in lock 9, it is proposed to use the rock in position for a part of the side wall without masonry facing. In all cases the surface of the rock must be pre- pared at the cost of the contractor to receive the masonry, being stepped, if required, for that purpose. {d.) Old Maso7iry. This will include the removal of such of the old locks as are hereafter designated. In this work blasting will not be allowed, and will not probably be desirable to the contractor. The stones must be handled carefully so as not to break or injure them, and such of them as are approved by the Engineer will be used in the new locks, an allowance being made therefor by the contractor, which must be specified in the bids. These stones must be re-cut if used as "cut-stone." Bidders for Lock No. 6 will bid on the removal of old Jock No. 10. Bidders for Lock No. 7 will bid on the removal of old locks Nos. 1 1 and 12. Bidders for Lock No. 8 will bid on the removal of old locks Nos. 14 and 15. Bidders for Lock No. 10 will bid on the removal of old locks Nos. 16 and 17. Certain parts of old locks Nos. 14 and 17, to be designated by the Engi- neer, may be retained for future use, and such parts must not be disturbed in removing the balance of the stones. Any stone designated to be left and which is disturbed by the contractor, must be re-set at his own cost. Masonry. The masonry will be of four kinds, viz : Cut Stone, Rock Face, Rubble, and Concrete, The bids must state the price per cubic yard laid, for each clasb, and must 68 SPECIFICATIONS. include all labor, tools, and materials required to quarry, haul and cut, or otherwise prepare the stones and put them in their final position, and the building in of all iron and wood work that may be furnished by the United States for that purpose. The lock pits must be freed from water by the contractor before masonry of any kind is begun, and any masonry laid in water or submerged before it has had time to thoroughly set, shall be taken down and replaced by the contractor at his own cost. No cuithig, drilling or hammering of stones will be allowed after they have been brought upo7i th4 wall j and they must be lifted by derricks or cranes and lowered into their places without shock to the masonry. Any stone whose bond or set is disturbed by a neglect of these precautions, must be taken up and re-set at the cost of the contractor. Not more than three courses of either wall of a lock must be unfinished at a time ; and the backing must go up with the facing, but never in ad- vance of it. Every surface which is to come in contact with mortar must be freed from dust and dirt, and thoroughly sprinkled just before the mortar is applied. Every stone, both of the facing and of the backing, must be set or laid in 2, full bed of mortar, and great care must be taken that the vertical joints are thoroughly filled with the same, well forced in with the trowel. All sto7ie used must be quarried without blasting, and must be sound, strong and durable, free from seams, scales or earthy matter, and of a kind not easily injured by frost or water. Stone quarried after the ist of Octo- ber will not be placed in the wall before the ist of April following, unless by special consent of the Engineer. All the IK 07'tar ustdi in these locks will, unless otherwise specially directed by the Engineer, consist of two parts, by measure, of sand and one part of hydraulic cement, with only enough water to form a paste, stiff enough to handle with a trowel. Mortar must be used as soon as it is thoroughly mixed, and if allowed to set before using, it must be thrown away. No grouting will be used on the work except by special direction. No work involving the use of mortar will be done while the temperature is below 35^ Fahrenheit. The cement must be freshly burned and ground, and equal in all respects to the best Louisville brands. It should be finely ground, and free from moisture or inert matter, and must set strongly.,and firmly. Every barrel will be tested, and such as are rejected must be removed at once from the vicinity of the work. In order to avoid deterioration, contractors are advised to provide cement sheds, and use every precaution to keep the cement thoroughly dry. No common or fat lime, or cement that fails to pass the tests, is to be used in any part of the work. The sand must be clean, sharp and free from vegetable matter, and must be screened and washed if required by the Engineer. SPECIFICATIONS. 69 Cut stotiCj where used as facings must be laid in regular courses, headers and stretchers; no course to have a less rise than (iS) inches. Each stone to have at least one-fourth (X) more bed than rise, and a length not less than twice, nor more than four times the rise or thickness of the course. The bo7id must be at least one foot in all cases. The holloiu quoins, if required, (it is probable that the gates used will be such as to dispense with at least one pair of hollow c^uoins,) must be cut in a single stone in each course, at least (.^.) feet wide and seven (7) feet long, laid alternately as headers and stretchers. Mitre sills will not be built under these specifications. Th.z copifig stones must be at least three (3) feet wide and five (5) feet long, or must have a bed of at least fifteen (15) square feet. The thickness of the coping must be at least eighteen (iS) inches, and each stone must be dressed true on all sides but the back, wdiich will simply have a straight line "pitched" along its upper edge. Tho. faces of all cut stone and the top of the coping will be dressed with care, either thoroughly axed or bush-hammered to true, even surfaces, with clean angles and perfect edges, and without marking or spalling. The curved surfaces of the hollow quoins must be made particularly smooth and true. The beds and vertical joints must be pointed down to true planes without projections or cavities ; the former eighteen ( 1 8) inches and the latter ten ten (10) inches back from the face, to admit of being set with one-fourth {}:^) inch joints. The remaining parts of these surfaces to be broken-or pointed off, to admit of joints not more than one (i) inch thick. Beds are to be cut parallel wdth the quarry bed, and vertical joints to be perpendicular to the beds and to the face of the wall. The quantity of cut stone masonry will be computed by allowing two feet thickness measured from the face of the wall ; but 710 constructive measure- ment will be made at corners or openings, or in other words, no part of the wall will be measured twice. The coping and hollow quoins w'ill be mea- sured as cut stone throughout. Rock face masonry will be the same, in all respects, as the cut stone, ex- cepting that the face will have a straight line pitched around it, instead of being cut to a plane surface. No part of the surface will, however, be allowed to project more than one inch from the pitch line, unless authorized by the Engineer, for special localities. This class of masonry will be mea- sured in the same way as the cut stone. Rubble will be built of stone at least nine (9) inches thick, and each stone must have at least one-fourth more bed than rise, and a length not less than twice nor more than four times the rise. The coursing may be irregular, excepting that when used as backing it must course with the facing, and where it is used as facing it must bond with adjoining face work. To accom- plish this, stones of a smaller size than those just prescribed maybe intro- duced to a limited extent, when authorized by the Engineer. 70 SPECIFICATIONS. The stones must be broken or pointed down to regular, even surfaces, square with each other, to lay with joints not more than one inch thick. The stones must bond together at least nine (9) inches, and headers at least four (4) feet long must be inserted at intervals of ten or twelve feet, each header falling over the interval between two headers in the course next below. The rubble will be measured in the same way as the cut stone, excepting that the actual thickness of the rubble will be taken, including those por- tions of face stones not measured as cut stone or rock face ; but in no case shall the thickness of wall or any other dimensions of the same as measured be greater than the dimensions shown by the drawings, even if the contrac- tor has exceeded those dimensions. Concrete. When concrete is ordered for any part of the work, it must be made of three parts, by measure, of coarse gravel, or broken stone, small enough to pass through a ring 2^ inches in diameter, and one part of the mortar already described. The stone or gravel must be hard, strong, and free from dust, and must be wet or washed before mixing with the mortar, if required by the Engi- neer. The ingredients must be thoroughly mixed by hoe and shovel, or by a concrete mill, so that every piece of stone or gravel shall be entirely coated with the mortar. Concrete must be laid as soon as it is thoroughly mixed ; the mass being deposited in successive layers not more than six inches thick, and each layer being thoroughly rammed before the next one is laid. The concrete must be mixed so dry that no signs of water will appear until the ramming is nearly completed. Concrete will be substituted for rubble backing, filling, &c., to the extent required by the Engineer, and the quantity of concrete measured, will be the actual number of cubic yards, so required and laid. Approximate Quantities. In Cubic Yards, Measured iti Position. EXCAVATION. MASONRY. ALLOWANCES. Number of Lock. Earth Ex- cavation. 1 0000 5000 3500 5000 8500 Solid rock Evcava'n 500 3500 1200 4000 4100 Old Locks. IIOO 2200 2000 2000 Cut Stone. 530 700 800 350 700 Rock Face. Rub- ble. 1300 2500 3000 1400 2500 Con- crete. 200 350 400 250 350 stone from Old Locks, used as Cut Stone. WO 3P4 100 200 200 Stone from Old Locks, used as Rubble. No. 6. No. 7. No. 8. No. 9. No. 10. 420 450 300 50 100 100 100 300 200 400 SPECIFICATION'S. /I It should be distinctly understood that these quantities are only approxi- mations, some of them being of such a nature as to be impossible to esti- mate with any degree of accuracy until the work is in progress. Slight changes in the grades, or in the location of the line, which may be made in consequence of facts hereafter developed, may cause great variations in the quantities herein given. W. R. KING, Captahi of Engineers, For a Dain of Masonry. Specifications For Dam No. 4, near Cabin Creek, on the Kanawha River. U. S Engineers' Office, Sec pages2ii, 219, 225, 251. Baltimore, j\Id., March i, 1877. The works consist of a Dam, Abutment, Pier, and the flooi of a Naviga- tion Pass, adjoining Lock No. 4 of the Kanawha River Improvement, near Cabin Creek, West Virginia ; all of which are shown by the drawings. The dam or weir will be of masonry, about 200 feet long, 14 feet high from the rock, (which is about 11 feet below extreme low water surface of the river,) and 16 feet thick at base ; with a batter on the face and rear. It will be covered with heavy stone, to which the longitudinal timbers shown on the plans will be bolted, and the space between the timbers filled with squared, dressed rubble, all to be well dowelled. The abutment will be of masonry about 16 feet higher than the dam, about 35 feet long, with return walls, securely connected with the bank. Walls will be about four and a half (4>^) feet thick on top, with a batter on the face. They will be coped with heavy stone, well dowelled. The abutment will be filled with solid material, (earth, gravel, &c. ), and protected over its entire upper sur- face with a heavy paving laid in mortar on a course of concrete. The pier, which will separate the dam from the navigation pass, is about 50 feet long, 10 feet thick, and rises 9 feet higher than the dam. The floor ot the navigation pass will be a platform 250 feet long, about 50 feet wide, and 5 to 6 feet thick. Its upper surface will be about 5 feet under water at low stages. It will be composed of a grillage or crib-work of timber filled with concrete, covered with a stone pavement in mortar. The main sill and such other parts as the Engineer may direct, shall be of cut stone. This portion of the work is represented as to its general charac- ter only, subject to variation in arrangement of the details of its surface. The lock which these works adjoin is already under contract, and in pro- cess of construction. The works will conform to the drawings exhibited, and to such others as may be furnished from time to time. J 2 SPECIFICATIONS. The contract will cover the necessary dredging and excavation and other preparation of the site, all coffer-dams, pumping and bailing, embankment, puddling, masonry and timber work, the grading and protection of the bank ; and the entire construction and completion of the work. Grubbing and clearing will cover the removal from the site of all trees, bushes, stumps and roots, as well as snags, stumps and roots under water. Excavations will include all materials removed from foundations, for chan- nels, for coffer-dams, in grading the river bank, and to obtain material for embankments. They shall conform to such lines and levels as may be given by the Engineer, and be deposited at such places as he may direct, being used as far as possible to make the necessary embankments. The contract price will cover the cost of transportation and placing in bank. Rock in place or other material so hard that it can best be excavated by drilling and blasting, and boulders of more than 9 cubic feet shall be classi- fied as " Rock excavation ;" all other material as '^ Earth excavation." Embankments include the filling behind abutments and walls, the grav- elling of the dam, and such as may be required to fill out and grade the river bank. They will be composed of material from the excavations, or borrowed at such point as the Engineer may direct. Whenever practicable, they will be measured and paid for as excavation only ; where this is not practicable, the materials will be measured in embankment and paid for at the price of excavation, without allowance for increase or shrinkage. When placed above water, they shall be carted on, and spread in layers of ten inches ; or if carting is impracticable, they must be spread in 6 inch courses and well compacted by ramming. Embankments in contact with masonry, shall be puddled for such thickness as the Engineer may direct. Puddling will be composed of clay, or clay and gravel mixed in nearly equal proportions, it shall be spread in eight inch layers, thoroughly wet, and cut and worked into a homogeneous water-tight mass. The price to^ be in addition to the excavation price, and the material to be measured in the bank. Coffer-dams will be built by the contractor subject to the approval of the Engineer ; the cost of the same as well as all pumping, bailing, and repairs to be covered by the prices for masonry. They will be kept in order and kept clean by the contractor, but he may be paid for the removal of material deposited in them by floods, at his excavation price per cubic yard, unless due to delay or neglect on his part, of which the Engineer will judge. The whole space to be covered by the works will be exca- Foundations, vatcd to the solid rock, together with any pits for anchor plates which may be required, and any loose or soft rock shall be removed as the Engineer may direct. The masonry of the abutment, weir, and pier will be built directly upon the rock, which shall first be cut into good horizontal beds for the first course of face stone, so that each stone may have a full bearings These stones however may vary in height and be levelled up on top with levellers or by checking. Rubble and concrete backing shall rest on and be SPECIFICATIONS. J^ attached to the sound clean bed rock. The necessary bolts, plates, &;c., will be inserted as the work progresses. The coping, the rounded corners of the abutment and Masonry. pier, the borders of openings in them, and the sills of the navigation pass, will be of cut stones. The vertical face on the abutment, the coping and paving of the dam, and the lateral faces of the pier will be of dressed rub- ble. The face and wings of the abutment, the face of the dam below the coping, and the ends of the pier will be of rock faced masonry; and the backing of all walls will be of rough rubble or concrete, as the Engineer may direct. All stone shall be perfectly sound, hard, strong, not affected by frost, free from seams or quarry scale, and to ring under the hammer. Stone for cut work to be such as can be truly wrought to such lines and surfaces as may be required, whether curved or plane, and all stone for the same class of work to be as nearly as practicable of uniform color and appearance. Cut stone shall be in courses not less than i6 inches high, each stone to have at least one-fourth more bed than height. The general dimensions and arrangement of cut stone are shown by the drawings. The beds and joints will be dressed with care, true and out of wind, without slack or want on the beds; the joints to be full for 12 inches from the face, to lay with three-eighths of an inch joint. The face will be cut true and to the proper lines, with clean, sharp arrises free from spalled places, and formed by nar- row drafts on the beds and joints, as well as on the faces of the stone. The edges of cut stone which adjoin masonry of a rougher class shall have a bevel or rustic of one and a quarter inches ; the edges of all grooves and recesses to be slightly rounded. Any stone having defects concealed with cement or other material shall be rejected on that account alone. Coping will be of uniform thickness throughout each course ; not less than 18 inches thick, and shall conform to such plan as may be furnished by the Engineer. It shall be cut fine on the top and face, and pointed off to good, fair beds and joints, with clean straight arrises around the face, and upper surface of the stone, except the upper front edge, which shall be rounded to a radius of 2 inches. To be well dowelled with two cast iron dowels for each stone ; dowels ten inches long with swelled heads, run in with Portland cement. Dressed rubble to be of squared stone not less than 10 inches high, with no bed less than 18 inches, or less than the height of the stone, and the beds of two adjacent stones shall vary in breadth at least six inches. One-fifth of the face to be headers four feet long or longer. Stones intended to course together shall be of uniform height, to be so arranged where they bond with cut stone that the beds of one class shall correspond exactly with those of the other, but courses may vary by checking, or by an occasional leveler, not less than four inches high, Beds shall be dressed entirely through, and every stone shall be set on its best end ; joints to be full for six inches from the face, and all beds and joints to be normal to the face or 74 SPECIFICATIONS. at such angle as may be prescribed. Both beds and joints will be pointed down to fair, plane parallel surfaces to lay with five-eighths of an inch joints. The faces shall have no projection over three-fourths of an inch from the drafts. Rock faced masonry shall be similar to the above, but the face may be left rough, but with no projection greater than 2^ inches — each stone to have a draft around the face of one and a quarter (iX) inches or to be neatly pitched off at an angle of 45 degrees as the Engineer may direct. Rough rubble for backing shall be of large, clean, well shaped stones, "hammered to good fair beds so that they will lie solid ; all to be well bonded. Cutting or dressing a stone after it has been set is prohibited — except in special cases by consent of the Engineer. Concrete shall be composed of broken stone or gravel, which will pass through a 2>^ inch ring, free from dust and dirt, to be screened if required by the Engineer. To be thoroughly mixed, (with sixteenths of its bulk of mortar,) carefully put in place by such process as the Engineer may ap- prove, and rammed or pressed into a solid mass. Paving will be of hard well shaped stones of even thickness, sixteen inches in depth, laid in mortar. Slope walls of dry rubble masonry will be made of well shaped stone, hammered to fair beds generally 18 inches wide, laid to the proper lines and slopes, and at right angles to the ilope and to reach through the wall on a bed of gravel or spalls six inches thick, and shall be finished on top with wide stone, jointed. The face to be well wedged and pointed with pinners and spalls. Rip -rap and filling for cribs will be of sound rubble stone as specified above, such proportion as the Engineer may require, to measure one and a half cubic feet each. Such portion of the gravelling of the dam as the En- gineer may direct, shall be made of " rip-rap '' and paid for at rip-rap price. Cement will be of good and uniform quality, setting firmly and strongly, but not too quickly; subject to the approval of the Engineer, and to con- stant inspection. It must be a fine dry powder, free from cinder or other inert or injurious substance, and kept under cover in a tight shed or cement house. Sand to be clean, sharp, silicious ; to be screened and washed if required by the Engineer, Mortar to be composed generally of two parts of sand to one of cement, well and thoroughly mixed, and used before it has begun to stiffen. It must not be used on the ^'second set." For concrete in foundations not exposed to running water, the mortar may with the consent of the Engineer have two and a half parts of sand to one part of cement. All stones to be well and solidly laid to the proper lines, Laying masonry. in full beds of mortar, and settled in place with a wooden maul. The joints of face stone to be well filled with the trowel or other tool. RubbL) stone in backing will also be laid perfectly solid in full beds of mortar, the SPECIFICATIONS. / D joints to be well tilled with the snme ; all space shall be filled with mortar, into which spalls and selected pieces of stone shall be driven until the whole is full. The use of grout or lluid mortar is prohibited. Face stones may with the approval of the Engineer be backed with con- crete in layers correspondmg with the courses of stone, rammed solid. Proper machinery nuist be used in handling large stones, and every stone, the bond of which is broken, must be taken up and reset. The bond of stone will in no case be less than eight inches. Face work will be jointed and pointed as the work progresses, with the same mortar with which it has been laid, pressed in, and smoothed or burn- ished with a proper tool. Masonry will not be executed during freezing weather, except by consent of the Engineer, who will prescribe what precautions shall be taken to pre- vent injury to the work ; and all new and unfinished work shall be properly protected by the contractor at his own cost. The contractor shall build into the masonry, without extra charge, all the iron work and timber, sills, anchors, plates, See. Timber shall be white oak or white pine, or such other as Timber. may be approved by the Engineer officer in charge, sound, straight, free from shakes, cracks, loose knots or other defects impairing its strength, durability, or fitness, and subject to the approval of the Engineer, properly sawed or hewed to prescribed dimensions, the surfaces to be fair, and out of wind. Where the use of flatted timber (that which is hewed or sawed only on two opposite parallel faces,) is permitted by the Engineer, the contractor shall be paid for so much only as the log will square. The price of timber shall cover the cost of framing and placing of nails, spikes and pins. Iron work will be furnished by the United States, and built into the work by the contractor without extra charge. Earth and rock work will be measured in excav^ation, and Measurement, the price per cubic yard will cover its transportation and placing in embank- ment. Concrete and rough rubble will be paid for by the cubic yard in place. Dressed rubble and rock faced masonry will be measured and paid for by the cubic yard for an average thickness of face, to be determined by the Engineer, and to which the work in execution must conform. Cut stone masonry and coping, will be paid for by the cubic yard, meas- ured before the stones are laid. Timber and plank by the looo feet, board measure, of the dimensions prescribed and furnished. The prices for masonry shall cover all coffer-dams, pumping and bailing, machinery, Sec, as well as drilling and cutting for bolts and dowels, and generally the prices bid will coverall expenses incident to the work. All material rejected by the Engineer shall be piled in General conditions, sight near the works, and so remain until the same are completed. Within thirty days after the completion of the works, the contractor 76 SPECIFICATIONS. shall remove from the site all coffer-dams, rubbish, old and unused material, and leave the whole in perfect order and condition. The slopes of all ex- cavations and embankments shall be neatly finished and trimmed to the prescribed slopes, the top and bottom edges correctly lined off and defined. In their first execution they will be left full, so that there may be some earth to remove in the final dressing. This dressing will be covered by the contract price for excavation and embankment. From sunset to sunrise the work shall be lighted in such manner, satis- factory to the Engineer, as to prevent accident to boats navigating the river. This lighting shall be done by the contractor at his own expense, and he shall be liable for any and all damages due to neglect in this partic- ular. The work will be conducted under the direction of the local or resident Engineer, who shall have power to prescribe the order and manner of ex- ecuting the same in all its parts ; of inspecting and rejecting materials and work which do not conform to the true intent and meaning of the drawings and of these specifications ; but the decision of the United States Engineer officer in charge of the works shall alone be final and conclusive upon these points, and upon all questions arising out of these specifications, and from his decision there shall be no appeal. Within one month after the award of the contract, the contractor must elect a residence, to which all letters and notifications concerning the work may be sent. The work must be commenced within thirty days after the execution of the contract, and completed by or before the 31st day of December, I878. Payments will be made monthly, reserving 10 per cent, of Payments. all monthly estimates until the completion of the whole work ; and no pay- ment will be made for material until it is actually in place in the work and has been inspected and accepted. But if the contractor, injudicious prose- cution of his work, should prepare non-perishable material in advance of the proper time to put it in the v/ork, the Engineer in charge may, at his discretion, pay him for such material, after inspection and delivery to the United States, a proportionate part of his contract price for the finished work, to be deducted from the final estimates when paid. Extra work shall be done only upon the written order of the Engineer, when time will permit; the quantity and value to be agreed upon in advance when practicable, or if impracticable, then immediately thereafter and with- in the next 30 days succeeding. The right is reserved to make such changes in the plans and specifications of this work as the Engineer in charge may think proper, and in case such changes shall increase or diminish the expense of doing the work, it shall be his duty, with the approval of the Chief of Engineers, to add to, or de- duct from the contract prices in proportion to such inc»ease or diminution. In the event of the appropriation being exhausted before the completion of this work, or for other sufficient cause, the right is reserved to the U. S. Engineer in charge to suspend the contract without liability on the part of SPl'XIFl CATIONS. . 77 the United States, upon giving thirty days notice thereof. In which case all the work done and materials furnished will be paid for in full, together with the reserved percentage. In case this contract should fail or be annulled, all coffer-dams and cribs, with all their adjuncts, appurtenances and accessories shall thereby become the property of the United States; and any and all materials, tools, ma- chinery, boats, tramways, cars, &c., prepared for or in use in the prosecu- tion of the work, together with all leases, rights of way and quarry privi- leges, may be purchased by the United States at a valuation to be deter- mined by the Engineer. It is recommended that each person bidding sha^l visit the site, either personally or by competent agent, ascertain the character of the river as to floods, low water. Sec, inspect the style of masonry and other work exe- cuted under similar contracts upon other structures of this series, and ob- tain the information necessary to enable him to make an intelligent pro- posal. Bidders will state whether these recommendations have been com- plied with. All available information will be given at the office of the Resident En- gineer, Charleston, Kanawha County, West Virginia. WM. P. CRAIGHILL, Major of Engineers. U. S. Light-House Board. In this department of the Government service the forms are all similar and some of them necessarily very prolix. A single example will therefore be found sufficient. Specifications For the Light-House on Southwest Ledge, near New Haven, Connecticut, Long. Island Sound. Office of the Light-House Board, See pages 211, 227, 254. Washington, D. C, 1875. General Descriptio7i. The Light-house is to be built on Southwest Ledge, a rock in Long Island Sound, near New Haven, Connecticut. The shoalest point on the rock has on it wyi feet of water at low tide, and drops off in all directions into deep water quite rapidly. The uneven surface of this rock was leveled with concrete and small quarry stones, upon which were placed two annular tiers of dimension stones, 28 feet in diameter and 3 feet thick. 78 SPECIFICATIONS. On top of this foundation, which is lo feet below mean high water, was set a cast-iron tube 24 feet in diameter, resting- on the stone foundation with a wide bottom flange ; it is composed of rings 6 feet high, the lower ring, which is surrounded with rip-rap, being i }:(. inch thick, the two next are 2 inches thick, and the upper courses are each i inch thick. This foundation is surrounded by a rip-rap protection of large but irregular blocks of granite. The concrete filling of the tube extends solid up to the cellar, which is 16 feet in diameter and 7 feet high. The dwelling, which is to be entirely of iron on the outside, will contain, in the principal story, a living-room, kitchen, pantry, and a hall, from which stairs will communicate to the cellar and the upper floors. The roof will contain two stories, two bed-rooms being on the lower and the oil and watch- room on the upper one ; above this will be the lantern. The iron shell of the house will rest on a frame made of rolled-iron beams, which will also support a gallery which is surrounding the entire super- structure. Communication with the shore will be afforded the keepers by boats, which, when not in use, are hoisted on wrought-iron davits secured to the gallery. Access will be given to the light-house by two ladders from the water to the gallery, which are to be made in two hinged sections; the upper part to be strongly braced and stationary, while the lower one can be hoisted up when not in use. The gallery is to be protected by a wrought-iron railing, and two coal- slides will lead from the same to the cellar. The cellar to be lighted by two windows, in the top of the caisson. The framework, which carries the dwelling and the gallery, is to be supported on the outside by cast-iron brackets, which are strongly secured to the caissori ; the beams to be bolted to them, thus securing the superstructure to the foundation. The wooden entrance-door to be made in two folds, swinging outward, and will have a transom-light. The stairs are to be inclosed with tongued, grooved and beaded narrow boards from the first-story floor to 2 feet 8 inches above the second-story floor, where they will be cut level and capped. The pantry to be fitted up with shelves and drawers for storing provisions. In the living-room and the kitchen are to be located two stoves, for heating and cooking purposes; the smoke-pipes to be double, to prevent accidents from fire, and where they pass through the floor an additional ring to be provided, thus forming a double air-space between the smoke-pipe and the floor and ceiling. Drums to be provided in each of the rooms of the second- story for heatmg those apartments. The smoke-pipes to be carried outside of the roof and finished with Emerson ventilator-caps. The stairs to be continued from the second-story to the watch-room ; the lantern to be reached by a step-ladder, an iron trap-door being provided in the lantern-floor to shut out draughts. A door in the parapet to lead from the lantern to the gallery, which is to be used by the keepers to clean the lantern-glass from the outside ; it is to be protected by a plain wrought-iron railing. SPECIFICATIONS. 79 In the watch-room there is to be the clock apparatus for the fog-bell, the latter being placed over one of the large dormers which give light to the second-story ; proper boxes to be provided for the weights of this machinery as well as for the weight of the apparatus revolving the lens; both boxes are to be carried below the lirst-story floor, so that the weight can descend to the level of the cellar floor. The two floors of the light-house are to be constructed with timber joists placed 1 6 inches apart from centers, the first tier resting on the flanges of the wrought-iron framing-beams, the second tier on the flanges formed at the joint of the dwelling castings with the main-cornice castings. Both tiers of beams are to be stiffened by rows of cross-bridges. On these beams are to be laid the floors. The ontside walls of all the rooms and halls are to be lined with a double thickness of narrow tongued, grooved and beaded boards, with a layer of tarred roofing-paper between them; also the inclined inner roof surfaces; this lining to be nailed to pieces of furring, wedged tightly between the ribs of the iron-house inclosure and that of the roofs. The ceilings are to be lined with a single thickness of the same boarding. The cellar and the watch-room windows to have metal sashes ; the windows above, and the principal dormers, to have wooden sashes. The cellar to contain two water-tanks, into which the rain-water is to be conducted. Overflow-pipes lead from the upper part of the same to the outside. The lantern to have an iron parapet lined with wood, cast-iron lantern- posts, and a dome-shaped copper roof, terminating with a ventilator and pinnacle, which will form a lightning-rod. The whole light-house being of metal, there is a continuous metal con- tact with the water. • The focal plane of this light-house is to be 46 feet 8 inches, and the gal- lery is to be 14 feet 7>^ inches above the level of highest tides. Details. The top course of the caisson will be set on the sections Top course oi already completed and in place. caisson. It is made in 24 castings, each 15 degrees in arc, i inch thick, with bot- tom and side flangs \% inches thick; a horizontal flange on the inside, at the level of the under side of framing-beams, i inch thick ; and a small flange on top, forming a rest for the drop-flange of the gallery-plate. The castings will be strengthened by vertical ribs, as shown on the drawings. The lower horizontal flange of this course will be joined to the top flange of the upper section, in place, by ninety-six (96) i j4!'-inch bolts, each 4^4 inches long, four to each section. The holes for these bolts will be drilled after the work is set up at the place. The vertical flanges will be bolted to- gether by eight i^-inch bolts each. Two of the castings will have open- ings for windows, with flanges, the inner ends of which will be faced. Eight of the castings will have seats for the corner brackets, four right and fou r 30 SPECIFICATIONS, left, and eight other castings will have seats for the intermediate brackets, four right and four left. The top of the castings will be ulaned to receive the circular drop-flange of the gallery castings. The contractor will have the option of making the castings which form the top of the cast-iron tube, either in a single tier or course of 7 feet 8 inches in height, or they may be divided into two courses of 3 feet 2 inches and 4 feet 6 inches, respectively. In the latter case the horizontal joint will be made at the bottom of the belt molding, with iX-inch horizontal flanges, and ninety-six i^-inch bolts. As there may be a slight variation from a true circle in the present top of the cast-iron tube, the Engineer will furnish the contractor a templet giv- ing the shape exactly. The new course must be made to suit. Six mooring rings will be provided, made of wrought-iron, Mooring rings. riveted to wrought-iron plates, which will be fastened to the caisson by four l-inch bolts each, in such places as will be directed by the Engineer. The sashes for the two cellar windows, as shown in detail Cellar windows. on plate 4, will be of cast-iron. All the outside suafaces will be planed. The glass will be held in place by bronze strips, fastened by i^-irich tap- screws. Part of the hinges will be fastened to the caisson castings by two ^-inch tap-bolts each, the other part of the hinge being cast to the sash ; the holes for the pins, which are of steel, will be bored. The sash will be made water-tight by a continuous rubber band, and arranged to be drawn up close by means of two eye-bolts with thumbscrews. The sixteen brackets supporting the gallery will be of Brackets, cast-iron. The eight larger brackets intersect each other at right angles ; four will be full castings, the other four will be in two pieces each, which will be held together and to the full brackets by six ^-inch bolts. The eight intermediate brackets will be cast with a boss for the railing-standards. Each of the brackets will be secured to the caisson by two i^-inch bolts. All surfaces of contact of the brackets, and the caisson castings and of the brackets with each other will be planed. The dwelling and the main gallery will be supported by a Rolled beams, frame composed of No. 4 heavy 9-inch Phoenix beams and No. 13 6-inch Phoenix channel-irons. The beams will be of the following lengths : Two (2) 26 feet 9 inches long. Two (2) 19 feet 7 inches long. Four (4) 3 feet 6}i inchespong. There will be four pieces of channel-iron, each 19 feet 7 inches long. Where the beams intersect they will be joined by angle-irons made of ^-inch boile. -plate held by ^4^-inch bolts. One of the four angles of each intersection will be filled by a castmg forming a boss for the railing-standard. Four of the connections of the beams with the channel-irons will be made by castings which serve as sockets for the boat-davits ; they will be held to the beams and channel-irons by ^-inch bolts. The other four connections will be made by >^-inch boiler-plate bolted with 3^-inch bolts. The chan- SPECIFICATIONS. 8 1 nel-irons will be held to the intermediate brackets by the bolt ends of the standards passing through the same. The beams will rest on the flange prepared on the caisson casting, which will be planed at the places where the beams rest. The openings left between the webs of the beams and the caisson will be fdled wilh castings riveted to pieces of boiler-iron which are fastened to the beams by /j-inch bolts. The beams U'ill be bolted to the cast-iron brackets. The gallery will be made in 12 castings or plates, (shown Gallery plates. on place 3,) the upper surface made rough with checkers. A rising flange will be provided on the inside and a molded nosing and drop-flange on the outside. On the under side, the plates will have a system of strengthening ribs, and a circular drop-flange planed to rest on the top flange of the cai=;- son. They will be connected through side flanges by ^'^-inch bolts through the rising flange. Chipping pieces will be provided where the plates and their flanges rest on the beams and the channel-irons. All sur- faces of contact not specified to be chipped must be planed.. Plain margins will be left on the upper surface around the edges. Where the davits rest, a circular boss will be raised above the general surface, and where the braces are fastened through the plates and channel-irons, they will be pro- vided with lugs underneath. Two of the plates will be provided with circu- lar coal-holes with raised rims and cast-iron covers, which will be secured with chains to the flange below. One of the corner plates will be provided with chipping pieces for the attachment of the water-closet. The gallerv' railing will be of wrought-iron. The lower Gallery railing. ends of the standards pass through the flangesof the channel-irons and brackets and are secured to them by means of wrought iron nuts. The four interior angle standards will be fastened tothe angle castings. The stan- dards will be square where the rails are attached, and will be drilled for the bolts holding the palms of the lower rail; a circular collar will be forged on the lower end where the standards fit on the gallery. Holes are to be drilled in the rails to receive the ends of the stays ; in the lower ends they will be countersunk. The stays are made of }4-inch. round iron, reduced at the ends to ^'s-inch for riveting to the rails. The upper rail has a rolled-iron cap, (No. 56 Phoenix pattern,) ^yhich will be riveted to it with j4^-inch countersunk rivets, one to each alternate space between the stays. The bar-iron of the upper rail will have scarfed joints, drilled to slip over the ends of the standards, to which they will be held by ornamental brass nuts set on square washers of cast-iron. At the water- closet the railing will be joined to the jamb and to the joint of the plates by bolts, and the corner standard will here be omitted. There will be two gates, made similar to the railing, Gates, hung on two wrought-iron self-acting hinges. They will have a diagonal brace of bar-iron, through which the round irons of the caging will pass. Stops will be provided for the gates, which will be locked by spring-latches riveted to the upright frame. F 82 SPECIFICATIONS. There will be two ladders from low-water level to the gal- Ladders. lery, shown in the general plan, (plate 2,) and constructed as shown in detail, (plate 6.) The ladder-beams will be made of No. 15 Phoenix angle-iron ; the ladder will be in two sections, united in the middle by wrought-iron hinges with steel pins, bolted to one pair of ladder-beams and riveted to the other pair. The upper part of the ladder will be held in place by two wrought-iron brackets bolted to the beams. The lower part of the upper half will be held in place by a frame of T-irons and tie-rods of the dimensions shown on the drawings, bolted to the caisson by eight J^-inch tap-bolts, and to the lower end of the ladder-beams by four similar bolts. The two cross-pieces at the joint will form a tread, and the other treads will be spaced from the same with 10 inches average rise. The treads to be of wrought-iron, roughened on the upper side. A hand-rail of round-iron will be fastened to the outer beam of each ladder and to the ex- terior standard of the gallery. Three eyes will be provided to each ladder for the attachment of the hoisting-chain. Two will be [riveted to the beams of the lower half, 6 inches from the end. The third will be riveted to the right beam of the upper half, 2 inches above the hinge, in order to hang the chain when the ladder is lowered. There will be four wrought-iron boat-davits, of the form Boat-davits. and dimensions shown. The pivot at the bottom will be turned. A collar will be forged on for the bearing of the braces to rest on ; the portion above the same is to be turned. The braces will be made of No. 69 Phoenix iron, cut and shaped in the manner shown on the drawings, to be fastened with ^-inch bolts through the top flanges of the beams and channel-irons ; above they will be fastened to the wrought-iron ring, which will be bored to fit the davit by two ^-inch tap-bolts. A cleat for fastening the rope will be formed by two pieces of round wrought-iron tapped into the ring. The upper part of the davit will be flat with a drilled hole, through which an eye-bolt will be passed. The nut will be secured with a pin. The water-closet will be located as shown on the general Water-closet. plan; (the details of construction are given on another plate.) The gallery-plate, on which it will be fastened, will be provided with raised sur- faces for the reception of the foot-frame, made of 2 by 2 inches angle-iron, v/Iiich will be held to the plate by ^-inch bolts. A plain saddle-strip will be cast on, to run across the door-opening and around the sides. Three openings will be provided in the plate for the rain-water to flow out. The mantel of the water-closet will be made of ^-inch sheet-iron, stiffened at the bottom by a wrought-iron strip J^-inch by 2 inches, and fastened, by ^-inch rivets. A strip of the same dimensions will be riveted over the horizontal joint of the plates. A 2 by 2 inches angle-iron, bent in a circular form, will be riveted to the inside of the mantel, drilled and countersunk for six wood-screws to fasten the seat. Proper holes will be drilled in the foot-frame of angle-iron, for the fastenings of the risers, 2 inches apart,. SPECIFICATIONS. 83 which will be formed of narrow tongued and grooved boards. The door- jambs and lintel and the cornice will be of cast-iron, and the mantel will be riveted to the same by ^-inch rivets. The jambs will be connected with the gallery-plate and the lintel by ;2-inch bolts, the surfaces of contact be- ing planed. Two pairs of brass hinges will be provided, countersunk into and riveted to the jambs, to which the wooden door will be hung. The roof is made of two pieces of >s-inch sheet-iron ; it is shown in develop- ment on the drawing ; the joints are covered by strips of the same iron ; the lower edges are riveted to the cornice. The pinnacle will be made of cast- iron, with a wrought-iron point terminating in a bolt with nutand washer to secure it to the roof. The gallery-railing on one side will butt against a strip 2;^ by ]< inch, which is riveted to the side of the water-closet ; in front it will be fastened to the jambs by two 7-16-inch bolts. There will be two bulls-eye windows fastened to the mantel by tap-screws through circular strips, as shown on the drawings. The castings which form the outside walls of the dwelling Dwelling castings. are shown in detail on plate 7. They will be yz-v!\'esses. reached. Connections luith Sc'ver, All connections required to be made with branch, inter- Connections to be . ^ made without extra cepting or discharging sewers, and with manholes or inlets, charge, whether brick or pipe, are lo be newly built, repaired or re-connected, as the case may require, as the work progresses, and without extra charge therefor. They must be made carefully and in a perfect manner ; the bricks at the joining edge must be shaped smoothly to the proper curves, set securely and with a thorough bond. G 98 SPECIFICATIONS. Wherever ordered, bull's-eyes shall be built into the sewer, Bull's-eyes. at the given elevation and slope. They shall be circular in shape, have a clear inside diameter of three feet, and a four-inch ring of brick extending entirely through the side of the sewer. A length of vitrified drain pipe of approved quality, six House connections. inches internal diameter for house connections, shall be built into the sewer on each side where required, and at such distances apart as designated on the plan, without extra charge. They are to be built into the walls of the sewer, terminat- Discharge at 45 ing at an angle of 45° (degrees) when so ordered, with and "^^s'^ees. in the direction of the flow of the current, and at the given elevation and slope. They must also be set so that their inner ends will not Ends not to project. project withm tne inner surface of the sewer, and the bricks in the sewer wall must be fitted closely and securely around them. When the pipes are ordered to be laid at an angle different Pipes trimmed to from a right-angle, the ends of the pipes must be trimmed ^"s^^- to the same before being delivered on the work. The ends of all sewers, pipes, bull's-eyes and spurs, must Ends of connections be securely closed with brick masonry, or approved stone- ^° ^^ closed. ware covers when not immediately used, without extra charge. Where connections are made with sewers carrying water, New work kept dry special care must be taken that no part of the work is built ^' intersections, under water. A flume or dam must be put in, and the new work kept dry until finished. General Conditions of Agreement. Plans. The sewers are to be built of the materials, sizes, and dimensions, with the connections and manholes, on the lines, at the depths, and in the man- ner shown on the plans filed at the Department of Surveys. All dimensions, materials, lines and grades must be in full Work in accordance accordance with the plans. "^'^^ p^^'^^- All necesr.ary bull's-eyes 6r spors for connection of branch sewers, and all pipes for house connections are to be built in the proposed sewers at the points indicated on the plan of the work, without extra charge therefor. The Contractor will be furnished with a complete set of Plans furnished. drawings or tracings, showing all the details and dimensions necessary to carry out the v/ork. Dimensions given thereon in figures are to have the preference over the scale. The plans and specifications are intended to include what- Accidental omis. ever may be requisite to render the works complete, but ^'°"^- should anything be accidentally omitted, the same shall be executed by the Contractor. No deviations from the drawings or specifications will be Deviations. SPECIFICATIONS. 99 allowed, unless a written direction shall previously have been j:;iven to the Contractor by the Chief Engineer and Surveyor. The city of Philadelphia reserves the right to increase or Variation of quan- diminish the gross length of the sewer, the number and '"'^^* length of piles, also, the quantities of foundation plank, timber and stone masonry, with corresponding excavation, which are contained within the limi*:s of the plans, to the extent found necessary by the Chief Engineer and Surveyor. No allowance will be made in case of increase for any sum above the prices bid, nor in case of decrease for any real or supposed damage or loss of profit occasioned by such diminution. The time stipulated for the completion of the work will be proportionately increased or diminished. The plans and a copy of these specifications are to be pians and specifica- kept constantly at the work by the Contractor or his author- ^°^^ ^"^p'- ized foreman. The Contractor shall employ the District Surveyor to give District Surveyor. him the lines and grades for the construction of the work, and also for the making out of the assessment bills, on the line of the sewer. He is also required to preserve all stakes, bench-marks, etc., made or established on the line of work, until authorized to remove the same. Should any dispute arise between the Chief Engineer and Dispute as to true Surveyor and the Contractor, as to the true meaning of the meaning of plans. drawings or specifications in any point, the decision of the former shall be final and conclusive. Exeaitio7t of Work The Contractor must strictly follow, without delay, all or- Orders and instmc- ders and instructions of the Chief Engineer and Surveyor, ^'°"^- or his authorized Assistant, in the prosecution and completion of the work and every part thereof. The Contractor shall have charge of and be responsible for charj^e and respon- the entire line of works until completion. sibduy. He is required to give his personal attention to the faithful Personal attention, prosecution of the work, and not to sub-let or assign the same, but to keep it under his ov/n control, and, in case of his absence, to have a duly quali- fied person to look after the works. The work is to be prosecuted at and from as many different Prosecution of points, at such times, in such parts, and with such force as work, the Chief Engineer and Surveyor may, from time to time, during the pro- gress of the work, determine. During the progress and until the full completion of the work to be left whole work, the sewers, basins, etc., are to be kept thor- *^'^^'^- ouf^hly cleaned throughout and left clean. The Contractor shall furnish all necessary facilities, should Examination of fin- it be deemed advisable by the Chief Engineer, to make an '^^'^'^ ^°^'^' examination of any work already completed. If the work is found defective in any respect, he shall defray all expenses of such examination and of satis- 100 SPECIFICATIONS. factory reconstruction. If the work is found perfect, such expenses will be allowed for. The Contractor shall begin work within ten days from Time of commence- rr 1 1 ^1 • r T^ ment and comple- the date of the notice given to that effect by the Chief En- tion. gineer and Surveyor, and he shall progress therewith so as to complete the same in the time specified in his proposal, which will be reckoned from the date of said notice. No charge shall be made by the Contractor for hindrances Delays, or delay from any cause during the progress of any portion of the work em- braced in the contract ; but it may entitle him to an extension of time allowed for completing the work, sufficient to compensate for the detention, to be determined by the Chief Engineer and Surveyor : provided the Contractor shall give the Engineer in charge immediate notice, in writing, of the cause of the detention. Materials and Labor. The Contractor is to furnish all labor, materials, tools and Labor,materials,&c plant necessary to execute the entire work in the best possible manner. He is further required to employ only competent and Workmen. faithful laborers, and none but first-class mechanics, and whenever the En- gineer in Charge shall inform him in writing that, in his opinion, any man on the work is unfit to perform his task, the Contractor must discharge the same from the work and not employ him again on it. The ground shall be excavated in open trenches to the ne- Open trenches, cessary depth, and to the widths and lengths as specified elsewhere. No tunnelling will be allowed except by written consent Tunnelling. and in accordance with the directions of the Chief Engineer and Surveyor. The Contractor shall pump out or otherwise remove any Trenches kept dry. water which may be found or shall accumulate in the trenches or other ex- cavations, and shall form all dams or other works necessary to keep them entirely clear of water while the foundations are being laid and the masonry constructed. All the masonry throughout, whether of brick or stone, ah masonry in ce- shall be laid in cement mortar, made and laid as described ^"^^^ mortar. in these specifications. Mason-work of all kinds shall cease on the first day of Mason-work to December, unless the contractor is otherwise directed by a ^^■'^'^^ ^^'^^ ^^*^* written notice, and then only for such time as may be designated ; no work shall be resumed before the time appointed. Upon the suspension of mas- on-work, the same shall be well protected and the grounds left in good order, according to instructions given by the Chief Engineer and Surveyor. All materials furnished and all work done which, in the Unsatisfactory ma- opinion of the Chief Engineer and Surveyor, shall not be in "^^"^^ ^^^ v^ox^. accordance with this specification, shall be immediately removed, and other materials furnished and work done which shall be in accordance therewith. The contractor, without a written permission from the Material for refilling SrECIFICATIUNS. lOI Engineer in charge, is required not to sell, remove or permit to be removed from the line of the work, before the trench shall have been refilled, any sand, gravel or earth excavated therefrom which may be suitable and re- quired for refilling. All sewers, culverts, drains or basins rendered unnecessary Filling in of old or becoming disused by the construction of the work herein ^'■^'"^• contemplated, must be filled in and made good without extra charge. All material, etc, excavated from within the required Property of con- limits of excavation shall be considered property of the con- ^^^^^°^- tractor, excepting water, gas, and drain pipes, paving blocks, curbs and flagging, which, in case they are not required to be replaced, must be piled and left in such part of the street as may be directed. If any disputes or differences shall arise as to the efficiency pi-'^putcs as to qual- ^ ,. r • 1 ^ 11 1111 ity of materials and of labor or quality of materials employed, they shall be set- labor. tied by the Chief Engineer and Surveyor, whose decision shall be final and conclusive. Interference ivith Travel and Works. All material excavated or delivered shall be placed where Travel. directed, so as to interfere as little as possible with travel; and unless special permission is granted to the contrary, footways shall be kept clear of earth for a width of three feet, for which purpose boards shall be set to hold the bank where needed. The contractor shall provide and maintain all neces- sary fences and bridge-ways, and shall prosecute his work so as not to inter- fere with or obstruct the running of street-cars, and no charges against the city or railway companies for extra cost on this account will be allowed. The contractor shall place sufficient lights on or near the Watchmen and work, and keep them burning from twilight until sunrise, lights. and provide watchmen on the work for the safety of the public, whenever deemed necessary by the Chief Engineer and Surveyor. The contractor is required to sling, shore up and secure Water and gas in their places all water and gas pipes, without injury, and pipes dramage. to provide for and maintain the flow of drainage and water-courses, whether on the surface or underground, which may be interrupted during and by the progress of the work. Where it becomes necessary to remove the pipes from their position, they shall be carefully cared for and replaced by the contractor, or at his own cost. The carriage and foot-ways on the line of the work are to Regarding repav- be regraied and repaved to the extent which the aforesaid ^"S' ^"^• work may render necessary. All curb, gutter, flag and paving-stones, which may have been displaced on account of the work, are required to be care- fully reset. Should any of said stones have been broken in consequence of any act or omission of the contractor, ne.w stones, to be approved by the Engineer in charge, shall be furnished and set in place thereof by the con- tractor at his own expense. 102 SPECIFICATIONS. The whole of the regrading and repaying, etc., must be Kept in repair. done to the satisfaction of the Chief Engineer ^nd Surveyor, and kept in good repair for a period of one year from the date of completion. All works of drainage intercepted or connected shall be Underground work, restored and made good, and all surplus and offensive material shall im- mediately be removed from the drains. Damages and Penalties. The contractor shall be responsible for all injury to water Damage to water pipes, gas pipes or other structures met with in the prose- ^"^^ ^^^ pipes, cution of the work, and shall be liable for damages to public or private property resulting therefrom, which amounts may be deducted from any es- timate due him. In case of any accident, as aforesaid, the contractor shall Immediate notice, give immediate notice to the proper authorities. The contractor shall assume all responsibility for loss, Damage to persons damage or injury to persons or property, arising out of the o^ property, nature of the work, from the action of the elements or from any unforeseen or unusual difficulties. Should the sewer lead through private premises, the City Private premises. of Philadelphia will pay the compensation for right of way, but no other damages. The contractor agrees to idemnify and save harmless the Suits and claims. City of Philadelphia from all suits or actions of every name and description brought against it for or on account of any damages or injuries received or sustained by any party or parties by or from the contractor, his agents or ser- vants, in the performance of the work under the agreement. The contrac- tor further agrees that all or so much of the moneys due to him under this agreement as shall or may be considered necessary by the Chief Commis- sioner of Highways, shall or may be retained by him until ail such suits or claims shall have been settled, and evidence to that effect furnished to his satisfaction. If any part of the street, sidewalk or curbing on the line Repairs to street of the same shall, in the opinion of the Chief Commisioner ^'^^ °"^ y^^"^- of Highways, require repairs within one year after the date of completion, the contractor shall, within three days from the date of notice given, make the necessary repairs ; and if he neglects to comply with such notice, the Chief Commissioner of Highways may employ other men to make such re- pairs, and the cost thereof shall be paid by the contractor or his sureties. The contractor or his sureties will be held liable for keep- Sureties bound for ing in perfect repair and good order the whole of the ?ie'w ^^""^^ years, works to be constructed under the contract for three years after the date of completion. If the Contractor shall abandon the work under this agree- AbandonmePt or ment, or if, at any time, the Chief Engineer and Surveyor ^^^lay. SPECIFICATIONS. 10 3 shall be of the opinion, and shall so certify in writing to the Contractor and City Councils, that the work, or any part thereof, is unnecessarily delayed, or that the Contractor is wilfully violating any of the conditions or covenants of the contract, or executing the same in bad faith, then the contract shall become null and void, the security bonds forfeited, and the materials delivered at and built into the work shall be property of the City of Philadelphia. Should the work under this agreenicnt not be tinished P'^n-^'ty. for non- .,. , . .-..^ ,,,^^. completion within withm the time specined, the Contractor shall torfcit a sum specified time, of twenty dollars for each and every day which shall elapse after the expired time to the date ol completion. Payjnents. Payments will be made to the Contractor in monthly in- Payment in month- stalments of eighty per cent, on the amount of work executed '>' instalments, during the preceding month, under and in accordance with the provisions and stipulations of the contract, which will be certified to by the Chief En- gineer and Surveyor. Final and full payment of the balance due the Contractor, Final payment one r 11 1 11-1111 • -n 1 1 month after comple- aiter all legal and equitable deductions, will be made upon tion. the certificate of acceptance and approval of the Chief Engineer and Sur- veyor, one month after the date of completion, provided the whole work, and each of its parts, including the street, be in perfect order. The Contractor shall accept, as part payment of the Assessment bills. amount of his contract, the assessment bills charged upon the properties in front of which the sewer shall be completed, as per Ordinance approved May 1 2th, i866, and supplemented by Ordinance approved February i6th, 1869. He shall collect them at his owm cost, and the better to enable him so to do, he may use the name of the City of Philadelphia, and employ all legal remedies or proceedings, whether of lien or otherwise, to which the said City may be competent. The Contractor shall not be entitled to demand or receive Extra work. payment for any work as extra w^ork, unless ordered in writing by the Chief Engineer and Surveyor to do the same as such, and at a price fixed by him previously to its commencement. SAMUEL L. SMEDLEY, Chief Eiigitieer and Surveyor. 104 SPECIFICATIONS. Wilmingto7i, Delaware^ Water Works. Specifications For Completing the Cool Spring Reservoir. Office of Board of Water Commissioners, See page 262. Wilmington, Del., June 25th, 1877. Section i. The contractor shall take the reservoir as it now stands, and begin by excavating so much of that portion of the middle bank known as the overflow, as may be required. This excavation shall be made by car- rying down the present slopes of the ends of the overflow to a depth of \\%, feet from the present surface of overflow, and will comprise about 1452 cubic yards. After this excavation is no longer needed as a passage way, it shall be puddled up as hereafter specified to the general level of middle bank, dove-tailing or off-setting the ends into the banks to a depth at right angles to slope of not less than 6 feet ; this puddling will comprise 1600 cubic yards. Such clay for puddling as may be approved by the Engineer, shall be used ; it shall be free from roots, sods, stones or other injurious material. Shall be placed on in layers of not over 4 inches in depth, shall be solidly rammed, the surface of each layer being broken up as specified in section 5, before another layer is deposited, and the whole completed to the satis- faction of the Engineer, and in accordance with the lines and levels as given by him. The work upon the South Basin shall not be commenced until such time as may be directed by the Commissioners, with such changes in the terms of the specifications, or addition to or alteration in the character or quantity of material as may be deemed expedient, or the con- tract may become null and void, at the discretion of said Commissioners^ upon the completion of the North Basin. Section 2. The roadway leading into the North Basin shall be taken out as soon as the overflow shall have been excavated, and the slope and bot- tom now covered by said roadway be prepared to receive the clay puddling" and brick lining, by bringing the same to a proper grade, removing all stones or rocks which may protrude from the bottom or face of slope, and by excavating a ditch at the foot of slope, which shall be not less than 2% feet deep from rough bottom, 6 feet wide and not over 100 feet long; said ditch to be filled with puddled clay, prepared, deposited, and rammed as specified in section 5. The material from said roadway shall be deposited at such point within the reservoir grounds as may be designated by the Engineer. Section 3. All weeds and grass shall be pulled up, and, together with stones, be removed from bottom and slopes. The unpuddled portion of the bottom of the North Basin shall be brought to its proper grade, the v.'aste material being removed to such point within the grounds as may be designated by the Engineer. SPECIFICATIONS. IO5 Section 4. So much of the upp',r surface of the puddle now in place, which has been injured by frost or exposure, amounting to about one thou- sand cubic yards, shall be taken off and removed entirely from Basin, or used in connection with other material as puddling, at the discretion of the Engineer. Section 5. The whole bottom of the North Basin shall be covered with such cjuality of clay-puddling as may be approved by the Board of Water Commissioners, to a depth of 24 inches, from rough bottom, including therein such portions of the bottom already puddled, as may be approved by the Engineer. The sides or slopes shall be lined with the same quality of clay as that above mentioned, and at the bottom shall have a depth of 24 inches, measured at right angles to the slope, and shall taper to a depth of 20 inches at the top, measured at right angles to slope. The clay shall be put on in horizontal courses or layers, not exceeding 2 inches in thick- ness, and must be ground in a mill suitable for the purpose, unless other- wise directed by the Engineer, before being delivered at the reservoir, and all surface soil, sods, roots and stones shall be carefully excluded. The ex- cavation and preparation of the clay shall be made under the direction and superintendence of an agent appointed by the Board of Water Commis- sioners. The clay shall be thoroughly incorporated with the existing banks ; shall be rolled on bottom and rammed on slopes, to such a degree of solidity as may be required by the Engineer; and the surface of each layer shall be sufficiently broken up by picking or otherwise, so as to insure a thorough incorporation of the succeeding layer with it ; the clay shall be moistened sufficiently to puddle properly, and after having been so packed or pud- dled, shall be kept constantly moist till protected by bricks or gravel. After the clay-puddling has been put on as specified above, it shall be accurately dressed and graded to the slopes, curves and other lines ; shall be perfectly solid and free from cracks or other defects, and in every respect be properly prepared to receive the coating of gravel or brick. Section 6. The bottom of the basin shall be covered to the depth of 4 inches with good clean gravel, which shall be freed from all stone of over Yz an inch in diameter, by screening, and shall be such as may be approved by the Engineer, and be rolled or otherwise consolidated. Section 7. The bottom of the basin shall be paved, except as specified in section 8, with the be$t hard burned brick, which shall be straight and smooth and of uniform size and quality, laid flat, in sufficient clean sand to properly seat them, and shall be covered with sufficient clean white sand to completely fill in the spaces between the bricks, said white sand to be brushed or broomed into the joints in the usual manner. Section 8. At the entrance of the main pipe into the basin, a flagging shall be laid in cement; flag stones of not less than 6 inches thick, 9 feet long and 2 feet wide, accurately dressed and faced, and to conform in all respects to the stone used as coping on the walls around the reservoir shall be used, laid flat and well bedded in hydraulic cement, covering a space oi lo6 SPECIFICATIONS. 9 feet wide and twelve feet long. At the point where the communicating' pipe enters the basin, a space 6 feet wide and nine feet long shall be cov- ered with stones of the dimensions, and laid in the manner, specified above. Section 9. The sides or slopes of the basin shall be covered with same quality of brick as above specified, laid in hydraulic cement mortar, made of one part of the best Rosendale cement, or any other which may be ap- proved by the Engineer, and one part clean, sharp, river sand, mixed only in such quantities as can be used immediately, and kept stirred until so used ; the bricks shall be laid on edge, one over the other, in two courses, so as to form a 9 inch wall, and in such a manner that all joints shall be broken ; no ties nor headers shall be used in its construction, and the joints shall be carefully pointed as the work progresses. Each brick shall be dipped into water before being laid, and the face of the wall shall be kept wet from the time it is begun till one week after it is finished. The wall or lining shall be finished at top in such a manner as will fit it to re- ceive a stone coping. Section 10. Any of the conditions and specifications herein given may be changed or modified by the Engineer to meet any unforeseen contingency, or as may be suggested by the interests of the City, or as circumstances may require ; if they increase the cost of the work, shall be subject to sec- tion II, and if they decrease the cost, such decrease shall be in proportion to the rates paid for similar work. Section 11. No claim or bill for extra work shall be allowed or paid, un- less said work has been done by special written agreement with the Engin- eer, ratified by the Board of Water Commissioners, entered into prior to the commencement of such work. Section 12. All the work shall conform with such lines, levels, depths, slopes, curves and circles, or with such dimensions and shapes as may be directed by the Engineer. All stakes, lines, levels, &c,, shall be given by or at the direction of the Engineer. Section 13. All the different portions of the work shall be done in the order designated by the Engineer, and all the work herein specified and contemplated, or found necessary, shall be done in accordance with his or- ders and directions, and he shall be the judge of the quality and fitness of all the machinery used in the work. Section 14. On the completion of the Basin, all surplus materials, earth and rubbish of every kind, shall be disposed of within the reservoir grounds as directed by the engineer, and all structures, implements, &c., shall be removed from said grounds as may, at the time, be directed. Section 15. All labor, tools,, appliances and appurtenances of whatsoever kind, required to do the work in proper and satisfactory manner, shall be furnished by the contractor. The contractor, however, can have the use of the six heavy Rollers now in the basin, on condition that he returns them to the Commissioners when the work is completed, in the same perfect condition they are now in. SPECll'lCATIONS. 107 Water for puddling and mortar can be had from the city main on the FrankHn Street bank of the basin at Eleventh Street. Section 16, The contractor shall, when required to do so by the engineer, remove from the work any superintendent, workman, or other person em- ployed on said work, who shall refuse or neglect to obey the instructions of the engineer or his agent in anything relating to the work, or who shall perform his work in any manner contrary to the specifications or directions of the engineer, or who shall be deemed by him incompetent or unfaithful. The contractor shall also, on the demand of the engineer, discharge from the work on the basin any drunken, disorderly, insolent, or otherwise dis- agreeable person, and shall not again employ him on the work without the consent of the engineer. Section 17, All measurements and estimates of gravel, brick and flag- ging shall be made after the above mentioned materials have been put in place in the basin ; the clay for puddling shall be measured in excavation after the top soil or other objectionable material has been removed. Section 18. In the absence of the engineer, any person he, or the Board of Water Commissioners may designate as having charge of the work or any part thereof, shall have and exercise all the powers of said Engineer, in all matters relating to the execution of the work herein specified, and the orders of said person shall be fully observed and obeyed. Section 19. The engineer shall furnish monthly estimales to the Board of Water Commissioners of the amount or quantity of work to be paid for, and of all such work as may have been done during the preceding month. Section 20. In case of the refusal or neglect of the contractor to remedy and make good any defect in the work, within the time required, such work may be done by order of the Board of Water Commissioners, and its cost deducted from any amount due or to become due the contractor. Section 21. No part of the work shall be assigned or sub-let to any per- son or persons, without the consent of the Board of Water Commissioners, and if any part is so assigned or sub-let, it shall not in any wise affect the conditions or provisions of these specifications. Section 22. None of the work shall be considered as accepted, which may be found defective in its construction or_ execution, before the final accept- ance of the whole work. Section 23. Should the contractor fail to deliver any material, or do any work at the time required by the engineer, the latter may order the same done, and have the cost thereof deducted from any amount due or to be- come due the contractor. Section 24. If the engineer shall certify, in writing, to the Board of Water Commissioners, that the work is unreasonably delayed, or any of the conditions of the agreement or specifications are violated, the said Com- missioners shall have full power to annul the contract or agreement, and after notice in writing to the contractor to this eftect, it shall, thereupon, become null and void and of no bindine effect. I08 SPECIFICATIONS. Section 25. The engineer shall define the meaning and intent of the specifications herein contained, and his decision shall be final. Section 26. Wherever the word '^ contractor" is used, it refers to and de- signates the party who enters into an agreement to execute and perform the work as herein specified and contemplated, or the legal representatives of said party. Section 27. Wherever the term Commissioners or Board of Water Com- missioners is used, it refers to and designates the persons declared to be Commissioners for the purpose of completing the Cool Spring Reservoir, chapter 440, vol. 15, part 2, Laws of Delaware, passed at Dover, March 20th, 1877. Section 28. Whenever the word engineer is used, it refers to and desig- nates the person who shall act as constructing and superintending engineer in the construction and completion of the Cool Spring Reservoir, in the city of Wilmington, Delaware, under the direction of the Board of Water Commissioners. Section 29. The South Basin shall be completed in accordance with the above specifications, except in regard to the time mentioned for completion of the North Basin, unless said specifications be changed, &c., as stated in section i. Section 30. The contract must be signed within three (3) days after the award of the work,* and the work must be commenced by the contractor within five (5) days after notice of said award has been given said contractor by the Board of Water Commissioners, and the whole work necessary for the completion of the North Basin shall be finished on or before November 1st, 1877. Section 31. Proposals must be made for each Basin separately, also, for a specific or total amount of the w'hole work complete, and bidders must name the price they offer to do work or furnish material for, in writing, as well as in figures. The Board of Water Commissioners reserve the right to reject any or all bids. Section 32. Each bid must be guaranteed by two responsible men, known or properly vouched for to the Commissioners, and whose signatures must be appended to the guarantee. Section 33. The contractor shall give such security for the faithful per- formance of the contract as may be required by the Board of Water Com- missioners. Section 34. Cash payments will be made monthly, payable on the 25 th day of each month, of eighty-five (85) per cent, of all estimates or bills ap- proved by the Board of Water Commissioners, for work done or materials furnished, during the preceding month, and the balance of fifteen (15) per cent, will be paid in cash upon the satisfactory completion of the contract, and the engineer's approval of the work and its acceptance by the Board of Water Commissioners. SPECIFICATIONS. IO9 Section 35. The following are the estimated quantities and material re- quired for the completion of the North Basin. — 8,400 Cubic Yards Puddling. 1,200 *' '' Gravel. 670 " " Sand. 3,000 Bbls. of Cement. 1,200,000 Bricks. 81 Lineal feet of Flagging. The following are the estimated quantities and material required for the South Basin: — 1,200 Cubic Yards Puddling. 1,400 " " Gravel. 670 '' " Sand. 3,356 Bbls. Cement. 1,326,000 Bricks. 81 Lineal feet of Flagging. Section ^6. The foregoing quantities and materials have been estimated approximately, and parties proposing to bid are requested to examine the Reservoir in its present condition, and judge for themselves as to the character of the work, cost and quantities of clay, gravel, brick, cement, sand, and other materials, and of ah the details and circumstances affecting the cost of the work. Section ^y. Bidders for this work are informed that it is the intention of the Board of Water Commissioners to have the work herein specified per- formed in the best manner possible, and of the very best materials, and that they will be rigidly held to an absolute performance of each portion of the specifications. Section 38. Proposals must be sealed, and marked, ^' Proposals for com- pleting the Cool Spring Reservoir,'' and must be addressed to the Board of Water Commissioners, and will be received at the office of John P. Alliniond, corner of Market and Eighth Streets, Wilmington, Delaware, until 3 o'clock P. M. on Tuesday, the loth day of July, 1877. Signed, JOHN P. ALLMOND, JAMES BRADFORD, CAESAR A. RODNEY. MAJOR S. CANBY, Resident Engineer, M. C. CONWELL, Co}isulti)ig Engineer. Co??i?nissio?iers. no SPECIFICATIONS. Architectural. For the Ccitsiruction of a College Building, Specifications For a College Building for the University of Pennsylvania, at See page 267. THIRTY-FOURTH AND LOCUST STREETS. Each part of the Building to be completed in a good Workmanship and workman-like manner to the full intent and meaning of Inspector. these specifications and the drawings, and details hereafter to be furnished in explanation of these drawings, to the entire satisfaction of the Building Committee or their Architect: — who shall have full power to refuse any ma- terial different from those described to be used, and to cause any unsound work to be taken down at the Contractor's expense. Any work or material necessary for the proper construe- Material not men- tion of the Building, or deemed by the Architect essential tioned but necessary to properly carry out the plans — even though not specially mentioned, but evident from the nature of the case, to be done by the Contractor, without extra charge for the same. If any alterations should be made in the drawings, or any Alterations, if any. change of construction, or difference of material, other than expressed by the plans and specifications ; the cost of such changes or alterations, to be determined upon before being made, and agreed upon in writing, otherwise no charge for the same to be allowed. Should such change or alteration cost less than the work Variations from as originally agreed upon, the difference in amount to be contract pnce. deducted ; if more, the difference in amount to be paid to the Contractor. Heights of the Stories. The Building has a cellar 9 feet high in the clear, under Cellar. Assembly, Corridor, Stairways and S. E. Room, and under Janitor's Room. Basement 14 feet, First Story 15 feet. Second Story 14 Basement, ist, 2nd, feet 6 inches. Third Story wings 14 feet. Third Story rear ^d and 4th stones, centre 16 feet. Chapel 28 feet, and Fourth Story Centre Building 16 feet, all in the clear of floor and ceiling. The various dimensions of the Building, and sizes of the Dimensions, different rooms, are figured on the pla.is. Excavation. The trenches to be excavated to a sufficient depth to allow Trenches, for secure foundation. They will be arranged according to grades of the lot ; to be one foot below present surface of ground. Any additional depth SPECIFICA LIONS. 11 L required for a good foundation to be extra ; and to be done by Contractor for the sum of 30 cents per cubic yard. The space under Corridor from east to west the entire Space under Com- length of the Building to be 7 feet 6 inches deep, or deeper *^°^' ^'^■ if the surface is lower, below top of fiasement floor, for cold air duct or passage way. Trenches for foundations of outside wall must in all cases Trenches for foun- , --, . - ,. jiT^i daiions of outside be 4 feet below surface of ground when graded. Depth can walls. be measured from elevations at different points. — Trenches for footings of all bearing walls, must be not less than i foot below the lowest level adjoin- ing them, or as much further as may be necessary to insure perfect solidity. — Trenches for foundation of Corridor Walls to be i foot below surface of ground in cellar. Drain Pipe in air duct to be at least 2 feet below ground Drain Pipe. at highest part. Excavations to be made for all drain pipes, air ducts, water and gas con- nections, where required. The ground forming the beds of trenches, for all founda- Beds of Trenches, tion walls, to be beat down, and when the v/alls are in, the earth to be well rammed dow-n, in the spaces on each side of them. All foundation trenches below grade, to be sufficiently Foundation wide to allow for making a two-faced wall. 1 reaches. The surplus earth to be deposited around the Building, and graded as required. The portions arranged for Cellars are under the S. E. Cellars. Room, the Library extension in centre of rear, the Corridor from east to west, space under Janitor's room, and the Stairway bays. All the remainder to be filled within two inches of the level of the Basement floor — to be after- wards covered with Asphalt Pavement. Stonework. All foundation walls to be built of best quality hard build- Foundation Stone. ing stone, such as Leiperville or Fairmount Stone: — All footings to m.easure at least 6 inches wider than the wall above it. First course of foundation of outside walls to be of three- Concrete. men or through stone, laid on thick bed of mortar or concrete laid in the trenches. Second course of two-men stone, and the remainder to the first floor, of large stone, laid on their broadest beds, and hammered down solid. Basement walls to top of first floor, where exposed, to be Leiperville Stone. faced with Leiperville Gray Stone ; to be large stone and laid broken range rock work, capped with w^ater table course of Hummelstown Hummelstown Brown Stone, around the entire Building as per detail, pro- Brown Stone, jecting beyond Basement Walls--(8 inches by 12 inches.) 112 SPECIFICATIONS. Sills of doors and windows to be square droved ; jambs, arches or other heads of openings, to be of Leiperville Stone, and finished from the point. All exterior walls above Basement to be faced with Ser- Serpentine. pentine Marble ; to be laid broken range work, finished from the point for the entire Building. All stone to be large and flat, well bonded and bedded and hammered down solid, and in no case to be built more The Walls, than lo feet high until the mortar is well set. All wall Cornices, Cappings of Buttresses, and Gables, Cornices, sill and belt courses and arches to be of Ohio Stone, in form Ohio Stone, and style to conform to the elevation and detail drawings, hereafter to be furnished. Cut stone joints. Arches of windows and doors, to be drafted and pointed. Jambs. Jambs square and chamfered, 8-inch reveal. Corridor windows, 12 -inch re- veal, to be pointed with the tool. Corners and buttresses pointed. Window sills, buttresses and gable cappings to be square droved. All string courses between window sills, &c. to be drafted Stringcourses. and pointed. All interior walls in Cellar, and backing of exterior walls. Interior Walls, to be of good hard common quarry building stone, laid on their broadest beds, well bonded and hammered down solid, and bedded in good gravel mortar. All walls tinted gray on plans are stone of various thicknesses which are figured. Front porch to be built as per design, and detail drawings Front Porch to be furnished. To be tool dressed work, with polished Scotch granite columns, and carved Ohio stone caps. Body of porch to be of gray stone from the Franklin quarries. Base course of brown stone. All the steps to be of granite. Floor of porch to be laid with rubbed blue flag, with one Floor of Porch. red stone in centre. The floor of water closet rooms in basement to be laid with flag stone 2 inches thick. All work exposed, to be properly pointed with tinted Port- Pointing. land cement, as directed. All joints to be thoroughly raked out before pointing. All area walls to be capped with flag. Slate hearth to be fur- nished for the grate. Strips, plugs, blocks, scantling, &c., to be built in walls, where required, for nailing stripping grounds or wood work. Especial care to be taken with all walls and piers support- Walls and Piers. ing columns. All angles to be kept plumb and true. Cellar stone walls to be smoothly dashed and broomed. Large stones to be placed under all girders, beams, &c., where required. The tiling of vestibule to be white Italian marble, laid in Tiling of Vestibule. squares diagonally with border as per plan; to have lo-inch Skirting, skirting moulded edge of marble. The stone mason must furnish, erect, and remove all scaffolding necessary for his work, and must put up from time to time, as the work progresses. SPECIFICATIONS. I I 3 shields of boards to protect the work when it is done, from damage, and be responsible and required to repair any injury that may be done by neglect of this precaution. Cold air tlues and gas or smoke flues to Flues. be topped out with stone, pointed, 4 feet above roof and capped with flag stone. Any additional depth of foundation necessary for perfect solidity, to be extra, and to be done by Contractor at the rate of $4.50 per perch. Brickivo7'k. All walls tinted red on plans, to be built of hard burnt brick laid in com- mon bond — five stretcher courses to one header course, bedded in plenty of strong sharp sand and lime mortar. One- fourth salmon brick may be used. The brickwork of flues to be all struck joints and not pargetted. Relieving arches to be turned over all lintels where practicable. Floor of that part of Cellar arranged for heating apparatus Cellar Floor, and fuel, to be paved with approved asphalt pavement not less than 3 in. thick, the filling having first been made solid by puddling or ram- Filling Arches. ming, as the Architect may direct. Arches between beams of floor and ceiling of Assembly and Library, floor over furnace room and boiler room, to be 4 in. brick with haunches rilled in level with top, with a concrete or mortar, brick-bats, coarse gravel, (S:c. Arches to be constructed over open- ings under Corridor Walls — wooden blocks, furnished by carpenter, must be walled in wherever required, to which to secure the wood finishings of the interior. Bricklayer must furnish, set up and take away his own scaffold and centres. Brickwork of heating apparatus, air chambers, fire brick in flues, 6cc., to be built as directed. The contractor for brickwork must assist in securing iron stairways m their place, and in the placing of all beams and iron work connected with the brick work. The large flues marked X, to start at foundation, and Large Flues. especial care to be taken to keep them plumb and of the same size their whole height. Openings must be left in these flues in each story, 2 feet wide and 3 feet high. The wainscoting at these points to be put in with screws, so that access can be had to the flues. The entire floor of Basement, except the portion used for Water Closets, where no other kind of floor is specified, to be covered with approved Asphalt Pavement, 2 in. thick, the filling having first been AsphakPave- made solid by puddlmg or ramming, as directed. Chmi- Chi-mney Tops. ney tops of stone or terra cotta, as per elevations and detail drawings, to be furnished and set. Large ones to be 2 in. thick at the thinnest parts, to be properly made with socket joints and set with cement. Ventilating flues to be topped out 10 in. above roof and tinned over. The outside pavement, over Boiler Vault, to be of the ap- Asphalt Pave- proved Asphalt before mentioned, 3 in. thick. m^nt.. H 114 SPECIFICATIONS. Carpe7iter Work, Lumber, &^c. The contractor for Carpenters' and Joiners' work must furnish all the lumber and other materials required, to do and perform and carefully com- plete all the Carpenters' and Joiners' work upon the building, agreeably to- the drawings, and execute said work in the best and most workmanlike manner, and to the satisfaction of the Architect. All the Lumber used must be of the best quality, free Quality of the from unsound knots, shakes or rot ; — it must be well and Wood. thoroughly seasoned before using, (by kiln drying when necessary,) and be in a state proper for the various purposes for which it is destined to be used. The boards for the floor over brick arches to be laid on scantling 3 in. by 4 in, fastened securely to the brick work of the arches, by Floor Boards. bedding in concrete. All wooden girders supporting floor joist to be com- posed of three pieces, 3 in. by 12 in. white pine, pinned and strapped together. All joists to be 3 in. by 12 in. ail under 20 feet span to be Joist. of spruce, and all longer than 20 feet to be of white pine; to be placed 16 in. between centres. All trimmers around flues, (no wood Trimmers. in any case to be within 9 in. of a flue,) stairs, &c., to be double joist pinned together, and where long spans, every third joist to be hung with stirrups. All joists of 16 feet lengths or less to have one row of cross bridging through each tier — ^all over 16 feet to have 2 rows. All joists to be brought to even widths. All to be backed. First, second, and third floors to be deafened by nailing cleats on joist, boarding, and filling in with mortar i^ in. deep, yi in. Cleats. from top of joist. All floors to be laid with all heart yellow pine, mill-work boards \% in. thick, none more than 5 in. wide, and on first floor none more than 4 in» wide ; to be tongued and grooved, and securely nailed to joist and after- wards smoothed off. Stud partitions to be 3 in. by 6 in. and 3 in. by 4 in. Stud Partitions, helmlock bridged. Floor over chapel to be constructed on six principal Floor over Chapel, rafters, spanning the whole width. Wall beams to be 4 in. by 1 1 in. ties or straining beams, to be in three pieces 4 in. by 12 in. blocked apart and bolted together — crossties or curved braces to be two pieces 3 in. by 12 in., these to rest on large stone in wall; braces 4 in by 12 in. Queen posts 12 in. by 12 in. to be properly framed, and have the necessary bolts and straps to make a secure job, and to conform to the detail drawings hereafter to be furnished. These support the floor of the fourth story, which will have 3 in. by 12 in. joist, 16 in. centres — to have three rows of cross bridging, partitions above to be framed to relieve the weight from centre of girders. SPEC] FlCAi IONS. 115 Wall plate around the entire Building 3 in. by 12 in. se- Wall Plate. curely bolted to the walls, about 10 feet apart all around. Bolts 3 feet long }^ in. thick. All other roofs of Main Building and wings to be constructed in the usual manner of Mansard Roofs, with side studding 3 in. by 6 in. spiked to plate. Upright studding 3 in. by 4 in. — Upper or roof plate 3 in. by 8 in. — Px.afters for short spans 3 in. by 8 in. and 3 in. by 10 in. — For long spans 3 in. by 12 in. as may be directed. Ceiling joist 2 in. by 4 in. Ties and braces, and all wood work of principal Rafters Ties and Braces, of Chapel which show below^ plastering, to be planed smooth and cham- fered, and to be varnished and oiled. All the roofs to be covered with tongued and grooved white pine boards, i in. thick, firmly nailed to rafters and studding. All outside walls to have stripping i in. by 2 in. securely Stripping, nailed to plugs or strips for lathing. Washboads first story in Corridor and where there is no Washboards, wainscoting, to be 10 in., including 2}4 in. sub. and i}i in. moulding. Second story in Corridor, 8 in. including moulding and sub. Washboards in third and fourth stories 6 in. bevel or bead top. Washboard throughout Basement, where it is floored with boards to be 6 inches. May be cement where asphalt pavement is laid. In all the large rooms of Main Building and Wings, As- Wainscoting, sembly in basement, and the window sides of Library, to be wainscoted per- pendicularly, 3 ft. 6 in. high, with yellow or white pine clean stuff, 4 in. wide and under, tongued and grooved and beaded to the level of the window sills. The window sills forming the cap of wainscoting to have Capping. iX inch nosed edge with 1)4 inch ogee moulding beneath. Washboard in this case to be 6 inch scotia or bevel edge. Wainscoting to be left out of those windows required for coils or radia- tors. Wainscoting to be put up with screws at opening in clock weight flues. Windows. The windows throughout to be double hung, except Windows. those Gable and Dormer, which have stationary sash — to conform to the elevations and detail drawings. All reveal frames, white pine, with 2 in. bead, or large Reveal Frames. ogee moulding as may be determined. Sills 3 in. heart yellow pine. Jambs plastered and Sills. Sash. splayed where marked with 2 in. bead on angle for protection to plaster and finish. Inside shutters. — All basement windows to have inside panel shutters, i /+ in. thick, cut in middle and made in folds to suit jan-ibs — inside Shutters. Il6 SPECIFICATIONS. hung with butts, secured with yellow pine or iron bar and wrought iron staples. All first and second story windows, except Corridor Windows and on stairs, to have inside pivot or rolling blinds, i}i in. thick, cut in middle and made in folds to suit jambs. — Jamb shutters to be panelled. Shutters in rooms on either side of "ftiain entrance to be made to fold in boxes. Architraves of these to be made to suit the arrangements Architraves. of the openings. All windows, except Dormer and Gable windows, to be finished square inside. Dormer windows to have 1)4 in. Dormer Windows. sash to small windows, i){ to large — to be double hung where practicable; all to be made according to the elevations and detail drawing and direction of the Architect. Side lights of Corridor Doors at ends and interior Side Lights. throughout to be double hung as window sash — Centre lights of Tran- som Sash to be stationary. Lintels over inside of window openings to be three pieces, 3 in. by 8 in. No shutters to chapel windows. Z)oor Frafnes. Basement door frames in Interior to be made of 3 in. by 4 in. scantling, walled in flush with both faces of wall. Lintels to be 3 in. Door Frames. by 6 in. cut with 4 in. rise, to have 9 in. arch over. Lintels of all doors in brick walls of upper stories, to be made in the same manner. Doors. All interior doors in Basement, and all communicating doors in upper stories, except Corridor Doors, and all doors in third and fourth stories, to be six panel \% in. thick, and double face doors. — Flat raised panel and chamfered stiles and rails, (no moulding,) all to be 8 feet six inches high. All doors opening on Corridors in first and second stories of West Wing, and second story of East Wing, to be 8 feet 6 inches high, made in the fol- lowing manner. Two doors to be separately made six panel i % inch thick flat raised panels chamfered stiles and rails. — One face of each door to be finished. These will be screwed to a frame one inch thick forming a double door with hol- low space between, as per detail^all to be hung to open Interior Doors. outward into Corridor. — All doors opening on Corridor, and all communi- cating doors in East Wing first story, to be glazed doors made folding, hung with pivots, to open both ways, and have springs to keep them closed. Architrave of doors to be 3 X inch moulding and i J^ inch band or their equivalent — no plinths — jambs cased and rebated. Outside doors of base- ment to be 2X inches thick, panelled, moulded or chamfered, as may be required on outside face, bead and butt on the back. Front entrance doors of first story, panelled, moulded and chamfered, as per elevation and details, 2^ inches thick, bead and butt on back. Vesti- bule doors and interior sidelight doors \% inches thick double face, top panel glass, and side lights of interior corridor doors to be double hung, SPECIFICATIONS. 11/ transom centre sash stationary. Wood for doors to be cut and put together immediately after contract is signed, and to be thoroughly dry and seasoned before going in the buildine. Flooring also to be purchased as soon as possible after signing of con- tract, that it maybe stacked for seasoning before being used in the building. Front and vestibule doors, first iitory to be of walnut, also basement east and west and rear entrance doors ; all others to be of white pine, clean stuff. A rostrum to be constructed in chapel, as per plan — the desk to have chamfered stiles and rails, raised panels, moulded cap and base, as per de- tail drawings to be furnished. Stairs, dr'c. Private stairs at rear of Trustees' room, fi.rst to second Private stairs. story to be I ^4^ inches thick yellow pine treads — i inch white pine risers, tongued, glued and blocked. Rail 4^^ inches walnut — balusters 2-'{. inches maple — newells 8 inches walnut — stairs to cellar in the usual manner. Two flights of plain stairs from basement to first story, at east Basement stairs. and west parts of building. Yellow pine i X inch treads, i inch white pine risers, yellow pine 3 inch rail and standards. One flight from third to fourth floors, steps yellow pine i j^ inch, risers i inch white pine. Skirting to correspond with washboard of third story. Lecture room stairs to be same style as private stairs. To be 4j^ inch walnut moulded rail, to main iron stairs. Skylights. Two skylights to be constructed as per plan and details. Water closets to be fitted up in the basement, with Water closets. hinged seats. Partitions i^i inch capped, 7 feet high, doors i J4 inch, pan- elled 5 feet, 6 inches high. Water closets in first and second stories and basement, where marked on plan, to be neatly fitted up with seats and risers, and hinged lids. Wash- stands neat panelled doors, sub, &c. Reservoirs to be 2 inches thick plank firmly put together, and properly fitted to receive lead lining. All finished with walnut. Umbrella stands in first story, hall and in basement where marked on the plans, to be fitted up as directed, to be lined with zinc. Roofs, cornices, and dormer windows to be constructed Roofs, and finished, as per elevations and details to be furnished. Ornamental corners of roof cornice, may be of galvanized iron, instead of w^ood. Centres for arches, blocks, plugs, scantling, &c., which are to be built in walls, to be furnished at the proper times and places, and all necessary fit- ting and handling to be done by the carpenter. Ironwork. Wrought and cast iron, blacksmithing, &c. One girder composed of three beams 7 inches high, (55 Beams, lbs. per yard,) to support gable over western rear bay window. Eight girders each composed of two beams loyi inches high, (105 lbs. per yard,) these support stairs and floor corridor at head of stairways. 1 1 8 SPECIFICATIONS. Twenty-four girders, each composed of two beams 12 inches high, (125 lbs. per yard.) Each girder to have curved brace from wall, made of two angle irons 5 by 3 inches by ^ inch ; foot to rest on large stone, and head securely bolted to bottom flanges of beams, spandril to be decorated with cast-iron ornament. These girders are to support the floors in large east and west rooms, first, second, and third stories, tivo girders in each room, and the beams are to be securely bolted together with a piece of white pine timber, 3 by 12 in. blocked between them — and cast iron separators. Six girders each composed of two beams io>^ inches high, (105 lbs. per yard,) for assembly floor and library floor and ceiling, running east and west of three spans supported on cast-iron columns. All girders composed of two or more beams to be bolted together with cast-iron separators, and ends strapped together and anchored into walls, and resting on iron plates. Beams for first floor over furnace room, to be 10^ inches high, 105 lbs. to be placed not more than 3 feet 9 inches from centre to centre. Beams of assembly floor and library floor and ceiling to be 9 inches high, 70 lbs. to be placed not more than 3 feet 9 inches from centre to centre. All beams to be properly strapped together and anc?iored in walls where required. Stirrups to be provided for hanging joist trimmers, &c.. Stirrups, where required. One set of spiral stairs, from basement to first floor, treads ^ inch ribbed, risers X ii^ch close, supported on centre staff and ends built in walls. Two sets of stairs of three flights each from basement to Principal stairs. third floor as per plan. Treads ^ inch to be covered with slate treads, risers }i inch close lattice, panelled or ornament, as per detail, all to be supported on three strong wrought-iron bars and cast-iron carriages — ends built in waJl. Newells at starting in basement 10 inches, and in first Newells. story 14 inches, of Gothic pattern. Balusters, ornamental Balusters, castings to be selected. The upper step of each flight and its nosings, to continue around the landings to receive railing, which must be secured to them as to the steps. Facings of the well hole must be of iron extending down to receive the plaster of ceiling below. Arranged for walnut hand- rail, to be three feet high when all is finished. Gratings of iron bars to be leaded in flag-stone cappings of all area walls — to have folding gates at all windows. Cast iron columns where marked on the plans. Columns. Four columns 9 in. diameter, ^ in. thickness of metal in cellar, to have four base plates 2 ft. by 2 ft. by i X inch thick. Four columns 9 in. diameter in basement ^ in. thickness of metal. Four columns 8 in. diameter )( in. thickness of metal in first story. Four columns 7 in. diameter }4 in. thickness of metal in second story_ Four columns 6 in. diameter }4 in. thickness of metal in third story. SPECIFICATIONS. I I9 These rest on each other, and must be made with saddle heads and the girders to go through them. Two columns 10 in. diameter }^ in. thickness of metal for front hall un- der chapel, to have base plates i ft. 3 in. by i ft. 3 in. and i in. thick. Four box posts 6 in. by i ft. 6 in. and yi in. thickness of metal, to have bracketed skew back heads for brick arches of corridor walls, base plates to be I ft. 6 in. by i ft. 6 in. and i in. thick. All columns to have moulded caps, as per detail to be furnished, to be in proper proportion with their respective lengths. All bolts, jambscrcws, stirrups, clamps, anchors, (S:c., necessary for a complete and substantial job, to be furnished, if not specially mentioned. Cast-iron cresting, pattern selected for bay windows. Crcstings. Cast-iron railing or cresting, to be set on roof as per elevation and detail drawings. Three set of inside and outside doors for fire proof. In- Fire proof doors. side doors folding — outside single doors — with wrought-iron frames to be set complete. Usual fire proof locks and fastenings, ($25 lock.) The con- tractor for ironwork must build and set up and take down his scaffold ; car- penter must furnish all the material for making it. Two base plates 12 in. by 12 in. by i in, and two plates Plates. I ft. 6 in. by 3 ft, by i in. Six columns 4 in. diameter. Two 8 in. beams, (65 lbs. per yard,) and six beams 6 in., (40 lbs. per yard.) Two of these to be bolted together with separators. These are to support the arches of boiler room and rear wall. One Hyatt Vault Light 3 ft. diameter over boiler room to be furnished and set. Hardware. All doors that are made double as described, to be hung Butts, &c. ■with 7 in. Baldwin's Patent, or American butts equally as good. Heavy mortise brass works latch 3^ in. by 4^ in. box, with brass knob. All doors of eastern wing first story, which are made folding, to be hung with pivots and have suitable springs and fastenings. Dead-latches to be furnished to all the doors required at Dead-latches. $ per lock, to be hereafter selected — not included in contract. Outside front doors, main entrance, to have top and bottom flush bolts, heavy wrought polished face ; top bolt long enough to be easily reached. Bottom bolt 12 in. ; lock mortise rebate — Russell & Erwin's make, 8 in. box and bronze knobs. Doors to be hung with three pairs 6 in. by 6 in. fancy imitation bronze butts. All basement and interior doors of upper stories to have brass or bronze knobs ; iron butts sufficiently large to swing door clear of architraves or finishings ; and to have suitable brass works locks. Vestibule door en- trance to have butts 6 in., top and bottom bolts to be all the same as front door, except vestibule latch instead of lock. All windows to Cotton cord. I20 SPECIFICATIONS. be double hung with best cotton sash cord, suitable thickness for the differ- ent size of windows. The best pulleys with brass journals to be used. Weights to be of cast-iron. All windows to have two iron sash lifts each, and a sunk eye in top rail of top sash. Strong sash fasteners of approved construction to base- Sash fasteners, ment and first story windows throughout. Phimbing: Four-inch cast-iron proved pipes, with leaded joints, for draining water from roof, to run up to tops of French Roofs inside of Roof Conductors. Rafters, and be provided with Y branches, to connect with main Cornice Gutters ; below these, pipes to be built in wall, all to connect with 6 in. Terra Cotta Drain Pipe below floor of Basement, to connect with main centre lo in. to centre of Building, and thence 12 in. Terra Drain Pipe. Cotta Drain Pipe to run 10 ft. outside of Building. Two additional 4 in. iron pipes to be used for Water Closets in Basement, First and Second Stories ; one 3 in. pipe for draining water from porch, and one 3 in. pipe from each of the Bay Windows. A 3 in. Cast Iron Water Pipe from 10 feet outside of Building at West End ; to branch off 3 in. cast-iron pipe to 3 ft. above Third Water Pipe- Floor, at each end at line of Water Closets with outlet at each story, and 2 in. pipe to extend to rear of Boiler Room in Cellar, to have fire hose at- tachments, two in each story and one in Cellar, with large brass cock screw nozzle, suitable for 2 in. hose. Two Water Closets in Basement, three in First story, and two in Second story where marked on plans, to be the best Valve Closets, Water Closets. to be hereafter selected by the Committee or their Architect. All to have hinged seats, to use as urinals, to be lined with soft Medal- lion Metal or 5 lb. lead, to be determined — ^dressed closely Tank, against the under seat, and to extend % in. under the hole — supplied with )i in. lead connection with each Water Closet. Each Water Closet in the Second story to be supplied Tanks, with 5 lb. lead-lined reservoir or boiler-iron tank, each tank to contain 50 gallons. A wash basin in each Dressing Room, 14 in. China basin — Craigie's com- bined basin trap and plug to be used, countersunk marble top 20 in. by 30 inch., and back and moulded edge. Silver plated cock and plugs; supply, yi inch lead pipe for cold water, i X inch lead waste pipe from basins to run into soil pipe of Water Closets. Twelve Water Closets in Front Base- ment to be self-acting, (Carr's patent,) Hopper Valve Closets and seats combined, to be secured to Flag Stone, each to be trapped separately and drawn into 8 in. drain pipe connecting with main drain ; supply pipe i in. lead. One Enamelled Basin Stand and Frame, Cold Water supply % in., waste iX in. lead pipe, brass cock, in each water closet room in basement, four in all. Umbrella Stands to be lined with zinc and to have 1% in. SPECIFICATIONS. I 2 I waste. A 3 in. stopcock to be put on Main outside of Building, and a 2 in. stopcock to each supply main that runs up to third story, and a ?^ in. stop and waste on all other supply pipes. — Yz in. supplies to be 2Yz lbs. per foot, )^ to be 3 lbs., and i in. to be 4-3 lbs. per foot, waste \]i in. to be 2j< lbs., and i>< in. to be 3)^ lbs. per foot. Provision to be made for the introduction of additional supply and waste pipes, sinks, cocks, &c., which will be hereafter specified and separate con- tract made for the same. Gas. Gas Pipes for lighting the Building to be introduced according to regula- tions of City Gas Works, allowance to be made for about 450 burners. All outlets to be in Ceiling, except in Chapel, which are to have side outlets. Rooms measuring about 30 by 45 feet and 50 ft. to have four outlets — those measuring about 24 ft. by 34 ft. to have two outlets, smaller rooms one outlet. Corridors to have five outlets each, all other rooms and passages as maybe directed. Arranged for one or more burners as may be desired. No fixtures to be included. Additional Pipes and Outlets to be provided for such rooms as may be directed, and allowance made for burners, a detailed statement to be hereafter furnished. Plastering. All Walls to be finished from the float, rough-cast finish. Entrance Hall, Assembly, Stairs and Corridors, of the first and second stories, to be lined off in blocks ; all to be tinted in mortar of light drab color. All Ceilings to be strictly three-coat work, first coat to be dry before being followed up, (two coats of Brown, and one of White Hard Finish.) Plasterer must fur- nish, put up and take down his own scaffold. Skirting on stairs to be of Cement. Front Vestibule and Entrance Hall to have a neat cornice. All Corners to be chamfered not otherwise specified or directed. Painting and Glazing. All outside woodwork or ironwork to be painted three coats pure white lead and linseed oil in such tints as may be directed. Outside doors of Basement and First Story to be varnished and oiled. All Interior Wood- work usual to paint, to be varnished three coats. St'les of doors to be stained slightly darker than panels, mouldings of wainscoting, &c., also to be stained darker if required. Inside Shutters same style. Rafters in Chapel to be varnished. Ironwork to be painted three coats. All Glass to be first quality American Double Thick for large, and single thick for small lights, to be well bedded, bradded and back puttied. Windows of Water Closet Rooms in Basement to have ground glass. Chapel and Stairway windows to have double thick American glass. One Communicating Door East Wing First Story, where directed, to have one large light, French Polished Plate Glass. Skylights to have rough plate glass Y in. thick. 122 SPECIFICATIONS. « Heating, The Contractor for Heating and ventilating the Building must furnish all the materials and work required of the best quality. The heating to be done by a low pressure steam apparatus, consisting of Boilers. Three Boilers, located in the apartment provided, any two of which Boilers will be of capacity and form equal to heating the entire Building in the coldest weather. To be connected with as many coils, located in the cellar and Basement, as are required for the purpose ; which must be connected with boilers by proper flow and return pipes. These coils must be placed in proper cham- bers constructed with brick walls, into the bottom of which must be ad- mitted from cold air shafts from the top of the Build- Hot Air Chambers, ing, the necessary quantity of pure fresh air to supply at all times the full amount required for heating and ventilating the Building. In these cold air flues, proper valves or registers to control and regulate the amount of air to be admitted into the above chambers to be provided. Connections with distant flues from cold air shafts, to be made with 20 and 24 in. Terra Cotta Drain Pipe as per plan, and as may be directed. A suitable arrangement of coils in the rooms to be heated, to be used as an auxiliary to the fore-mentioned heated-air arrangement. All large Rooms in ist, 2d, and 3d Stories to have one or more such Radiators. The coils must have around them suitable ornamented screens, support- ing a marble slab 1% inch thick. Their flow and return pipes must be so carried as to be concealed from view. — All Coils must be on the window side and where directed. The Contractor must guarantee that the rooms can be kept at a temperature of 70*^, and the corridor 60*^, when the ther- mometer stands at 20*^ outside. — The Entire Basement Temperature, and the Halls and Corridors of the upper stories, to be heated by di- rect radiation.-- All the rooms above the Basement to be heated half by direct radiation, and half by the heated Air from the hot-air chambers above mentioned ; pipes and coils to be so constructed as to prevent any snapping and cracking noise. One low grate to be set in private Grate. room, adjoining dressing room in West Wing where marked on the plans, to be No. yYz Black Grate; and one Marble Mantel fur- Mantel. nished and set by Contractor, to cost not less than $60. Slate hearth to be set, Ash-pit door also to be furnished and set. All Registers to be black japanned, to be furnished and set com- Registers, plete, to all hot air and ventilating flues, and of suitable style and size for the capacity of flues. Tinning, Slating, &^c. The upper flat roof, as per plan, and all the Gutters, Cornices, and Bat- tlement Walls and Ventilating flues, to be covered with best Tin- I cross M. F. charcoal tin, painted on both sides, the upper to have two coats. The Gutter tin to have three coats. All chimneys, battlements. SPECIFICATIONS. 1 23 and hips must be flushed, puttied and made perfectly water tight. The water to be taken oft" through 4 in. cast iron pipes, as before described in plumbing. Suitable Galvanised iron or copper Basket Strainers. strainers to be set in all outlets. Porch and Bay windows to be covered with tin. All the steep roofs to be laid with best Susquehanna Slate on felt. Roofs of corner dormers, centre building, to be red slate — red Slate. and green slate border in roof cornice of main building, as per elevation. Bells — Speaki?ig Tubes. Bell tubes to be inserted in Wall before plastering — number and position as directed. Speaking tubes also to be put in where required and have the proper mouthpieces. Lightning Rods. Of Iron with screw joints to be secured to the Building at sufftcient num- ber of points to thoroughly protect it, to be of suitable size and kind to be approved by the committee. Each rod to be provided with four points. Contractor to pay for all permits and make the attach- Permits, ment for water supply from the street main. Towers. The extension of towers of east and west ends, above the gables, to be constructed of Serpentine stone, as per elevations, with Ohio stone dress- ings and cornice, according to detail drawings to be furnished. Roofs to be hipped, covered with Susquehanna slate with red border at the top — the whole to be surmounted by railings and finials of iron. Window frames to be double hung with stationary transoms as per design. Floors to be laid about 3 ft, below each window, and rough stairways or stepladders for ascent to the same to be constructed. Should it be decided not to build the upper section of towers — the four gables are to be capped with stone, finished with iron finials and the inter- secting roofs to be covered with slate — the pinnacles or chimneys on the four corners of each to be of stone and terra cotta as directed. 124 SPECIFICATIONS. Railroad Specifications. For a Passenger Depot, See page 273. SPECIFICATIONS For a Passenger Depot for the Baltimore and Potomac Railroad Company, to be Erected at the Corner of B Street north, and Sixth Street east, in the City of Washington. These specifications are intended to embrace the entire superstructure above the foundations, with everything pertaining to it complete, and finished up ready for occupancy. The whole of the said building to be comprised within any contract or contracts whidi may be made for the same, excepting only the foundations before referred to, and certain items which will herein- after be particularly specified. The entire work is to be constructed and finished in every part in a good substantial and workmanlike manner, according to the accompanying draw- ings, and these specifications, to the full extent and meaning of the same, and to the entire satisfaction, approval and acceptance of the engineer and architect, and under the supervision and direction of such agent or agents as he may appoint. The following is a list of the drawings which accompany these specifica- tions, and which form part thereof: — No. I. Elevation on B street. Elevation on Sixth street. South elevation. West elevation. Plan of first story. 6. Plan of second story. 7. Plan of third story. Plan of roof. Plan of iron beams of first floor. Plan showing gas, steam and water pipes. Longitudinal section. Traverse section. No. 13. Details of cornice, &c., of main tower. No. 14. Details of tower over entrance on B street. No. 15. Details of main cornice. No. 16. Details of granite base. No. 17. '' '' '' " No. 2. No. 3- No. 4- No. 5- No. 6. No. 7. No. 8. No. 9- No. 10. No. II. No. 12. SPECIFICATIONS. 125 No. iS. Details of dressed stone work. No. 19. " '•' " No. 20. Details of stone work of balcony on B street. No. 21. Details of galvanized iron work. No. 22. " " " " "' of spire. No. 23. Details of dormer windows. No. 24. Details of trusses, girders, >Scc. No. 25. Sundry details. No. 26. Details of main skylight. Additional detail and working drawings will be furnished Additional draw- in exemplification of the foregoing, from time to time, as '"s^- they may be required; and, it is to be distinctly understood, that all such additional drawings shall be of equal force with those which are herein spe- cifically cited; and the said additional drawings are to be considered as vir- tually embraced within, and forming part of these specifications. It is also understood that the engineer and architect of Alterations, addi- the building shall have the right to make any alterations, "ons and omissions. additions, or omissions of work or materials herein specified, or shown on the drawings, during the progress of the building, that he may find to be necessary, and the same shall be acceded to by the contractor or contractors, and carried into effect without in any way violating or vitiating the contract, and the value of all such alterations, additions, or omissions shall be agreed upon in writing between the said engineer and architect and the contractor, before going into execution, or no allowance will be made for them by either party. Particular care must be taken by the contractor of all the Care of finished finished work, as the building progresses, such as exterior '^^'°'''^- projections, cut stone, stairs, washstands, &c., which work must be covered up, and thoroughly protected from injury or defacement during the erection and completion of the building. All the refuse material and rubbish that may accumulate Removal of rub- during the progress of the work, to be removed from time ^^''^' '^'^• to time, as may be directed by the engineer in charge, and on the comple- tion of the work, all the streets and ground must be thoroughly cleaned up, and the surplus material and rubbish carted away. The contractor is to assume all risks, and bear any loss occasioned by neglect or accident during the progress of the work, until the same shall have been completed and accepted by the engineer and architect. He is also to assume all blame or loss by reason of neglect of city or district ordi- nances, encroachments upon neighbors, or from any other cause. And it is to be distinctly understood that the engineer in charge of the work shall have full power, at any time during the progress of the same, to reject any materials he may deem unsuitable for the purpose for which they are in- tended, or which are not in strict conformity with the spirit of these specifi- cations. He shall ako have the power to cause any inferior o-r unsafe work to be taken down and altered at the cost of the contractor. 126 SPECIFICATIONS. These specifications are to be understood as not including Foundations not the foundations, and the stone masonry below the first I'^cluded. floor, all of which will be finished off to receive the dressed stone on the two street fronts, and to receive the floor beams on the other walls. Dressed Stone Work, The fronts on B and Sixth streets to have a base of first Granite base. quality granite, either from the Richmond or the Old Dominion quarries, of the heights, lengths ana sectional forms shown on the detail drawings. The beds of the lower course to be from 20 to 24 inches ; of the second course from 12 to 15 inches, and of the third course from 15 to 18 inches. The steps of the entrance door, and the check blocks of Steps. the same, also all the outside door sills, and steps to be made Door sills. of the same kind of granite as the base of the building. The rest of the dressed stone work, consisting of caps and Sandstone. bases of columns, sills, lintels, string courses, corbels, brackets, window dressings, and other features designated on the drawings, to be composed of Ohio sand stone, of good uniform color, without flaws^ spots or streaks. All the dressed stone work to be well and finely wrought, Beds and ends. and the beds and ends brought to perfectly plane surfaces. Mouldings, &c. so as to make close joints ; all mouldings, projections, ornamental caps and bases of columns to be finely and accurately cut, according to the drawings. Iron cramps and dowels to be used wherever necessary for Iron cramps, the stability of the work. The shafts of the columns at the doors of entrance on Polished columns. Sixth and on B street, and the shaft of the column under the balcony on B street to be made of Aberdeen granite, finely dressed and well polished. The base, string course and cap of each of the chimney Chimney tops. tops to be composed of Ohio sand stone, well cramped with galvanized iron. Brick Work. All the outside walls above the base course, and all inte- Bricks. rior walls designated on the plans, are to be built of good, sound, well-burnt bricks, laid true and straight, and properly bound together with heading courses. In the main fronts the headers are to be introduced behind the running bond, so as to tie the outside four inches to the rest of the wall, without appearing on the face. The mortar to be composed of the best quality lime, and clean sharp-gritted sand, properly mixed. Mortar, and thoroughly manipulated. The outside walls to be faced with the best pressed bricks Front Bricks. of uniform color, laid in colored mortar, with joints not exceeding one- eighth of an inch {yk^^) in thickness. Courses of encaustic tiles are to be inserted in the face of Encaustic Tiles. the walls on the two street fronts, wherever they are indicated on the plans. Encaustic tiles will also be used for flooring the general waiting-room, the SPECIFICATIONS. 12/ hall, the restaurant, and the water-closet rooms. The patterns, as well as the make of the tiles, to be decided on in all cases by the engineer and ar- chitect. Relieving arches to be turned over all openings that will Relieving Arches, admit of them. All the flues are to be well built and carefully pargetted. The first floor to be formed of brick arches, one brick Floor arches. (4^') thick, turned from wrought iron floor beams, and the haunches filled up with concrete, to the proper height for the tile, or the Concrete filling. wooden flooring, as the case may be. The mortar to be used in these arches, and in the concrete filling of the haunches, to be Cement. composed of hydraulic cement, and clean sharp-gritted sand. Iro7i Work. The first floor throughout the building, except in the boiler room, to be constructed on wrought iron floor beams, the various sizes. Floor beams, lengths and spacing of which are given on drawing No. 9. The bearings are to be slate, each of which must be eight by twelve Slate bearings. inches (8''^Xi2^^) and two inches (2^^) thick. The Main Tower. — The following portions of the main tower will be com- posed of galvanized iron, to wit : — The dormer windows on Galvanized iron. the four sides of the tower, including the cornices and the returns to meet the roof; also the angle corners and cornices of the roof of the tower. Cast iron will be used in this tower in the cornices of the Cast iron. second story, the balconies and the frieze, the columns, capitals, and bases of the windows of the third story, with the imposts, arches, cornices, and columns above them ; also in the plain faces back of the columns. The clock faces on the four sides of the tower, including the panel Clock faces. work on each side of the same, will likewise be composed of cast-iron ; the clock dials to be made separate, so as to admit of being removed. The railing of the balconies will be composed of wrought Railings. iron. Tower over Entrance on B Street, — In this portion of the Galvanized iron work galvanized iron will be used in the cornice and finial of the gable ; 2ir\.^ cast iron in the columns, capitals, bases, pilasters, sill Cast iron, and hood of the third story window, with the two adjacent corner columns, including their capitals and bases; also in the dressings of the circular window. Tower over Baggage Entrance. — The main cornices, modillions, and angle corners of the roof to be made of galvanised iron. Galvanized iron. The entrance to the baggage room to be spanned by a Boiler iron. boiler plate girder, supported by cast iron brackets. Cast iron. Octagonal Tower on B Street. — The main cornices, modillions, and angle corners of the roof to be made of galvanized iroti. Galvaiiized iron» 128 SPECIFICATIONS. Main Cortiices. — All the main cornices of the building, including the modillions and the frieze cornices, to be made of galva- Galvanized iron. nizediron ; also all the gutters, valleys, and flashings. Dormers. — The three dormer windows on the east front, the three on the north front, and the four on the west front, including all Galvanized iron. their parts, except the crests, to be made of galvanized iroji. The rear or south wall, to be capped with a galvanized iron coping. The corner columns of the said rear wall, as shown on drawings Nos. 2 and 3, to be made of cast-iron. The galvanized iron work to be supported by rough wooden Rough bracketing. brackets, to which the iron must be securely fastened. The whole to be well wrought, in conformity to the drawings, and put together in the most substantial manner, and in such a way as to prevent the admission of water in any of the joints, or in any of the connections with the other features of the work. The cresting and the finials of the towers, to be composed Cresting. of wrought iron, and all the rest of the cresting throughout the building to be made of cast iron. The iron work attached to the roof to be secured by wrought Wrought ir jn chairs iron chairs and stays, galvanized wherever they rest on the ^""^ ^^^y^- tin roofing. The screw heads to be covered with tin caps, soldered to the roof, to prevent leakage. The two columns in the restaurant, the two over them in iron columns, the second story, and the two in the third story to be composed oicast iron. Iron girders, each consisting of two 12-inch I beams of 150 Iron girders. lbs. to the yard, to be placed on these columns. All cramps, ties, tension bars, truss rods, bolts, stirrups. Miscellaneous. bars and other iron work required in the various parts of the building, to be furnished of the first quality wrought iron, and made in the best manner, subject to the directions and approval of the engineer in charge; it being understood by the parties to the contract that such bolts, bars, cramps, stirrups, &c., are to be introduced at the discretion of the said engineer in charge, wherever he may deem it to be necessary to assure the strength and permanency of the building. All the castings required in the execution of the woik, whether herein particularly specified or not, to be made from good tough iron, true and sound, and free from cracks, flaws, bubbles, or defects of any kind whatever. All the galvanized iron used in the building, to be of the best quality, designated as No. 28. Lumber and Carpenters' Work, All the lumber throughout the building, except where Lumber. particularly specified to the contrary, to be first quality white pine, free from shakes and flaws and unsound knots, thoroughly seasoned, and in every way suitable for the various purposes for which it is intended. SPECIFICATIONS. 1 29 All joists of 20 feet or more span, arc to be four by twelve Joists. (4^^X12^') white pine, and wherever the span is less than 20 feet, three by- twelve (3^^Xi-^') joists are to be used. The ceiling joists of the attic story may be three by eight (3'^X8^^) hemlock. The rule for spacing the joists throughout the building shall be sixteen inches (16'') from centre to centre. Each joist must be properly backed, and have a bearing of four inches (4'") at each end, on the walls and partitions. In all cases where joists are supported by girders, they must lap each other, so that each joist shall have a bearing equal to the whole width of the girder. All floors of joists of more than sixteen feet (16^) span, Brid-ing. shall be stiffened by two rows of cross bridging, and in cases where the span is sixteen feet, or less, with one row. Flues and other openings are to be framed around with Trimmers, double trimmers, in all cases where there are more than one tail joist. Par- ticular attention must be paid to keeping all woodwork sufficiently far from the flues to insure absolute safety from fire. The wooden partitions throughout the building are to be Partitions. made of good white pine scantling, spaced sixteen inches (16^^) from centre to centre, securely attached to the floors and ceilings, and stiffened with two rows of horizontal bridging. The partitions of the first and second stories are to be composed of 3^^X6^^ scantling, and those of the third story of 3^^X4^^7 with the following exceptions, to wit: those occurring in the second story, between C and C, on plan No. 6, will be made of scantling 3^''X8''' ; those in the third story marked K and K, on plan No. 7, and the backs of all water closets in the building will be made of scantling 3^^XS^''. In all cases throughout the building, the broad side of the timber is to be placed cross-wise of the partitions. The outside walls to be furred with three by six (3^^X6^^) Furring. scantling, secured to horizontal strips built in the walls as the work pro- gresses. All the window frames in the building to be made reveal, of sound, well seascned white pine lumber, fitted with all the necessary Windows, pulley styles, boxes, pockets, parting strips, beads, &c., in accordance with drawings. Dormer windows to be made on the roof, as shown on Dormers, the drawings ; the fronts and the sides will be composed of galvanized iron, to which wooden frames, with all the necessary boxing and interior finish will be attached. The iron work is provided for under the head of that material. All the windows in the building to have inside shutters, Shutters. one and one-eighth inches (i>^^^) thick, cut at the meeting rail, and made with moveable sloats. Those of the first and second stories on the two street fronts to be composed of walnut, and all the rest of white pine. I 130 SPECIFICATIONS. The finish around the windows to consist of a two and a half inch {2%^^) corner bead in the first and second stories, and one and a half inch (ij^^^) bead in the third story. All the windows to have plastered jambs, and interior window sills, sills of hard wood, one and a half inches {i)4^^) thick, finished with nosed edges and moulding, returned on the ends. The sash to be composed of first quality white pine, one Sash, and three-quarter inches (i^^^) thick, made in accordance with the draw- ings. The upper sash of the bay window, the sash of the baggage room, and the upper sash of the window above it, also the upper sash of the win- dows in the second story of the tower, and the sash above the transoms of all the windows of the principal story throughout the building, to be hung on hinges. All the rest of the windows in the building to be double hung on strong axle pulleys, with the best patent cord, and finished as shown on the several drawings. The outside doors to be two and a half inches (2 J^^^) thick. Doors, made of two thicknesses of one and a quarter inches (iX^^) each, panelled on both sides. The inner doors to be one and three-quarter inches (i^^"') thick, except- ing the door in the attic, the thickness of which will be one and a quarter inches (iX^)- The water closets to have short slat doors hung twelve inches (12^'') above the floor. All the rest of the inner doors to be panelled on both sides. The three doors leading from the general waiting room to Fly doors. the passenger platforms to be covered on both sides with leather, and hang on the most approved spring hinges, opening both ways (in and out). The two outside doors of the baggage room to be hung j^oors of baggage on eight inch (8''^) cast iron sheaves with wire rope and '^°°™' weights to move up and down, as shown on drawing No. 25. All the doors throughout the building to be made of the best white pine, mortised tenoned and glued up and wedged in the best manner, moulded on both sides, hung on the most approved strong butt hinges, and fur- nished with locks, bolts, &c., complete, as provided under the head of hardware. The doors throughout the first and second story, except Transom lights. those leading to the water closet rooms, to have segmental heads, and tran- som lights, with moveable sash hung on swivels and opened by cords and pulleys. The doors of the attic story will have square heads without transom lights. The architraves around all the doors of the first and Architraves. second stories to be not less than five inches (5^^), and those of the attic story not less than three and a half inches {3/4^'') v/ide. In constructing the wooden partitions, double studs are to be placed each side of all the openings. SPECIFICATIONS. I3I A baggage elevator to be constructed in the baggage room, lifting from the first to the second story, and a gallery to be made around Elevator. the said room, with permanent steps leading from the first floor to the gal- lery, and from the gallery to the room above ; all of which is to be executed in conformity to the plans. Closets to be fitted up throughout the building, with shelv- Closets. ing averaging one foot in width, and with strips three and a half inches {3^2'^) wide, and one inch thick, provided with first quality Shelving, hat and coat hooks ; and all the necessary shelving, drawers, wall strips, &;c., to be provided and put up in the pantries. A panelled counter to be made across the entire width of Counter in the restaurant, with a desk on one end, as shown on plan ^'e^'^^^rant. No. 5, and a marble top of twenty-six inches {26^^) in Marble top. width, and one and a half inches (i>^'^) in thickness, made in four lengths, and moulded on the outer edge. The three v/aiting rooms on the first floor, and the gallery Wainscoting, of the second floor, over the general v\^aiting-room, to be wainscoted with the best white pine, to the height of the sills of the windows, according to the designs and dimensions indicated on drawings Nos. 11 and 12. The baggage-room will be finished with yellow pine wainscoting four feet (4^') high, tongued and grooved. All the rooms having wooden floors to have wash-boards Washboards, tongued into sub-plinths one and a half inches (i>2^^) thick, and 2}i inches {2)4^^) high, screwed into the floors. The washboards in the rooms that are tiled are to have no plinths. All the washboards throughout the build- ing to be moulded on top ; those of the first story to be ten inches (10^^) high, of the second story nine inches (9^^), and of the attic eight inches (8^^), all of w'hich are to be made as shown on the drawings. The stairways to be constructed on three by twelve (3^^X Stairways. 12'') white pine horses, with all the necessary framing secured to the floors and partitions. The steps to consist of one and a half inch {i%") yellow pine step boards, and one inch ( i^^) white pine risers, glued and blocked together, nosed and finished with scotia, and fillet returned on the ends. The main stairway to start from an ornamental newel Main stairway. twelve inches (12^'') in diameter, as shown on drawing No. Newel. 25, and to have a moulded walnut rail four inches (4^^) thick Handrail, by seven inches (7^'') wide, supported by two and three-quarter inch {2^,i") octagonal walnut balusters, with turned mouldings Balusters, and square plinths ; two balusters to be placed on each straight step, and one on each winder. A skylight to be constructed in the roof, over the main skylight over stairway, four feet (4') wide by eight feet (8^) long, covered stau-way. with Enghsh rolled glass three-eighths of an inch W) thick, permanently laid, so as to effectually exclude the weather. 132 SPECIFICATIONS. A sash four feet (4^ wide and eight feet (8') long, with Sash. semicircular ends, to be constructed below the exterior skylight, and glazed with ornamental glass. A plain light stairway, with newel and railing to be made stairway to from the third story of the tower to the clock-room. clock-room. All the floors of \\iQ first and second stories to be composed Floors. of first quality southern heart pine boards one and a quarter inches (iX'O thick, in widths not exceeding six inches {d"). The whole to be free from sap, unsound knots, and shakes, and to be tongued and grooved, well planed on top, and securely secret nailed to the joists. The floors above the second story may be laid with yellow pine boards of one inch (i'') in thick- ness, tongued and grooved, and laid in the usual manner. There will be no wooden floors in the general waiting room, the hall, the restaurant, and the water-closet rooms, as these apartments are all to be tiled. The wooden floors of the principal story will be laid on scantling, imbedded in the concrete in the haunches of the arches. All the floors in the building to be planed, and left clean and perfect on the completion of the work. Permanent seats are to be constructed around the sides Seats, of the general waiting room, as shown on the drawings. The bottoms are to be composed of hard wood, supported on turned legs, placed not more than six feet (6^) apart. The seats to be divided by wrought iron arms of the Pennsylvania Railroad Company's pattern, spaced twenty inches (20") from centre to centre. The roof to be supported by nine principal trusses to ex- Roof trusses. tend across the building from north to south, and to be spaced as shown on plan No. 8. The two trusses which rest on the tower to be shorter than the rest, and the one coming under the spire to be longer, as will appear from the drawing referred to. Three short trusses will be required to span from the westernmost principal truss to the west wall ; the sizes, arrange- ment, and details of these are shown on drawings Nos. 8 and 24, which must be closely followed in the construction. The frame work of the tower and the spires to be con- Anchor bolts, structed as represented on the drawings, and securely anchored to the walls. The towe-r to have eight vertical anchor bolt, each, one and a quarter inches {i}(^^) in diameter, to extend from the top of the belting course next below the clock face to the wall plate, secured at the bottom by wrought iron anchor plates, each three feet (3^) long, three Anchor plates, inches (3^^) wide, and one inch (i^^) thick. The spires to be anchored to the walls in the same way, byy2??/^ anchor bolts in each spire, one inch (i''^) in diameter, and eight feet (8^) in length, secured by wrought-iron anchor plates, each two feet {2^) long, three inches (3^^) wide, and one inch (i^) thick. The portions of the four principal roof trusses, which are exposed above the general waiting-room, to be dressed and chamfered, as indicated on the drawings. SPECIFICATION'S. 1 33 A girder to be placed across the opening from A to A, Girders. on plan No. 6, to carry the floor joists. This girder is to consist of two thicknesses of timber, each six by twelve inches (6'^Xi2^^), placed one inch apart, and securely bolted together with threc-c|uarter {}(^^) combina- tion bolts, keyed with white oak, and supported at two points by rods from a trussed girder placed over the same opening in the story above, and which is also designed to carry two of the principal roof trusses. Girders are to be placed at B B and B' B', on plan No. 5, to carry the floor joists. These girders are to be supported by a rod from each principal roof truss where it crosses them above, and are each to consist of two pieces of v/hite pine, four by twelve inches (4"Xi2^^) bolted together with three-quarter inch [H^^) combination bolts, and keyed with white oak. The floor of the clock-room in the main tower to be Clock-room door. strengthened by two transverse trussed girders. The sheathing of the roof to consist of the best quality Sheathing, white pine sheathing boards, one inch (i^^) thick, planed on one side, and well nailed to the rafters or purlins. The contractor is to provide and fix all rough bracketing. Rough bracketing. and other carpentry necessary to form the projecting eaves, and all other portions of the iron work in which w^ooden bracketing may be required, the designs for which are shown on the drawings. Also, all the bracketing and furring necessary for the proper execution in stucco, of the cornices and panelled ceilings. He is also to furnish and provide all the Scaffolding, S:c. requisite scaffolding, centering, cradling, furring, beads, fillets, blocks to support bracketing, lintels, strips, and all other articles connected with car- pentering, which may be necessary for the proper construction and com- pletion of the work. The following portions of the general waiting-room, and Ornamental wood the hall above it, will be executed of wood, to wit : the ^^°'''^' corbels, brackets, columns, capitals, and bases, the pendants, pedestals, railings, and the cornices under the galleries, all of which will be made of white pine, and finished according to the full intent and meaning of the drawings. All the carpenters' work throughout the building to be Miscellaneous, executed according to these specifications, and the drawings hereinbefore referred to, and such additional drawings as may hereafter be made in ex- emplification of the same ; and all carpentry not herein mentioned, and which may be necessary for the complete and proper execution of the work to be faithfully done and furnished. Plastering. All the rooms, halls, stairways, and all other portions Rooms to be pias- of the interior of the /irst and second stories of the build- '"'^^■ ing ; also six of the rooms in the third or attic story, with the stairway in connection with the same, and the clock room in the tower, to be well 134 SPECIFICATIONS. plastered in three coats. The ceilings to be floated, set, Ceilings, and finished with a white coat. The walls and sides of all Walls. the rooms to be finished with the float, and tinted as may Tinting. be directed by the engineer in charge. The remaining Rooms not to be rooms of the third story are not to be plastered. plastered. All the rooms in the first and second stories to have Stucco cornices, stucco cornices, made in conformity to the designs indicated on the draw- ings. The materials to be of the best quality, and the work to be executed in a good and workmanlike manner. Whatever jobbing and repairing may be necessary, to Jobbing. render the building perfect before its final acceptance by the engineer and architect is to be well and truly done without extra charge. Plumbing. Three of the best water-closets to be put up in the ladies' Water closets. private room, eight in the gentlemen's private room, six in the water-closet room of the second story, and one in the attic. Each closet to have a " Monitor container," a porcelain bowl, a bronze pull, and a four inch trap made of lead, weighing 5 lbs. to the foot, dischargmg into eight inch (8^^) cast-iron mains leading into an underground terra cotta drainage. Six large size porcelain urinals to be put up in the gen- Urinals, tlemen's private room, and two in the water-closet room of the second story. Each urinal to have a three-quarter inch (^'0 brass supply, and a five eighths of an inch {Y^") stop cock with a cap on top, and a one and a half inch (i>^'0 waste pipe. All the water closets and urinals to be furnished with the Traps, &c. necessary traps and fixtures to insure certain action, and to promote clean- liness. The backs and floors of the urinals to be composed of slate, and to be five feet (5'') high from the floor. The sides are to be made of wood. A soapstone sink, four feet (4') long, twenty inches (20") Kitchen sink. wide, and six inches (6'') deep, to be placed in the kitchen, with hot and cold water cocks and the necessary drain pipes ; also a large sized plate drainer. Three permanent washstands to be put up in the ladies' Washstands. private room, six in the gentlemen's private room, and two in the water- closet room of the second story, all of which are to have one and a half inch {^Yz") marble countersunk tops and backs, and fourteen inch {i\") porcelain bowls, with plated cocks, plugs and chains, and the necessary waste pipes. Each branch of the supply pipes to have a separate stop Stop cocks. and waste cock. All the supply pipes to be extra heavy, and all the work to be done in the best and most substantial manner. The water to be carried from the roof by means of cast- Roof conductors. SPECIFICATIONS. 1 35 iron pipes four inches (4") in diameter, securely caulked with lead. The said pipes to be cither built in the walls as the work progresses, or carried down in recesses left in the brick work for the purpose, as may hereafter be directed. Each conductor to have a cast-iron elbow at the Elbows, foot, from which the water is to be conveyed to the sewer by means of terra cotta drain pipes of twelve inches (12^') in diameter. The Terra coua drain location of the drain pipes is indicated on drawing No. 10. p'P'^s- The plumber is to provide and lay all the terra cotta pipes, and to com- plete the drainage to the entrance of the sewer. All the stop cocks, draw cocks, traps, waste pipes, and iMisceiianeous. other articles in connection with the plumbing, which may be necessary to a creditable and proper completion of the building, to be provided as may be directed by the engineer in charge of the work. Gas Pipes and Fitting. Gas pipes to be furnished and laid throughout the building, of sufficient size to supply the annexed list of burners, in conformity to the rules and regulations of the Philadelphia Gas Company. All the pipes to be laid so as to be easily got at for repairs, and to have such descents as will prevent the accumulation of water arising from con- densation. The pipes to supply the lights on the outside of the building to be sep- arate from the general supply pipe, so as to admit of their being used inde- pendently of each other. It is understood that the gas fixtures are not to be fur- ^•'^^ fixtures not to . , , , , . ^ , . 1 ^ - be furnished by nished by the party contracting lor the gas pipe and fitting, contractor. The following is a list of the gas burners required throughout the build- ing, the aggregate number being 313 : — In general waiting-room, 5 reflectors, each 8 lights. In gentlemen's waiting-room, 2 reflectors, each 8 lights, and 4 brackets, each 2 lights. In ladies' waiting-room, 2 reflectors, each 8 lights. In restaurant, 4 reflectors, each 12 lights, and 8 brackets, each 2 lights. In office of depot master, i pendant of 2 lights, and 2 brackets, each i light. In gentlemen's water-closet-room, i reflector of 6 lights. In ladies' water-closet-room, i pendant of 4 lights. In baggage-room, i pendant of 4 lights. In ticket office, i pendant of 2 lights, and 2 brackets, each i light. In boiler room, i bracket of i light. In pantry, I bracket of 2 lights. In store pantry, i pendant of 2 lights. In kitchen, 2 pendants, each 2 lights. In back hall, i pendant of 2 lights. 136 SPECIFICATIONS. In 9 offices, second story, each i pendant of 2 lights, and 2 brackets^ each I light. In 4 offices, second story, each i pendant of 4 lights, and 2 bracketSy, each I light. In telegraph office, second story, i pendant of 4 lights, and 4 brackets,, each I light. In 4 rooms, second story, each i pendant of 2 lights. In gallery of second story, 12 brackets, each 2 lights. In 3 rooms in attic, each i pendant of 2 lights. In 3 bed-rooms in attic, each i pendant of 2 lights. On newel, i candelabra of 4 lights. On front steps, 4 candelabras, each 5 lights. Painting and Glazing. All the exposed wood and iron work, inside and outside, usually painted in such buildings, to have thr'ee coats of pure white lead and linseed oily grained as may hereafter be directed. All the exterior cor- Graining, nices, balconies, iron columns, capitals and bases, and all other exterior iron work to be primed with red lead and linseed oil, painted with three ad- ditional coats, consisting of white lead and linseed oil, and Sanding. sanded in two coats, in the best manner, in imitation of the Ohio sand stone used in the building, excepting the cresting and the balcony railings,, all of which will be painted with French blue, and tipped Gilding, with the best gold leaf. All the windows and transom lights throughout the build- Glass, ing to be glazed with the best American glass, well bedded, bradded and back puttied, and left clean and perfect on the completion of the work. The skylights in the roof to be made as shown on the sev- Skyhghts. eral drawings, and glazed with English rolled glass three-eighths of an inch (^' ) thick, laid in such a manner as to render them permanent, durable, and perfectly weather proof. The number, dimensions and form of all the lights of glass throughout the building to be ascertained from the drawings. Hardware, The outside doors of the waiting rooms to have extra Latches, heavy bronzed store latches, such as are used by the Pennsylvania Railroad Company. The doors of the ticket office, the baggage-room, the restaur- ant and the telegraph office to have three-tumbler mortise night latches^ with knobs only on the inside. The doors leading from the waiting-rooms to the water-closet rooms to have mortise latches two and a quarter by three and a quarter inches (2X^'X3X) ^^'^ porcelain furniture. The water closets to have rim latches and mineral furniture. The remaining doors throughout the building to have six Locks. inch (6'') tumbler locks, with bronze furniture for Xho. first story, white por- SPECIFICATIONS. 1 ^^ celain furniture for the second story, and mineral furniture for the third story. The windows of the ladies' private room to have orna- Wire screens, mental wove wire screens. All the double doors to have strong spring bolts, top and Spring bolts, bottom. Two clothes hooks of approved design will be re- Clothes hooks. quired in each water-closet; also, such hat and coat hooks in the closets throughout the building as the engineer in charge may direct. Heavy cast-iron butt hinges will be required for all the Hinges, doors. The inside shutters are to be hung on cast butts, and to have strong bronze shutter hooks and knobs. All the windows of the first story to have heavy bronze sash-fasteners. All the hardware required in the building to be furnished of the most sub- stantial and approved kind. Tin Work, The portions of the roof inside of the lines of cresting; Roof. also, the tops of the dormer windows, and the roofs of the kitchen and boiler-room, to be covered with first quality I.C. charcoal tin, Melyn brand, laid with cleat or lapped joints. The whole to be painted on the underside with one coat of metallic paint, and on top with two coats of Venetian red. All the necessary gutters to be formed in the most ap- Gutters. proved manner, and securely connected with the iron conductors for dis- charging the water from the building. Slating. The roofs of the tower and spires, and the steep portions Slate. of the roof of the building, to be covered with slate of different colors, orna- mentally disposed, as indicated on the perspective view, subject to such modifications of design as the engineer in charge may hereafter direct. Blue slate, from the Peach Bottom quarries, is to be used for the blue portions of the design, and red and green slate from Vermont, where these colors are indicated. All the slatts to be laid on two thicknesses of roofing felt, Roofing felt. and secured with galvanized iron nails. The whole to be executed in the best and most workmanlike manner, using galvanized iron flashings, and such other precautions Flashings. as may be necessary to make a perfectly water-tight roof. i^Note.') The portions of the roof embraced within the lines of cresting; also, the tops of the dormer windows and of the main tower, and the roofs of the boiler house and kitchen, will be covered with tin. Heating. The entire building will be heated by radiation from Steam pipes. steam pipes, which will be distributed as may hereafter be decided upon, it being understood that a sufficient radiating ijurface shall be provided to effectually warm the building in the coldest weather. The steam to be gen- erated in the boiler-house. 138 SPECIFICATIONS. General Conditions. All the work to be done in the best and most workman- Manner of execut- like manner, of approved materials, according to these mg the work, specifications and the plans and drawings, to be done and furnished, whether the same may have been herein particularly specified or not ; and all such necessary work and materials, which may not have been set Work and material forth in these specifications, or indicated on the plans re- ^'^^ specified, ferred to, to be done and furnished in a manner corresponding with the rest of the work, as well, as truly, and as faithfully as though the same were herein particularly described, and specifically provided for. Every part of the building is to be executed under the direction, and sub- ject to tlie approval of the Engineer in charge, who shall act as the agent and representative of the Engineer and Architect, to whom all questions relating either to the work, or to the contract for the same, shall be referred, and his decision shall in all cases be final. Supplement. The attention of bidders is called to the following points not mentioned in the above specifications : First, In the contract for the building, it will be required and provided that the footways on Sixth Street be kept clear its full width, from the curb to the regulated line of the steps ; that the materials used in the construc- tion of the work shall not be deposited at all on Sixth Street ; that the road- way and the sidewalk be kept clear of all incumbrance at all times, and that a temporary plank shed be placed over the said footway, for the protection of citizens during the progress of the work. Second, All bids must be handed in on or before Saturday, July 5th, 1873. Third, It is important to have the building roofed in, and the first story finished and ready for use by January ist, 1874, and the whole work com- pleted, finished up and delivered into the hands of the railroad company by June 1st, 1874. Bidders will please state whether they can accomplish the work within these dates, and if not how much longer time they would re- quire. Fourth. The columns in the restaurant are to be set on dressed stone plinths l' 6" square and i' 1" thick, and the iron floor beams are to be framed around them. Fifth. All chamfered bricks are to be moulded. Sixth. Six galvanized-iron ventilators to be constructed on roof, as shown on transverse section. Seventh. A main water pipe of 3 inches in diameter for extinguishing fires, is lo be carried up from the cellar to the third story, with a 2 inch hose attachment on each floor with screws and caps. Eighth. The encaustic tiles provided for in the specifications to be from the manufactory of Maw & Co., London, their agents being Merchant & SPECIFICATIONS. 1 39 Co., N. Y. The patterns are found in their printed catalogue, as follows : for the exterior walls of the building, No. 91, plate 36, and No. 178, plate 34. For the general waiting-room and the restaurant, No. 58, plate 15. For the hall and water-closet rooms, No. 223, plate 15, with the border shown on No. 58. Ninth. The following portions of the work will be done and furnished by the railroad company, to wit : Gas pipes and fitting, and gas fixtures ; terra cotta drain pipes and laying; steam heating and corking apparatus; plumbing; iron columns in the restaurant ; curbing and paving. Tenth. Bidders are requested to state what difference it would make in the cost of the work to finish all the first story in hard woods, oiled and pol- ished, instead of pine, painted and grained. For Masoniy of Railroad Bridge Over Street, Specifications For Masonry of Street Bridge to be Erected over the Pennsyl- vania Railroad, at Penn Avenue, in the City of Pittsburg, Pennsylvania. Pennsylv'ania Railroad Co., Office of Engineer Bridges and Buildings, No. 233 S. Fourth St., No. 8, third floor. See page 273. Philadelphia, April 15, 1875. The foundations to be dug out to a depth of six feet below Depth of founda- the natural surface of the ground, or to such greater depth '^°"- if found necessary, as the engineer may decide, and to be filled in for the depth of three feet with concrete. The concrete is to be formed of a hard durable stone, to Concrete stone. be approved of by the engineer, broken into angular fragments of a size to pass through a two and a half inch ring, and to be screened. This stone to be mixed with clear, sharp, river sand and Sand Cement hydraulic cement, one part sand and four parts broken stone. This must not be mixed in a larger amount than requires one barrel of cement at a time, and must be used as mixed, not being allowed to lay, and then re- mixed with water and used. The concrete must be prepared by first spreading out the Mi.xing. cement and sand in the proper proportions on a platform of rough boards, and thoroughly mixing them in a dry state. The proper quantity of stone is then to be added, and after again thoroughly mixing the whole, water is to be added as much as necessary, to bring the mass to the proper consist- 140 SPECIFICATIONS. ency; the materials being mixed as the water is added, until all the mate- rials are thoroughly incorporated, and the surface of each stone is well coated with mortar. This concrete must be placed in the foundations in layers not over a foot thick, and must be either thrown from a height of not less than ten feet, or else each layer must be well rammed until a film of water appears on the surface, but not enough to make it quake. Time must be given for the concrete to become firm Time to set. before masonry foundation is commenced upon it, as heavy pressure tends to retard the setting. The masonry will be rock range pitch face ; the stone to Masonry. be accurately squared, jointed, and bedded, and laid in How laid, courses not less than twelve inches thick, nor exceeding twenty-four inches in thickness; decreasing from bottom to top of pier or abutment. The stretchers shall in no case have less than sixteen inches bed ; and for all courses above sixteen inches, at least as much bed as face. They generally shall be at least four feet in length. The headers shall be of similar size with the stretchers, and shall hold the size in the heart of the wall that they show on the face, and be so arranged as to occupy one-fifth of the face of the wall, and when the thickness of the wall will admit of Bond. their interlocking, they will be disposed in that manner. When the wall is too thick to admit of that arrangement, stones not less than four feet in length will be placed transversely in the heart of the wall to connect the two opposite sides of it. The stones for the heart of the wall will be of the same thickness as those in the face and back ; bedded the same as the face stone, but not jointed, and must be well fitted to their places, any remain- ing interstices to be filled with small sound stones or chips. The face stones to be set in cement mortar ; the interior stones to be laid dry, and every course to be thoroughly grouted. The proportion of Grouting. sand, cement and lime in the mortar and grout, to be as directed by the engineer. The stones forming the masonry will be generally left with their faces as they come from the quarry, unless the projection from the neat line should exceed two inches, in which case they shall be roughly Scabbled, scabbled down to that point. Such coping and such posts for railing, as shall be indicated on the draw- ings, or shall be directed by the engineer, shall be ham- Copinp, &c., to be mer dressed to the required sizes, and placed as shown. hammer dressed. In all masonry the stone must be of a hard and durable Quality of stone- quality, either Derry, Massillon, or Freeport, of good size and shape, to be approved of by the engineer. The coping, bridge seats and posts, being the hammer Locality. dressed work, are to be of the Massillon stone. Such portions of the masonry as the engineer may require ^^ent deTe^r^'^^ed to be laid in lime or hydraulic cement, to be so laid ; the by Engineer. Pennsylvania Railroad Company furnishing, or paying for the lime or SPECIFICATIONS. 141 cement used, and the contractor furnishing a suitable protection for the cement from the weather. If, in the progress of the masonry, an increase in the increase in number number of headers spc-cihed should be required by the en- °^ headers, gineer, such additional number shall be laid in the work as he shall desig- nate. The whole of the construction to be in strict accordance work to accord with the drawings furnished by the Engineer of Bridges drawings, and Buildings of the Pennsylvania Railroad Company, and under the di- rection of the engineer in charge of the work. Bidders will state the prices for which they will do the Bids, work in the following manner : — For excavation of earth, so much per cubic yard, measured in the exca- vation. For concrete, so much per cubic yard, measured in place ; not including the cement and broken stones, which will be furnished by the Pennsylvania Railroad Company. For masonry laid in place, so much per perch of twenty-five cubic feet. For coping and bridge seats, so much per foot lineal of each width. For posts, so much per post in place. All prices to be for work measured in the wall complete. The prices shall in every case include the furnishing of all materials, (except lime, cement, and broken stone for concrete, which will be fur- nished by the Pennsylvania Railroad Company,) the cost of scaffolding, etc. , and all expenses attending the delivery of these materials, and all risks or any loss occasioned by floods, neglect or accident during the progress of the work, until the same shall have been completed, and accepted by the engineer. JOSEPH M. WILSON, Engineer Bridges and Buildings^ Penfia. R, R, 142 SPECIFICATIONS. For Superstructure of a Wrought Iron Railroad Bridge. Specifications For Superstructure of Railroad Bridge to be Erected near MoRRisviLLE Station, on the New York Division OF the Pennsylvania Railroad. Pennsylvania Railroad Co. Office of Engineer Bridges and Buildings, No. 233 8. Fourth St., No. 8, third floor. See page 273. Philadelphia, July 15th, 1875. The superstructure is to be constructed on the triangular General description girder system, and to consist of four spans, square to the line of the railroad, three of them deck bridges of three trusses, and one a half-through bridge of two trusses, numbering from the west end, the. railroad track having a curvature of five and a half degrees. The trusses throughout are to be composed entirely of wrought iron, ex- cept rollers and bolster blocks on the piers and abutments, having wrought upper chords of channels and plates, wrought iron upset weldless link lower chord, and wrought iron braces, all with link ends to be upset without weld. All joints are to be made with pin connections, and sleeve nuts are to be in- troduced in the laterals and diagonals for adjustment. The deck spans are to have timber floor-beams, and the half-through span wrought iron built cross girders ; white oak track stringers are to be used throughout. The bolsters and abutment plates are to be of wrought iron. The general dimensions are as follows : — span No, i. Distance, centre to centre of end pins T^ ft. 6 in. Number of panels - - 4 Number of sub-panels 8 Length of each panel 18 ft. 4^^ in. Length of each sub-panel 9 ft. 2|-in. Height of truss, centre to centre of chords — 7^t. 3 in. Distance, centre to centre of trusses 9 ft* 9 in. Spans Nos. 2 and 3. Distance, centre to centre of end pins »-. — 53 ft. 6 in. Number of panels , 4 Number of sub-panels 8 Length of each panel 13 ft. 41 in. Length of each sub-panel 6 ft. 8^ in. Height of truss, centre to centre of chords 6 ft. 6 in. Distance, centre to centre of chords 9 ft. 6 in. SPECIFICATIONS. 1 43 span A^o. 4. Distance, centre to centre of end pins 57 ft. 6 in. Number of panels - 6 Number of sub-panels 12 Length of each panel 9 ^t* 7 iri- Length of each sub-panel 4 ft. 90 in. Height of truss, centre to centre of chords 5 ft. 9 in. Distance, centre to centre of trusses 26 ft. 6 in. In the fourth span the cross girders occur at every sub-panel. All the wrought iron must be of the best quality, tough Wrought Iron. and fibrous, free from flaws and cracks along the edges. All the iron in the tensile members, lower chords, tension diagonals, laterals, bolts, &c., must be double rolled from the muck bar direct, no scrap will be allowed, and must be capable of sustaining an ultimate stress of sixty thousand (60,000) pounds per square inch, on a turned-down or grooved section, with no per- manent set under twenty-five thousand (25,000) pounds per square inch. When tested to breaking, if so required by the Engineer, the links and rods must part through the body, and not at the pin hole in the head. All workmanship must be first-class. All abutting surfaces must be planed or turned, so as to insure even bearings, and protected by white lead and tallow before shipment. No error of over one sixty-fourth (^'4) of an inch will be allowed in the lengths of bars between centres of pin holes of over one one-hundredth (iod) the diameter of the pin; said holes to be ac- curately drilled. All riveted plates must come in close contact v.here abut- ting, and the rivet holes must be spaced accurately and truly opposite. Rivets must completely fill the holes and have full heads, and, when neces- sary, they must be countersunk. Thickening washers are to be used when- ever required to make the joints perfectly snug and tight. The cast iron work is to be true and sound, free from flaws Castings. and defects of any kind, and may be green sand castings, but should be of good tough iron, the lines sharp and clear and according to the drawings. No rough or crooked castings will be accepted. All bolt and pin holes must be accurately drilled : all abutting surfaces must be planed, if neces- sary, to insure even bearings and neat close fittings, and the castings are to be perfectly dressed and fitted up to make a good job generally, when put in the bridge. The whole of the construction to be in strict accordance General conditions with the drawings furnished by the Engineer of Bridges and Buildings of the Pennsylvania Railroad Company. In all cases figures are to be taken in preference to any measurements by scale. No alteration to be made un- less authorized by the Engineer. All work to receive one coat of red lead in oil before being sent to the site. Bidders will state the prices per pound for WTOUght and Form of Bids. cast iron separately, delivered loaded on cars at the nearest point on the line of the Pennsylvania Railroad, or its branches^ to their works; the point being designated in the bid. Any bidders prepared to perform erection will 144 SPECIFICATIONS. also state a bid for erection at a round sum, the Pennsylvania Railroad Company transporting all materials from the place of delivery to the bridge site, and unloading the same, and also furnishing timber for false works, and timber for permanent roadway, the contractor, however, erecting the whole. The approximate quantities of iron in the bridge will be Quantities. as follows : — Wrought Iron, Bar iron 79,600 lbs. Channels. 49,400 " L and T iron 5,000 " Plates 58,300 " Rivets, ferrules, &c 9,000 '' 201,300 lbs. Cast Iron 1 4 ,000 '' 205,300 lbs. JOSEPH M. WILSON, Engineer Bridges and Buildings Fenna. R.R. For Masonry of Bridge ai Girai^d Avenue^ Philadelphia. Specifications For Masonry of Street Bridge over the Pennsylvania Rail- Road AT Junction of Belmont and Girard Avenues. Pennsylvania Railroad Co. Office of Engineer Bridges and Buildings, No. 233 S. Fourth St., No. 8, third floor. See page 273. Philadklphia, Aug. 16, 1875. A new north abutment is to be built, and also piers for Description ofthe work with general rows of columns between tne railroad tracks, the present instructions. north abutment to be entirely removed by the party contracting, who can make use of the stone in the same for the new work. The contractor is to perform his work without interfering with the travel on Belmont avenue, and is to preserve for the use of the passenger railroad companies at least one street track. Special care must be taken with the water pipe now in the street, that it is properly tresteled up and firmly supported from the be- ginning to the end of the work. The exposed side of the street next to any excavations that may be made, to be properly protected by temporary fenc- ing, and the contractor is to be responsible for any accidents that may occur by reason of insufficient protection for the public. He is also to be respon- sible for any accidents that may occur to the water pipe for want of proper SPECIFICATIONS. 1 45 supports, and he is to provide and erect all necessary shoring for the proper protection of banks, property, buildings, &;c. The excavations to be made to a depth of six (6) feet be- Excavation. low the surface of the ground, or to such greater depth as may be found necessary to insure a good foundation. The foundations to be rubble masonry, of stone of an ap- Foundations. proved quality and shape, the general size of which shall not be less than eight (8) cubic feet. The masonry above ground to be built of Trenton or Neat work, other approved stone, and to be rock range pitch face, without margin draft and built to the specified batters. The face stone to be accurately squared, jointed and bedded, and laid in course not less than twelve (12) inches nor exceeding thirty (30) inches in thickness, decreasing from bottom to top of abutment. They must be laid on their natural beds. The vertical joints in each course must be so arranged that they shall not come closer to those of a superior or inferior course than by one (i) foot. All courses to be dressed for a three-eighths {)i) joint. The stretchers shall in no case have less than sixteen (16) inches bed; and for all courses above sixteen (16) inches, at least as much bed as face. They generally shall be at least four (4) feet in length. The headers shall be of similar size with the stretchers and shall hold the size in the heart of the wall that they show on the face, and be so arranged as to occupy one-fifth (1) of the face of the wall, and when the thickness of the wall will admit of their interlocking, they will be disposed in that manner. When the wall is too thick to admit of that ar- rangement, stones not less than four (4) feet in length will be placed trans- versely in the heart of the wall to connect the two opposite sides of it. The backing stone shall be of large size and have parallel beds, but the beds are not required to be dressed like the face stone. The backing stones shall be laid so as to break-joint, and must be well fitted to their places, any remain- ing interstices to be filled with small, sound stone or chips. When the thickness of the wall exceeds three and one-half (3X) feet, headers of the same dimensions as those in the«face, and in equal number, will be placed in the back of the wall. The face and back stones to be set in cement mortar; the inferior stones to be laid dry and every course to be thoroughly grouted. The proportion of sand, cement and lime in the mortar and- grout to be as directed by the engineer. The stones forming the masonry will be generally left with their faces as they come from the quarry, unless the projection above the neat line should exceed two (2) inches, in which case they shall be roughly scabbled down to that point. Such portions of the abutments and piers as are shown by the drawings will be capped by coping stones of the thickness, projection and amount of dressed work as may be specified thereon, and particular care must be taken that the elevations of the tops of copings shall be the same as required by J 146 SPECIFICATIONS. the drawings, and any change in the thickness of courses, or any rebuilding- that may be required to attain the elevation, shall be so done. The pedestals specified on drawings must be neatly and accurately dressed. The stone to be free from unsightly flaws, cracks, clay or other marks, and any that the engineer shall deem to be such shall cause the rejection of the piece. The pedestals to be placed in such position and at such elevation as the drawings shall require. The workmanship throughout shall be of the best quality for each of the portions above specified, and any portion that may be deemed unsatisfac- tory or incorrect shall be rebuilt. Any additions to this work, when of the same kind as the work above specified, shall be done at the same rate as that already in hand, and any modifications that may be made to the plans, or any increase in the number of headers that may be specified shall be so made without additional charge. Such portions of the masonry as the engineer may require to be laid in lime or hydraulic cement shall be so laid; the Pennsylvania Railroad Com- pany furnishing or paying for the lime or cement used, and the contractor providing a suitable protection for the cement from the weather. The whole of the construction to be finished up complete in accordance with the drawings and these specifications, and subject to the approval and acceptance of the Chief Engineer and Surveyor of the City of Philadelphia. Bidders will state the prices for which they will do the Forms for bids of work, in the following manner : masonry. For excavation of earth, so much per cubic yard, measured in the ex- cavation. For foundations laid in place, so much per perch of twenty-five (25) cubic feet. For neat work masonry above foundations laid in place, so much per perch of twenty-five (25) cubic feet. For copings, so much per lineal foot. For pedestals, and cap stones for piers, so much per pier in place. The bidder will state what kind of stone he proposes using, and the time in which he will do the work. He will also state the price per perch of twenty-five (25) cubic feet that he will pay for the masonry in place, of., the present north abutment. All prices to include the items in their proper positions in the work, and all cutting and setting that may be required, also the furnishing of all ma- terials (except lime and cement, which will be furnished by the Pennsyl- vania Railroad Company), the cost of scaffolding, &c., and all expenses attending the delivery of these materials, and all risks or any loss occasioned by floods, neglect or accident during the progress of the work, until the same shall have been completed and accepted by the engineer. The Pennsylvania Railroad Company to furnish all bolts and iron that may be required to be set in the stone work. SPECIFICATIONS. 14/ The price for excavation will also include the refilling of any of the exca- vated material around the finished work, and back of it on Belmont avenue up to the grade of the street, and the removal of all surplus, refuse, and rubbish that may accumulate during the progress of the work, from the premises. JOSEPH M. WILSON, Engineer Bridges and Buildings, Pentta. R. R, Specifications For Grading Section 4, "Falls" Drive. Proposals will be received till noon of Thursday, July 31st, 1873, at the Office of the Commissioners of Fairmount Park, 251 S. Fourth St., Phila., for Grading Section 4 of " Falls " Drive. " Falls " Drive is on the East bank of the Schuylkill River, and section 4 extends from Falls wooden bridge, north-west, to the public street that leads to Ridge a^;enue, at Wolfenden's corner. Length 1125 feet; width of road- way, 30 feet. The work comprises some clearing and grubbing; about 12,000 cubic yards of borrowed earth embankments; about 1,300 cubic yards of clean coal ash surfacing to road-way ; some wooden trunk drains, and possibly some excavation and rubble masonry. The contractor shall furnish all tools, and as directed by the engineer; shall do the grubbing and clearing, make the excavations and embank- ments, furnish and deliver from outside of the Park the borrowed earth — properly for^m the road-way, gutters, borders and slopes, and do all work necessary to open section 4 of " Falls " Drive to public use, except construct- ing the wooden trunk drains, which will be furnished by the Park, but the contractor shall make all necessary excavations, and put the drains in place. Should temporary drains and bridges be required during construction, the contractor shall, at his own expense, supply them. The engineer will mark trees and stumps to be removed, and indicate the places to which the contractor shall deliver the same. Care shall be taken that no other trees or shrubs are injured or disturbed. All work shall conform to the lines, grades and limits fixed by the engineer. No top soil or perishable material shall be placed within the limits of the road-way, and all borrowed earth shall be free from offensive matter and rubbish, and in every way acceptable to the engineer. The borders and tops of the slopes shall be formed of earth suitable for planting. The road-way shall be reduced to sub-grade (one foot below fin- ished grade), and when time has been allowed for settlement, shall be re- 148 SPECIFICATIONS. dressed with earth to sub-grade, and covered with one foot in depth of clean coal ashes, and dressed to the proper form and height for the finished surface. Grading of material excavated within the limits of the Park, shall be es- timated in cubic yards of excavation only, and the price hereinafter named for excavation shall include excavating, delivering and forming into em- bankments. Borrowed earth required to complete the embankments shall be furnished by the contractor from outside of the Park limits, and the contractor shall deliver and form the same into the road embankments. The quantity will be estimated in cubic yards in the embankments formed of such borrowed earth, and after the same have thoroughly settled, and will be paid for at the rate hereinafter named for borrowed earth, which rate includes compensation for furnishing, delivering and forming into embankments. The coal ashes shall be free from all rubbish and foreign material, and shall be spread uniformly on the road surface, from the bank side of one gutter to the bank side of the opposite gutter, and shall fill the one foot in depth space between sub-grade and finished grade. Before coal ashes are put on any portion, the shaping and sub-grading of the same must be approved by the engineer, and any settlement after the ashes have been put on shall be filled with similar ashes and made good by the contractor, at his own expense. The quantity of coal ashes will be estimated in cubic yards in the road- way, but any excess in depth over one foot shall not be paid for except as borrowed earth. The price hereinafter named for coal ashes shall include compensation for furnishing, delivering, cleaning, spreading and forming the road surface. Upon the completion of the work the contractor shall carefully finish and dress to the form required the surface of the road, borders, slopes, and all Park areas entered upon. Damage to the work from high water, or any cause before its final com- pletion, shall be made good by the contractor at his own expense. Accidents resulting by reason of the work will be at the risk of the con- tractor, who shall erect and maintain proper guards to protect the public. The Contractor shall keep constantly on the work at least one foreman ; shall commence operation on or before August i8th, 1873. Shall prosecute the work continuously and regularly, at a rate that will complete the whole on or before November ist, 1873, and shall so complete the same. Estimates will be made monthly, reserving twenty per centum till com- pletion. No proposal will be considered unless accompanied by a properly executed and satisfactory bond, in the sum of $1000, to secure the faithful execution of the work, should the proposal be accepted. The right to reject any or all bids is reserved. SPECIFICATIONS. 1 49 Specifications For Macadamizing Belmont Avenue, Fairmount Papk, Phila. The area to be macadamized is about eighteen feet wide, and two thou- sand five hundred feet long, extending from Lansdowne drive to Elm avenue, and comprising about five thousand square yards. Adjoining the Macadam, on each side, there is to be a gutter thirty inches wide, paved with Belgian blocks. The forming and compacting of material to sub-grade, suitable to receive the Macadam, will be made by the Park force, independent of the contract for Macadamizing, but any disturbance of this sub-grade shall be repaired before the Macadam is laid, or at the expense of the Contractor. All material shall be furnished by the Contractor — shall be approved by the Engineer — and shall be of a durable and uniform quality. The Maca- dam may be formed of selected furnace cinder, or of approved stone. But the Contractor must state in his proposal what material he will use, and from whence obtained. The Macadam shall be twelve inches deep,* put on in layers as follows : — The lower courr.e shall be of irregular blocks, not exceeding five inches in their longest diameter, placed compactly together, and covered with the same broken to pass through a three-inch ring, and distributed to form an even surface, parallel to and five inches below finished grade. The surface thus formed shall be thoroughly rolled, then covered with similar material broken to pass through a screen with two- inch mesh, and distributed to form a surface parallel to and one inch below finished grade. This surface shall be thoroughly rolled, then covered to finished grade, with similar material broken to pass through a screen with one and one quarter inch mesh, and thoroughly rolled again. No dirt or ashes, and no material of any kind that will pass through a screen with one half inch mesh shall be introduced into or upon the Macadam. All rolling shall be done with a roller weighing not less than one gross ton per foot in length of bearing surface of roller. For gutters, sub-grade shall be twelve inches below finished grade. The lower five inches shall be of similar material to the lower course of the Macadam. This shall be rammed, covered with clean gravel, and finished with a pavement of rectangular blocks of granite or trap rock. The said stone blocks are to be of durable and uniform quality, each measuring on the face or upper surface, not less than four nor more than eight inches in length, and not less than four nor more than six inches in width, and in depth not less than four or more than seven inches ; blocks of four inches in width on their face, to be not less than three inches in width at base ; all other blocks in transverse measurement on the base, to be not more than ' The traffic is general. y light on this portion of the Avenue. 1 50 SPECIFICATIONS. two inches less than on the face ; but no block on the base shall be of less width or length than three inches. The contractor shall, on all work, follow and finish to the lines, grades and forms of section, given by the Engineer in charge. He shall erect and maintain proper guards to protect the public from accident ; and must, at all times, keep a sufficient portion of Belmont Avenue unobstructed, as to satisfy the demands of travel and traffic. Shrinkage, or settlement, or damage from whatever cause, before the completion of the whole work, shall be repaired and made good by or at the expense of the Contractor. Payments will be made monthly, by warrants drawn on the City Treas- urer, based upon estimates of the Engineer in charge, reserving twenty per centum until the completion of the contract. The lower course of the Macadam, called for in these Specifications, shall be completed on or before the loth day of December, A. D., 1870, and the whole amount shall be completed on or before the 23d day of December, A. D. 1870. Specifications For Graduation and Masonry of a Single Track Railroad. Form used by the Pennsylvania, and Philadelphia & Reading Railroads. See pages 232, 280. Graduation. Under this head will be included all excavations and embankments re- quired for the formation of the road-bed ; cutting all ditches or drains about or contiguous to the road ; the foundations of culverts and bridges, or walls ; the excavations and embankments necessary for reconstructing turn- pike or common roads, in cases where they are destroyed or interfered with in the formation of the Railroad; and all other excavations or embank- ments connected with or incident to the construction of said Railroad. All cuttings shall be measured in the excavations and estimated by the cubic yard under the following heads, viz : Earth, Loose Rock, Solid Rock. Earth — will include clay, sand, loam, gravel, and all other earthy matter, or earth containing loose stone or boulders intermixed, which do not exceed in size three cubic feet. Loose Rock — shall include all stone and detached rock lying in separate and contiguous masses, containing not over three cubic yards ; also, all hard-pan, cemented clay, or stone, slate or other rock that can be quarried without blasting, although blasting may be occasionally resorted to. Solid Rock — includes all rock occurring in masses exceeding three cubic yards, which cannot be removed without blasting. SPECIFICATIONS. I5I The road-bed will be graded twenty-one feet wide in earth cuttings, and sixteen in fillings, except where otherwise directed by the Engineer, with side slopes of such inclination as the Engineer shall in each case designate, and in conformity to such depths of cuttings and filling as may have been or may hereafter be determined upon by said Engineer. Earth, gravel, and other material taken from excavations (except when otherwise directed by the Engineer) shall be deposited in the adjacent em- bankment, the cost of removing which, when the haul is not more than six- teen hundred feet, will be included in the price paid for excavation ; all ma- terial necessarily procured from without the road, and deposited in the em- bankments, will be paid for as embankment only, but all material necessa- rily procured from within the line of the Railroad, and hauled more than sixteen hundred feet, will be paid for as excavation, and also as embank- ment. In procuring materials for embankment from without the line of road, the place will be designated by the Engineer in charge of the work, and in excavating and removing it, care must be taken to injure or disfigure the land as little as possible. The embankment will be formed in layers of such depth, and the materials disposed and distributed in such manner as the Engineer may direct, with the required allowance for settling. Material necessarily wasted from the cuttings will be deposited in the vicinity of the road, according to the directions of the Engineer in charge. The ground to be occupied by the excavations and embankments, together with a space of 12 feet beyond the slope stakes on each side, or 10 feet beyond the berm ditch, where one is required, will be cleared of all trees, brush, and other perishable matter. Where the filling does not exceed two and a half feet, the trees, stumps, and saplings must be grubbed ; but un- der all other portions of the embankment it will be sufficient that they be cut close to the earth. Where the road passes through woods, the timber on each side of the road to be slashed for such a width (generally 80 feet from the centre line) as the Engineer may direct. Contractors, when directed by the Engineer in charge of the work, will deposit on the side of the road, or at such convenient points as may be des- ignated, any stone or rock that they may excavate, and if, in so doing, they should deposit material required for embankment, the additional cost, it any, of procuring other materials from without the road, will be allowed. All stone or rock excavated and deposited as above, together with all timber removed from the line of the road will be considered the property of the Railroad Company, and the contractors upon the respective sections will be responsible for its safe keeping until removed by said Company, or until their work is finished. The line of road or the gradients may be changed, if the Engineer shall consider such change necessary or expedient, and for any considerable alter- ations, the injury or advantage to the contractor will be estimated, and such allowance or deduction made in the prices as the Engineer may deem just and equitable ; but no claim for an increase in prices of excavation or em- 152 SPECIFIGATIONS. bankment on the part of the contractor will be allowed or considered, unl made in writing, before the work on that part of the section where the teration has been made shall have been commenced. The Engineer n also, on the conditions last recited, increase or diminish the length of a section for the purpose of more nearly equalizing or balancing the exca tions and embankments. Whenever the route of the Railroad is traversed by public or priv roads commodious passing places must be kept open, and in safe condit for use ; and, in passing through farms, the contractor must also keep such temporary fences as will be necessary for the preservation of the cro Masonry, All masonry will be estimated and paid for by the perch of twenty-f cubic feet, and will be included under the following heads, viz : Culv Maso7try, Bridge Masonry j Vertical and Slope Wall Masonry , and Pavi All rectangular culverts will be built dry, with a water way of not 1 than two and a half by three feet ; the abutments will rest on a pavcm of stone, set edgewise, of at least ten inches in depth, confined and secui at the ends by deep curb stones which must be protected from undermini by broken stone, placed in such quantity and position as the Engineer n direct. The abutment walls will not be less than two and a half feet thi and built of good-sized and well-shaped stone, properly laid and bound gether by stones, occasionally extending entirely through the walls. 1 upper course to have at least one-half of the stones headers ; and stretchers in no case to be less than twelve inches wide ; no stone in 1 course to be less than six inches thick. The covering to be of sound, strc stone, at least twelve inches thick, and to lap its whole width not less th ten inches on each abutment. The thickness of the covering-stone i dimensions of the walls to be increased at the discretion of the Engineer The foundations of these culverts, when the bottom of the pit is comn earth, gravel, &c., will generally consist of a pavement formed of stone edgewise, not less than twelve inches in depth, secured in the same man as before described for rectangular culverts. When the foundation uj which a culvert is to be built is soft and compressible, and where it wil all times be covered with water, timber well hewed, and from eight twelve inches in thickness (according to the span of the culvert), will be 1 side by side crosswise upon longitudinal sills, and where a strong curr will be forced through during floods; three courses of sheet piUng are to placed across the foundation : one course at each end and one in the rr die, to be sunk from three to six feet below the top of the timber, acco ing as the earth is more or less compact. The abutments are to be built range work or in broken courses, the face stones bedded and jointed ; stretchers in the face are to have beds of at least 15 inches, and in no c less bed than rise, and they are to be not less than two feet long, measu: in the face of the wall ; the headers will extend through the wall in ca SPECIFICATIONS. I 5 3 where it does not exceed three and a half feet thick, and they shall have not less than iS inches length of face. There shall be not less than one header to every seven feet of face, measured from centre to centre, and so arranged that a header in a superior course shall be placed between two headers in the course below ; the backing stones shall be of large size, and have parallel beds, laid so as to break joints with one another, and when the thickness of the wall exceeds three and a half feet, headers of the same dimensions as those in the face will be placed in the back of the wall, in the proportion of one for every two headers in the face. The beds and joints of the arch stone are to be accurately cut, and to be laid in courses throughout. The ring stone will be neatly cut, and composed of alternate long and short bond stones of not less than three feet and eighteen inches respectively. The parapet and wing walls will be built similarly to the abutments, and surmounted with a well-dressed coping, not less than ten inches thick, and three feet wide. The outside stones to be laid in cement mortar, and the whole wall thoroughly grouted. The spandrel backing to be good rubble work, built as directed by the Engineer. When rock foundation cannot be had for abutments and piers, the ma- sonry shall be started upon hewn timber, sunk to such a depth as to protect it from decay, and to prevent the possibility of underwashing. The timber platforms will be composed of one or more courses, according to the depth of the water, the height of the masonry, or other circumstances, of which the Engineer shall judge and determine. The masonry will be of three qualities, either to be adopted at the discretio7i of the Engineer. First quality will be rock range work. The stone to be accurately squared, jointed and bedded, and laid in courses not less than twelve inches thick, nor ex- ceeding twenty-four inches in thickness, regularly decreasing from bottom to top of pier or abutment. The stretchers shall in no case have less than sixteen inches bed for a twelve-inch course, and for all courses above sixteen inches at least as much bed as face ; they shall generally be at least four feet in length. The headers will be of similar size with the stretchers, and shall hold the size in the heart of the wall that they show on the face, and be so arranged as to occupy one-fifth of the face of the wall ; and they will be similarly disposed in the back. When the thickness of the wall will ad- mit of their interlocking, they will be disposed in that manner. When the wall is too thick to admit of that arrangement, stones not less than four feet in length will be placed transversely in the heart of the wall, to connect the two opposite sides of it. The stone for the heart of the wall will be of the same thickness as those in the face and back, bedded the same as the face stone, but not jointed, and must be well fitted to their places ; any remaining interstices will be filled with small sound stones or chips. The face stones to be set in cement mortar, the interior stones to be laid dry, and every course to be thoroughly grouted. The proportion of sand, cement and lime, in the mortar and grout, to be as directed by the Engineer. The stones forming the points of piers which act as ice breakers, shall be neatly 154 SPECIFICATIONS. dressed on their faces ; the other face stones will, with the exception of the draft, be generally left with the face as they come from the quarry, unless the projections above the draft should exceed two inches, in which case they shall be roughly scabbled down to that point. The abutments and piers, or such portions of them as the Engineer may direct, shall be covered with a course of coping, not less than twelve inches thick, well dressed and fastened together with clamps of iron. The second quality of bridge masonry will be range work, or in broken courses, as may best suit the stone that is used. The face stones to be ac- curately jointed and bedded. The stretchers in the face to have beds of at least fifteen inches, and in no case less bed than rise, and to be not less than two and one-half feet long, measured in the face of the wall. The headers shall have not less than eighteen inches length of face, and shall extend at least three and one-half feet into the wall. There shall be not less than one header to every seven feet of face measured from centre to contre, and so arranged that a header in a superior course shall be placed between two headers in the course below. No course to be less than eight inches in thickness. The backing stone shall be of large size, and have parallel beds, but the beds are not required to be dressed as in first-class masonry. The backing stones shall be laid so as to break joint with one another, and when the thickness of the wall exceeds three and one-half feet, headers of the same dimensions as those in the face, and in equal number, will be placed in the back of the wall. The outside stones to be set in mortar, and the whole thoroughly grouted. The third quality of bridge masonry will be rubble work, laid with mortar in irregular courses, and will consist of stone containing generally six cubic feet each, so disposed as to make a firm and compact work ; and no stone in the work shall contain less than two cubic feet, except for filling up the interstices between the large blocks in the heart of the wall ; at least one- fifth of the face shall be composed of headers extending full size four feet into the wall, and from the back the same proportion and of the same di- mensions, so arranged that a header in the back shall be between two headers in the face. The corner-stones shall be neatly hammer dressed, so as to have horizontal beds and vertical joints. The vertical walls will be good dry rubble work, of such dimensions, and built with such batter as the Engineer may direct. Slope walls will be built of such thickness and slope as may be required by the Engineer. No stones, however, to be used in its construction which do not reach through the wall, nor any less than six inches in thickness, by twelve inches long ; the beds of the stones to be placed at right angles with the face of the bank; the joints must be close, and free from spails. In all masonry the stone must be of a hard and durable quality, of good size and shape, to be approved of by the Engineer. Such portions of the masonry as the Engineer may require to be laid in lime mortar or hydraulic cement, will be so laid; the Railroad Company furnishing or paying for the SPECIFICATION'S. 155 lime and cement used. If, in the progress of the masonry, an increase in the number of headers specified should be required by the Engineer, such additional number shall be laid in the work as he shall designate. The price per perch paid for masonry shall in every case include the fur- nishing of all materials (except lime and cement). The cost of scaffolding, centering, &:c., and all expenses attending the delivery of these materials, and all risks from floods or otherwise. Where the excavation of the road bed does not furnish sufficient stone for the protection of walls and embankments, the same shall be procured at such places, and disposed in such manner as the Engineer may direct. No charge shall be made by the contractor for hinderances or delay, from any cause in the progress of any portion of the work in this contract, but it may entitle to an extension of time allowed for completing this work, sufficient to compensate for the detention, to be determined by the Chief Engineer, provided he shall give the Engineer in charge immediate notice in writing, of the cause of the detention. Nor shall any claim be allowed for extra work, unless the same shall be done in pursuance of a written order from the Engineer in charge, and the claim made at the first settlement after the work was executed, unless the Chief Engineer, at his discretion, should direct the claim, or such part as he may deem just and equitable to be allowed. Specification For Superstructure and Track Laying. (From Vose's "Manual for Railroad Engineers.") Stipcrstr^tcttire. — StibsiUs. To maintain the track in good adjustment until embankments are set- tled, subsills will be laid on certain banks, and likewise in cuts where the imperfect nature of the bottoming may, in the opinion of the engineer, render them expedient. These subsills to be fairly bedded in the earth, or ballasting, and carefully adjusted and rammed so as to correspond with the grade lines given by the engineer. An additional piece of sill four feet long shall be laid at each joint of the subsill, either under the sill, or alongside, as may be directed. The sills will be of 3X9 planks, in lengths of twelve, fifteen, eighteen and twenty-one feet; of which one-fourth may be below fifteen, one-fourth below eighteen, and one-fourth below twenty-one feet. The plank must be square at the ends, and of sound, durable material, and not have more than two inches wane on one end only. There will be about 25,000 feet, board measure, laid per mile where it may be required, and 660 joint sills, 3X9 inches, and four feet long. When the depth of stuff to be 156 SPECIFICATIONS. moved to admit the subsills exceeds six inches, an allowance shall be made for extra labor, the amount of which shall be noted by the assistants on their receiving notice of such extra labor from the contractor or his agent. Cross Ties. The cross ties shall be of white, black, or yellow oak, burr oak, chestnut red elm, or other sound timber of suitable character, in the opinion of the engineer, eight feet long, and not more than three inches out of straight, hewn to a smooth surface on two parallel plane faces, six inches apart, the faces being not less than seven inches wide, for at least half that number, and the remainder not less than six inches wide. The ties shall be care- fully and solidly laid on the subsills, or ballasting, or earth previously pro- perly prepared, so as to give the true planes required by the rails, whether on straight or curved lines. They shall be laid at the rate of eight ties to each eighteen feet rail. All imperfect ties shall be excluded by the track- laying party. The surface of the ties to be faithfully adjusted to the grades given, and to the web of the rail ; and the rail to be truly laid and firmly spiked, so as to correspond neatly to the alignment of the road. There will be about 2,500 ties required per mile of road. Chairs and Joints. When chairs are used, they shall be such as directed by the engineer and furnished by the company, and shall be well and accurately placed, and spiked in such manner and position as required, and the largest ties shall be selected for the joints. When the joint is made by fishing, there will be no tie directly under the joint. Rails,* The rails will weigh about sixty pounds per lineal yard. No rail shall be laid on the tangents which is in any way twisted or bent. It shall be the duty of the first party to correct and make true any crooked rails received by him, also to bend to the proper curve, and in such manner as not to affect the strength of the bar, all rails laid in curves. Punching of rails, and cut- ting, will also be done by the contractor. Track Laying. The materials composing the track will be furnished by the company, and shall be laid in the best manner, according to the conditions following : The track will be laid on cross ties, and the ties at the proper places on subsills. Where the sills are used, they will be laid with four feet blocks at the joints, and with six feet blocks at the rail joints, the whole being set to their places by stakes, and by the engineer's directions, and mauled down to a perfect bearing, being settled at least half an inch by mauling. The cross ties will be placed uniformly distant, (twenty-eight inches from centre to centre). A slip of metal shall be inserted at the rail joints, while laying. See Specifications of Cincinnati Southern Railroad. SPECIFICATIONS. 1 5/ to keep the rails apart sufficiently to allow for expansion, which thickness (depending upon the temperature) shall be fixed by the engineer.* Two spikes shall be used at each end of tie, one inside and one outside of the rail, upon straight lines. Upon curves of less than 1,500 feet radius two spikes outside and one spike inside the rail, at each end of the tie, shall be used. Upon curves the outer rail will be raised to such an amount, depend- ing upon the radius of the curvature, as the engineer may direct. Tuniouts. The contractor to put in such turnouts and sidings, with the necessary frogs and switches, as may be required ; the frogs and switches to be firmly and truly placed in position so as to work easily. Filling and Ditching. The stuff moved in bedding the sills and ties, to be placed between the latter. The ditches to be properly cleaned out after the track is laid ; the filling never to rise higher than the top of the cross ties. Any surplus stuff to be moved out of the cuts, or if on embankments, to be thrown over the bank, leaving the track and road-bed in a neat and workmanlike manner. Delivery of Materials, The ties and sills to be delivered at some point on the road, as near as possible to the places where they are to be used, in no case re- quiring more than one thousand feet of haul ; to be so piled as easily to be counted and inspected. The bids for ties will be by the piece, the proposal stating the number and conditions ; the sills to be bid for by the thousand, board measure. All material furnished in connection with track laying, to be delivered in such manner and time as to comply, in good season, with the contract for laying the rails. Measurement of Track. The measurement of track laid shall include the turnouts, measuring from heel to heel of switch, no extra allowance being made for putting in frogs or switch machinery. Feficing. Bids for fencing will be by the running foot or mile, including both sides of the road. Where required, it will consist of posts placed eight feet apart from centre to centre, set three feet in the ground, either by digging, or boring, and not by mauling. The posts shall be of oak, elm, chestnut, or other durable wood, not less than eight inches in diameter at the bottom, barked and charred where put into the ground. The boards to be 6X1 inches, and to square sixteen feet long, to be placed six inches apart, ver- tically, and fastened to the posts by tenpenny nails at each bearing and breaking joint with each other. The fence will be five bars high, the top of * The expansion of wrought iron is .0000068 of its length for each degree Fahrenheit. 158 SPECIFICATIONS. the uppermost being five feet from the ground. In side hill, and on ground liable to slide, particular care shall be taken to place the posts firmly in the ground. At cattle guards, the fence will be turned in to the proper dis- tance, and such arrangement made as to prevent the passage of animals. General Provisions, — Classification, The classification of material excavated will be referred to the engineer, in all cases where the nature of the material is questioned, and his judg- ment taken thereon ; also all material used in structures will be submitted to the inspection of the engineer or his assistants. Quantities and Qualities ajfproximate. The quantities and qualities of work presented in the schedule are merely approximate, and the information given on the maps and profiles in relation thereto is according to the best present knowledge. The company retains the right to change at any time during the progress of the work the align- ment, grades and widths of the road, or any part thereof, and also the limits of the sections; or to alter the character, vary the dimensions, or change the location of structures, or substitute one kind of work or mate- rial for another, or to omit entirely, when found necessary, or to require to be built where not now contemplated ; and the contractor shall carry into effect all such alteration when required, without the contract prices being thereby affected, unless the aggregate value of all work contemplated by the contract be changed fully 20 per cent., in which case a fair allowance, either for the company or contractor, shall be made by the engineer. In case, however, the aggregate value of the work be changed over 20 per cent, of the original amount, and the contractor be not satisfied with the altered compensation, then said contractor may throw up said contract, on condition, that within ten days after receiving notice from the engineer of such alteration, he give written notice to the engineer or the company of his desire to do so, in which case, as in other cases of throwing up the con- tract, he shall, as soon as desired, give peaceable possession to the company or their agents, leaving also in their possession any tools or machinery upon which they have advanced anything ; and the company may then settle with the contractor on the measure of damages which either shall suffer. Basis for Estimating Effect of Changes, The basis for estimating changes as above mentioned is understood to be the schedule exhibited at the letting. No Liquor y and Good Order, The contractor shall not sell, or allow to be sold or brought within the limits of his work, any spirituous liquors, and will in every way discounte- nance their use by persons in his employ. He will do all in his power by his own act, or by assisting the officers of the county, or of the corporation, to maintain the laws and such regulations as conduce to good order and SPECIFICATIONS. 1 59 peaceable progress, and p; event encroachment on the rights of persons or property ; and he shall discharge from his service, when required by the engineer, any disorderly, dangerous, insubordinate, or incompetent person, and refuse to receive into his employ any who may have been discharged for such cause from other parts of the work. Monthly Estimates, Measurements and estimates shall be made by the engineer, once in each month, by means of which may be known approximately the amount of work done, and the contractor shall be entitled to payment therefor, at such rates below his contract price as may be agreed upon by the parties to the contract ; it being understood that the contractor has no claim on account of any material not laid in its place in the roadway, or for labor bestowed thereon ; and the quantities shall be estimated from the dimensions when so laid, though, on the advice of the engineer, advances may be made on such material when delivered for use, in which case it becomes the property of the company, in the contractor's care and keeping, and he becomes liable for its loss or injury. Extra Work. No claim for extra work, or for work not provided for in the contract, shall be allowed, unless a written order to perform such work shall have been given by the engineer ; or unless the work be subsequently certified by him, and the certificate produced at the time of demanding the pay- ment of the monthly estimate next after such work shall have been per- formed. Sub- Contracts. The contractor will be required to perform the work himself, and no sub- contracts relieving him from the responsibility of a proper performance of his contract will be permitted, unless by the written consent of the president of the company, and no moneys shall be paid to any such sub-contractor for work or materials, without sufficient authority from the principal con- tractor. Tiine of Commencing Work, On the acceptance of a proposal, the chief engineer will give notice thereof to the person proposing, by letter, directed to his stated address ; and in twenty days from the date of such notice, provided there be no im- pediment on the part of the company, or in twenty days after such impedi- ment is removed, if there be any, the work shall be begun with an adequate force, and from that time prosecuted vigorously until its completion. How to Progress. It shall be understood that proper progress is not made, if the amount of work done in each month is not in due proportion to the total amount to be done up to the time fixed for completion of the contract; in which case the engineer shall call the attention of the contractor (or whoever may be in l6o SPECIFICATIONS. charge of the work if the contractor be absent) to the fact, and state to him what additional exertion is necessary to be made, and what further force is required, in such reasonable time as may be prescribed. Putting on More Force. In default of the contractor making such additional exertion, and sup- plying such force, the chief engineer, or president of the company, may have such force sent to the work, and the necessary buildings may be erected to receive them at the contractor's charge and expense, who shall receive the said force in his employ, and work it at whatever price it may have been found necessary to employ it, without diminishing the previous force of the work, and regarding, always, such extra force as if employed by himself. Causes for Detention. There shall be no claim for detention on account of work not being laid out, unless a written notice, three days in advance, that it is required, shall have been given to the engineer ; and the damage for such detention shall be estimated by the engineer. The right of way shall be furnished by the company : but if it fails to do so for any particular place, damages for de- tention shall not be claimed, unless the contractor be detained full twenty days after he shall have given written notice to the engineer, of his wish to commence work at such place. Then the engineer may either estimate to him the amount of damage which he shall take as satisfactory, or he may extend the time for the completion of such work by as many days beyond the contract time, as the contractor is detained beyond the twenty days fol- lowing his notice to the engineer. The Engineer. In all cases where the word " engineer " is used, the engineer in charge of construction is meant ; but the directions of any subordinate engineer shall be obeyed when given in regard to any of the ordinary operations, or where they are evidently in accord with the specifications, or when trans- mitting the orders of his superiors. In other cases they may be referred to the resident engineer, and finally to the chief engineer, he being the autho- rized officer at the time acting in that capacity. Contractor. The word " contractor '' applies to and includes all persons contracting jointly, any one of whom shall be considered the authorized agent for and in behalf of his associates, and empowered to receipt payments of moneys, receive and act upon orders. SPECIFICATIONS. l6l See page 233. SPECIFICATIONS FOR TUNNELS.* Tunnel work will be classified as follows : I. Tunnel excavations Sinking shafts. Masonry in abutments. Arch-work of stone. Arch-work of brick. Backing. Masonry in facade and approaches. Masonry in shafts. The tunnels to be excavated to the neat lines as shown Tunnel excavation, on the drawings of the cross-sections, and to be lined, or left without lining, according to the nature of the material excavated, and as the engineer may direct. The material excavated from the ends of the tunnels to be placed in em- bankment on the line of road adjacent, or wasted, as the engineer may direct. The material excavated and raised through shafts to be wasted at such convenient places near the shafts as the engineer may designate. Tunnel excavation will be paid for by the cubic yard, counting only the material within the section, as designated by the engineer. Should the en- gineer deem it advisable, on account of the material passed through, to modify the section of the tunnel in order to avoid arching, all the material within the limits of such modification will be measured and paid for at the specified price per yard. The price per yard paid for excavation to include all expense of timbering, the furnishing of all timber or other materials, the hoisting of material through the shafts, pumping of water, and all expenses of every kind con- nected with doing the work ; also to include the cost of hauling the mate- rial, where the haul does not exceed feet. Should the engineer deem it advisable to transport the material to a greater distance, a price per cubic yard will be paid for the excess of haul over feet. Shafts feet by feet Sinking shafts. in clear of timbering will be sunk at the points designated on the drawings, and will be paid for by the foot in depth. The price paid for sinking shafts to include all expenses for timbering or otherwise securing the walls. Masonry. Should the tunnel require lining, the general form of the masonry will be as shown on the drawing ; the details of thickness of abutments and arches, * Reference is made to Mr. Henry S. Drinker's work on " TrxNELiNG, Explosive Compounds and Rock Drills " for other examples of tunnel specifications, and for general statistics in regard to tunnel construction, rock excavation, blasting, mason-work. K 1 62 SPECIFICATIONS. &c., to be designated by the engineer from time to time, as in his judgment may be necessary. The tunnel arch will be of stone or of brick, or partljr of both, at the discretion of the engineer. All masonry will be paid for by the perch of twenty-five cubic feet. The masonry in abutments will be first-class rock range Masonry in work, the stone to be accurately squared, jointed and bedded, abutments. and laid in courses of not less than twelve inches nor exceeding twenty inches in thickness, regularly decreasing from bottom to top of the wall. The stretchers shall in no case have less than sixteen inches bed for a twelve inch course, and for all courses above sixteen inches at least as much bed as face. They shall generally be at least four feet long. The headers shall have not less than twelve inches length of face ; they shall hold the size in the heart of the wall that they show on the face ; they shall extend entirely through the wall when its thickness is not over four feet, and shall be equal in number with the stretchers, and so arranged that a header shall come be- tween each two stretchers. Where the thickness of the wall is more than four feet, headers shall be placed in the back of the wall at the rate of one. header in the back for two in the face, and so arranged as to give a good bond. The stones for the interior of the wall must be similar in size with the face stone, of the same thickness, and bedded the same, but are not re- quired to be jointed. They inust be so arranged as to give a good bond, and. be v/ell fitted to their places ; any remaining interstices to be filled with small sound stone chippings. The whole wall will be laid in cement mortar, or the outside stones laid in cement mortar and the interior grouted, as the engineer may direct from time to time. The face stone will generally be left with the face as they come from the quarry, the edges of the joints being pitched to a line, but no projection of over two inches outside of the neat line of the wall will be allowed. Niches or openings will be left in the walls at convenient points to afTord shelter for workmen from passing trains, and drain openings will be left in the walls to allow of water escaping, as may be designated by the engineer. Any spaces remaining between the abutment walls and the sides of the tunnel as excavated, to be completely filled with rubble work laid dry. The arch stones to be laid in courses throughout, each Arch work of stone being the full depth of the arch, and accurately dressed ^^°^^- to the shapes and sizes to be designated by the engineer. They will gen- erally be about four feet long, and so arranged as to break joint with each other. They will be set in cement mortar, with joints not to exceed one- eighth of an inch. The bricks used in arches to be the best quality of straight Arch work of hard-burned brick; no bats, salmon or soft brick of any ^'^^'^^• grade will be allowed. The brick work will be laid in cement mortar, with joints not exceeding one-eighth of an inch, and with such bond as the en- gineer may direct. The bricks at the time of laying to* be well wet, the SPECIFICATIONS. 1 63 cement mortar to be thin and freshly mixed, the cross-joints to be carefully mortared, each brick to be well driven to its place by blows of the mallet, and each course carefully grouted. The several courses of brick at the crown forming the key of the arch to be laid in without mortar, brick to brick, and then carefully grouted until the joints are filled. The outer sur- face of the arch to be well cemented to prevent leakage. Should the engineer deem it advisable to use hoop iron to strengthen the bond of the brick work, the cost of the iron used will be allowed in addition to the price per perch for brick masonry. The spaces between the arch and the sides of the excava- Backing. tion to be completely tilled, as the work progresses, with rubble work laid dry. The face of the arch will be formed of neatly cut ring Masonn' in facade stones, composed of alternate long and short bond stones of and approaches, not less than three feet and eighteen inches respectively. The parapet and wing walls will be built similarly to the abutments, and surmounted with a well dressed coping not less than twelve inches thick and three feet wide. When the main part of the tunnel is completed, should Masonry' in shafts. the engineer require it, the shafts shall be walled up with a circular lining of rubble stone from the bottom to the surface of the ground, and the space between said wall and the sides of the excavation closely filled with some suitable material; otherwise the bottoms of the shafts shall be properly secured to prevent injury from any falling material. Such culverts and drains shall be constructed as the engineer may require, any excavation necessary for this purpose shall be considered as part of the tunnel excavation, and paid for accordingly. If culverts are constructed of brick, they will be paid for at the same rate per perch as arch work of brick. Should the engineer deem it best to use tile drain pipes, or adopt any other plan for drainage, the proper cost thereof will be allowed to the contractor. In all masonry the stone and brick must be of good, hard and durable quality, and, with the sand and all other materials used, to be subject to the inspection and approval of the Chief Engineer or his assistant. The railroad company will furnish or pay for all lime and cement used, but the contractor shall provide a suitable place for storing lime and cement, and shall be responsible for the safe keeping of the same. The proportions of lime, cement and sand in all mortar and grout to be as directed by the engineer. Cement to be mixed in small quantities only as used, and especial care taken to not allow it to set before being used in the work. Any improper or condemned materials shall be removed from the work forthwith, when directed by the engineer. The price per perch for masonry shall in every case include the furnish- ing of all materials- (except lime and cement), the cost of scaffolding, center- 164 SPECIFICATIONS. ing, &c., and all expenses attending the delivery of these materials, and all risks from floods or otherwise. No charge shall be made by the contractor for hinderances or delay, from any cause, in the progress of the work, but it may entitle him to an exten- sion of time allowed for completing the work, sufficient to compensate for the detention, to be determined by the Chief Engineer, provided he shall give the engineer in charge immediate notice in writing of the cause of the detention. Nor shall any claim be allowed for extra v/ork, unless the same shall be done in pursuance of a written order from the engineer in charge, and the claim be made at the first settlement after the work was executed, unless the Chief Engineer, at his discretion, should direct the claim, or such part as he may deem just and equitable to be allowed. Specifications For Grading, Masonry, Bridges and Rails, as used on the Cincinnati Southern R. R., Built under the Direction of Thos. D. Lovett, Consulting and Principal Engineer. See page 233 a. Graduation. Under this general head will be included clearing and grubbing, excava- tions and embankments, required for the formation of the road-bed, turnouts or depot grounds, or in any way connected with or incident to the construc- tion or drainage of the same, or the change or crossing of roads or streams. Clearing or Grubbing. — Grubbing will be required the entire width of the road-beds and on turnouts, depot grounds or highways, in all ex- cavations and embankments, which are three feet or less in depth ; also, in all slopes where the safety of the road requires it. The clearing shall be made on the entire length of the road, and shall not be less than one hundred feet in width on the regular road-bed, and as much more as in the opinion of the engineer will be required for the safety or convenience of the road. The ground on which the embankments or excavations are made shall be cleared of all vegetable and perishable matter. All stumps must be cut close to the surface, and none left within two feet of grade in embank- ments. Fences, buildings, timber and wood on the line of the road, are the property of the railway or land owner. If not removed by the owner within a reasonable time, they shall be cleared off by the contractor, piled up, and preserved for the use of the owner or railway, without charge. All refuse limbs or timber must be burned. The contract price for excavation and embankment must cover clearing and grubbing, as well as all the items under that head. Contractors must bear this in mind. SPECIFICATIONS. 1 65 Excavation. — The road will be graded for a single track (except at depot grounds and turnouts.) The road-bed shall be of such width as the engineer may direct from time to time, as the work progresses — generally about twenty feet in earth cuts, and sixteen feet in rock cuts. The slopes shall be of such inclination as the engineer may designate, and in conformity to such depth of cutting and width of road-bed as may have been or may hereafter be determined and fixed upon by said engineer, as guide bounda- ries for the work. Excavation will be classified under the following heads, viz.: — Earth, Hard Pan, Loose Rock, Solid Rock, Iron Ore, and Excavation in Water. Earth. — Earth will include clay, sand, gravel, loam, decomposed rock and slate, stones and boulders containing less than one cubic foot, and all other material of an earthy kind, excepting Hard Pan as described below. Hard Pan will consist of tough, indurated clay or other earthy material, w-hich, in the opinion of the engineer, requires blasting for its removal; also hard tough cemented gravel. Loose Rock, — All boulders and detached masses of rock measur- ing over one cubic foot in bulk, and less than one cubic yard; also all slate, coal, shale, soft friable sandstone and soapstone, and all other material except solid sandstone and limestone in place, except those de- scribed above ; also stratified limestone in layers eight inches thick and under, separated by strata of clay. Solid Rock. — All limestone and sandstone in place, in masses of more than one cubic yard ; with the exception of stratified limestone described in specifications for loose rock. The prices for excavation include all bottoming, road crossing, alteration of roads and water channels, also construction of temporary roads. Ordi- nary ditching alongside of embankments, from which the material is not removed more than two hundred feet, will not be paid for as excavation, but will be treated the same as borrow pits. In road alterations or changes of water courses, if the average distance hauled exceeds the average haul of the section, the contractor will be en- titled to an additional compensation of one cent per cubic yard, per hun- dred feet, for such excess. On sections where the excavation exceeds the embankment, the excess shall be deposited on the side of the embankment, on the side of the second track, or at such points as the Engineer may direct ; and this excess will be paid for as excavation oily. An additional price of one cent per cubic yard will be paid on such excess for every hundred feet haul beyond an average haul of five hundred feet. No spoil earth or other materials shall be deposited within ten feet of the slope of the excavation, but shall be placed at such a distance as in the opinion of the Engineer the safety of the road requires. The contract price for excavation will apply to pits required for founda- 1 66 SPECIFICATIONS. tions of masonry when water is not encountered. A price will be pu for excavation in water, which will only apply to foundation pits, and d( ening the channels for running water ; it must cover all classes of matei and include draining, bailing, pumping, all material and labor connec with such excavation, also the necessary dressing of the rock. Materials found in excavations applicable to useful purposes, sxicl building stone, gravel, stone suitable for ballast, and minerals, shall be aside for use in such places as the Engineer may direct, to be applied t or subsequently, to the construction of the road under the conditions specifications of this contract. On sections where the excavation does exceed the embankment, and rock, gravel or mineral taken from the cu piJed up for the use of the railway, a quantity of embankment, equiva to the quantity of material put aside, will be allowed the contractor. EmbankiJients. — The embankments to be formed 15 feet wide on the ■ unless otherwise directed, with slopes generally of i ^ horizontal to i verti Whenever the embankment is formed from ditching on either s such ditching, and the crests of the slopes thereof, shall in no case apprc within six feet, nor within double the depth of the ditch, of the foot of proper embankment slopes, allowing always one side for a double tn No soft mud or muck shall be allowed to enter the bank. Whenever w courses or new channels for rivers require to be formed, they shall be at such distance from the foot of the slope as the engineer may dir Care must be taken to exclude all perishable material from embankmen Embankments shall be built according to instruction from the Engin either by dumping from grade, or in layers of such thickness as he may quire. Such additional height above grade shall be given to embankmi as the Engineer may deem necessary to compensate for shrinkage washing, without additional allowance. Embankments about masc shall be built at such time and in such manner, and of such material as Engineer may direct. In sections where the embankment exceeds the excavation, the exi may be supplied from the sides of the adjacent cuts, on the site of the sec track, so as to increase regularly the width of such cutting, or from s other places as the Engineer may direct ; and no price shall be paid for creasing the width of such cuts, or for the earth borrowed for the emba ment, other than the embankment price, unless the average haul exce five hundred feet, when there tvill be an extra price paid of one cent cubic yard, per hundred feet of excess. In widening the cuts for mak up deficiencies in embankments, contractors are not expected or require( excavate hard pan, loose rock, solid rock, or iron ore, unless so directed the Engineer. In such cases, the contract price, less the embankm price, for said hard pan, loose rock, solid rock, or iron ore, will be allo\^ Macadamising. — Where alteration of roads or turnpikes requires mac amizing, the materials used must be composed of hard durable limestc furnished by the contractor, broken in fragments not greater than two ; SPECIFICATIONS. 1 6/ one-half inches in any direction, or of the old turnpike metal, and spread with such width and depth as may be required by the Engineer. These items will be paid for by the cubic yard. Tunnels. — Tunnels will be excavated for a single track, and will contain not less than ten cubic yards per lineal foot. The price for tunnel excavation will include all materials contained between the two portals, and within the area of its cross-section as determined by the Engineer. If the tunnel required support, and timber is adopted, the area of its cross-section will be measured three inches outside the lagging, or if mason- ry is adopted, the area of its cross-section will be six inches outside the wall or arch. The price also includes all temporary supports, such as props, scaffold- ing, etc. The Engineer will determine whether shafts shall be sunk, and the points for the location of the same. They shall contain not less than three cubic yards to the foot vertical. The price for the shaft excavation will include all materials contained between the surface of the ground and the soffit of the tunnel, and within the area of the shaft cross-section as de- termined by the Engineer. In case the shaft is sunk alongside the tunnel, it will include all material between the surface of the ground and the level of the foot of the shaft. The price must cover such curbing or other sup- port as the sides of the shaft may require ; also, whatever materials or labor required for ventilation, and keeping free of water, and will also cover hoisting and pumping machinery. All necessary wells or sumps will be paid for the same as shaft excavation. Falls that are attributable to the carelessness of the contractor, in the Engineer's opinion, shall be removed by the contractor at his own cost ; but if not thus attributable, a just and equitable allowance will be made. In case the tunnel requires permanent supporting, or the shafts lining, timber, brick or stone may be used as the Engineer may direct. Where timber is used, the Engineer will determine the kind and quality of timber, and will prescribe the general plan ; this will be paid for per thousand feet board measure. If bricks are used, they must be of the best quality of hard burnt brick, well tempered and moulded of the usual size ; must be nine inches long, two and one-half inches in thickness, and four and one-half inches in width, including mortar joint after being laid. No bats, cracked or salmon bricks, under any circumstances will be allowed in the work. The brick to be laid wet in the best hydraulic cement mortar, in such proportion of ce- ment and sand as directed by the Engineer. Grout will be substituted for mortar to such extent as directed by the Engineer. Joints to be well filled with mortar of such thickness and the bond such as the Engineer may pre- scribe. The exterior of the arch to be covered with a coat of hydraulic cement one-half inch in thickness. Suitable openings shall be left for the escape of water as directed by the Engineer. Where stone is adopted, it will be constructed of First or Second Class masonry, as directed by the Engineer. 1 68 SPECIFICATIONS. Vacancies behind the walls or above the arch will be filled with concrete or dry packing, as the Engineer may direct. The price per cubic yard of brick work or masonry will include the fur- nishing of all materials,, scaffolding, centering, and all other expenses ne- cessary to the construction and completion of the masonry or brick work. The price bid for shaft excavation is intended to pay for excavating, rais- ing, and placing the material in spoil banks; provided the haul from the top of the shaft does not exceed five hundred feet ; beyond that distance one cent per yard per hundred feet will be paid for such extra haul. The material moved in the slope over the portals of the tunnels shall be classified and paid for the same as the material in the approaches. The work must be carried on night and day, if so directed by the Engineer. Masonry. First-class Masonry. — Courses of stone in abutments, piers and walls are to be not less than ten, nor more than thirty inches thick, decreasing from the bottom to the top of the walls. Stretchers to be not less than two and a half feet, nor more than six feet long ; and not less than one and a half feet wide, nor less in width than one and a fourth times the depth. Headers must not be less than three and a half 'feet, nor more than four and a half feet long, where the thickness of the wall will admit of the same, and not less than one and a half feet wide, nor less in width than they are in depth of course. The joints well broken in no case less than twelve inches. Every stone must be laid on its natural bed ; all the stone for the abut- ments, piers, and tail walls will have their beds well dressed, parallel and true to the proper line ; the beds to be made always as large as the stone will admit of. Vertical joints of the face to be not less than eight inches in from the face, and as much more as the stone will work. No joint to be laid more than, one-half inch in thickness ; every second or third stone in each course must be a header properly arranged, and constituting one- fourth to one- third of the dressed stone in the wall. The whole of the masonry must be laid flush in good cement mortar. The backing shall be of good-sized, well-shaped stones, so as to break joints and thoroughly bond the work in all directions and have no spaces between them over six inches wide, and all spaces filled with small stones and spalls laid in cement. No hammering will be allowed after the course is set. If any inequalities occur, they must be carefully pointed off. The face of the masonry will be rock-work with drafts on the corners, and no projection of more than four inches from the proper lines (two inches in tunnels). The bridges, seats and tops of piers, abutments and tail walls are to be finished with a coping course of not less than ten inches in thickness, well bedded and jointed on longitudinal as well as lateral joints, and dressed to true surfaces on top, to project six inches or as the Engineer may direct. The foundation course must be of large flat stone. When iron bridges or iron viaducts are adopted, the pedestal stones must be of such size, shape and quality as di- rected by the Engineer. SPECIFICATION'S. 1 69 Scco)id-class Masonry- AVill be of broken range rubble masonry of supe- rior quality, with no stone less than eight inches in thickness, unless other- wise directed by the engineer, to be well bonded and levelled as well as may be without hammer dressing ; to be laid dry or flush in soft cement mortar, as directed by the Engineer, to have horizontal beds and vertical joints on the face. At least one-fourth of the stones in the face to be headers evenly distributed through the wall. No joint over three-quarters of an inch in thickness. The rear of the wall shall have good beds, joints and bonds, as tvell as stone of good quality and size. All the quoins to have hammer dressed beds and joints and drafted corners. The top of the wall to be coped with selected stone approved by the Engineer. The coping upon which the superstructure rests shall be dressed to a level bearing. First-class Arch Masonry — Shall be built in accordance with the specifica- tions for first-class masonry, with the exception of arch sheeting and ring stones. The rings shall be dressed to such shape as the Engineer shall de- termine. The ring stone and sheeting of the arch to be of stone not less than ten inches thick on the intrados of the arch. To be dressed with three- eighths of an inch joints and to be of full depth specified for thickness of arch ; the joints to be at right angles to the surface of the intrados, the face of sheeting stones to be dressed to make a close joint centering. The ring stone and sheeting shall break joints not less than one foot. The wings to be neatly stepped wdth selected stone the full width of wing, and not less than ten inches thick; no stone covered by the next one above less than one foot six inches ; or to be finished with a neatly capped newel at end of wing. The parapets to be finished with a coping course of full width of parapet with a projection of six inches. Stone to be not less than ten inches thick. Second-class Arch Masomy. — To be the same as second-class masonry, with the exception af the arch sheeting, for which proper stone shall be selected that shall have a good bearing throughout, and be well bonded and be of full depth of arch. No stone less than four inches in thickness on the intrados of the arch. Ring stones of all arches over eight feet span shall be dressed the same as specifications for first-class arch masonry. Dry Box CiUvert Masonry. — Will be laid with good square-shaped stone' of a size and equality approved by the Engineer, and in a manner satis- factory to him. For four feet from the ends the stone to be laid in good cement mortar. Culvert Masonry laid in Mortar. — Box Culvert masonry laid in mortar shall be of good selected building stone of good quality, and laid flush in good cement mortar to the satisfaction of the Engineer. The covering stone for all box culverts to be not less than ten inches in thickness, and to rest on the walls not less than fifteen inches. Drain Pipe. — In localities where but a small quantity of water passes, drain pipe will be substituted for culverts. Contractors will bid for furnish- ing and laying Akron vitrified stone pipe, or pipes of other manufacture 170 SPECIFICATIONS. that will stand equal pressure. Sizes of twelve, fifteen and eighteen inches will be used. Retaining Walls — Will be classed as second-class masonry laid dry. Slope Walls — Will be of sufficient thickness and slope as directed by the Engineer. The stones must reach entirely through the wall, not less than four inches thick, and twelve inches long ; joints close and free from spalls. The foundation must be prepared as directed by the Engineer. Rip Rap— Ox protection stone, shall consist of large (15 to 25 cubic feet) or small stone for the protection of masonry or earth work, as directed by the Engineer. Stone Paviiig — Will be made by setting stone on edge, from eight to fif- teen inches in depth, as directed by the Engineer. Cement mortar in all classes of masonry must be made of one measure of good hydraulic cement and two measures of clean, sharp sand (unless otherwise directed by the Engineer), well mixed together with water, in clean mortar beds, constructed of boards, and used immediately after being mixed. All classes of masonry laid in cement, must be neatly pointed with ce- ment mortar finely tempered. All stone for the different classes of masonry must be furnished from the best quarries in the vicinity, or such quarries as the Engineer may select. Seventy- five cents per cubic yard will be paid for every mile hauled after the first mile, and a proportional rate for every fraction of a mile. All stone transportation by water over one mile in distance, will be considered equiv- alent to one mile of haul by wagons. Brick masonry will be substituted for stone, at the option of the Engineer. No masonry of any kind will be covered up before being accepted by the Engineer. All masonry will be built according to the plans and instructions furnished by the Engineer, and will be estimated and paid for by the cubic yard, computing the actual solidity thereof No constructive or conventional measurement will be allowed, any rule or custom in the section of the country through which the road passes to the contrary notwithstanding. Foundations. The contractor will be obliged to excavate for foundations of masonry to such depth as required by the Engineer. In case of rock foundations the rock must be excavated to such depth as required, and must be made level by dressing to receive the foundation course. Paved Foundations. — Box culverts and small bridge abutments will have a paved foundation, if so directed by the Engineer; setting stones on edge, breaking joints, and extending across the entire width of the foundation. Timber Foundatio7is — Will be such as the Engineer may prescribe, and be paid for per thousand feet board measure, the price to cover furnishing material, framing, and putting in place. Necessary iron work shall be paid SPECIFICATIONS. I/I for per pound after being worked. The price paid shall C(j\'cr the cost of putting it in proper place. Fi/cS — Will be paid for per lineal foot, and shall not be less than ten inches in diameter at the small end, and shall be straight and sound. If required, shall be shod with wrought iron, which shall be paid for the same as other iron work in foundations. Piles must have the bark taken oft', and must be driven until they move not more than one-half inch to the blow of a hammer weighing not less than 2,000 pounds, with 30 feet fall. Only the actual number of feet of piles, timber, and plank, used and left for use in foundations will be paid for. The best cpiality of white oak, or other tim- ber equally good for the purpose, acceptable to the Engineer, shall be used in all foundations if accessible ; if not, such timber as can be procured in the locality, and in all cases it must be acceptable to the Engineer. Coffer-Davis. — Where coffer-dams are required for foundations, the prices bid for timber, piles, and iron, on the section will be allowed for said cof- fer-dams, and must cover all risks from high water and otherwise, draining, pumping, bailing, and all materials connected with the coffer-dams. Sheet piling will be classified as timber in foundations, and paid for per thousand feet board measure. Contractors bidding for masonry must also put in a price for foundations for the same. Bridges and Viaducts. Timber trestles, girder, and road bridges will be paid for per thousand feet board measure, computing the actual length of the stick of timber re- quired and left for use, and iron in the same per pound. The prices must cover all materials and labor requisite to completely finish the structure. For information in regard to bridges either in iron or wood, also iron trestles, see Specifications for Bridge and Iron Viaducts. General Co?tditio?is Applicable to all Work. All materials used in the construction of the road will be subject to the inspection and acceptance of the Engineer, who will submit them to such tests as he may desire. Commodious passing places, for public and private roads, shall be made and kept in good condition by the contractor, and he shall provide and- maintain good and sufficient fences, for keeping up enclosures and the pres- ervation of crops. The contractor will be held responsible for trespass or damage to the adjacent properties or the public, for any acts or omissions on the part of himself or his employes. Any parties under the direction of the engineer shall be permitted to pass or haul any material required for the road over any section, such persons not interfering with the work of the contractor. Right of way and neces- sary lands for borrow pits, spoil banks, channels, ditches, roads, etc., will be provided by the trustees, as early as practicable, but they are not to be held responsible for any delay caused by legal proceedings beyond their control. 1/2 SPECIFICATIONS. Contractors must carefully preserve bench marks and stakes ; in case of neglect they will be charged accordingly. Falls and slips, if not occasioned by the negligence of the contractor, are to be paid for the same as the regu- lar classification, except in tunnel excavation. The contractors shall take all risks from floods and casualties of every description, and shall make no charge for detention from such causes, but shall be entitled to a reasonable extension of the time for the completion of the work. The quantities marked on the profile are an approximation, and will not govern the final estimate. Disorderly and quarrelsome persons must be discharged by the contractor, if in the opinion of the engineer the good of the road requires it. Contractors will not themselves, nor by their agents, give nor sell any ardent spirit to their workmen, or any person at or near the line of the rail- way ; or allow any to be brought on the works by the laborers or any other persons, and will do all in their power to discountenance their use in the vicinity af the work by persons in their employ ; and they will not allow any person in their employ to commit trespass on the premises of persons in the vicinity of the works, and will forthwith at the request of the trustees or en- gineer, discharge from their employ any that may be guilty of committing damage in this respect. Contractors must satisfy themselves of the nature of the soil ; of the gen- eral forms of the surface of the ground ; of the quantity of materials required for forming the embankments or other work, and all matters which can in any way influence their contract ; and no information upon any such mat- ters derived from the maps, plans, profiles, drawings or specifications, or from the engineer or his assistants, will in any way relieve the contractor from all risks or from fulfilling all the terms of this contract. The contractors will remove, at their own expense, any materials disap- proved by the trustees or the engineer, and will remove and re-execute any works, without extra charge, and within such time as fixed by the engineer, appearing to the-trustees or the engineer, during the progress or within twelve months after completion, to be unsoundly or improperly executed, notwithstanding any certificate as to the due execution of the same. On 'their default, such work will be done by the trustees at the contractor's expense. The contractor will give personal attention to the work. The engineer shall have power to direct the application of force to any portion of the work which in his judgment requires it. And to order the increase or diminution of force at any point he may indicate. The contractor having the contract for graduation, before commencing his work, and immediately after signing the contract, shall open and main- tain a good and safe road, for passage on horseback, along the whole length of his work, and on portions of the road where there are no highways convenient for the wagoning of supplies, he must open and maintain such SPECIFICATIONS. / s roads, without charge therefor, and in his proposal must take this into consideration. The word *' Engineer" shall mean the consulting or principal engineer, unless otherwise expressed. Specifications for Bridges and Trestle- Work. Bridges will be constructed cither in /? way for a strain of twenty thousand pounds per square inch of area will be allowed. Bars subject to shearing strain shall be of the best quality of iron, and subject to such tests as the engineer may desire. Every bid must be accompanied by six specimen bars, one and one-half inches in diameter, and twelve inches long, stamped with the name of the bidder, and to be of the quality of iron that is intended to be used. All iron used must be equal in strength and all other qualities to the specimen bars. Cas/i/i^s must be made of good tough cast iron; metal not less than three-quarters of an inch in thickness and be subject to the following test : A bar of iron five feet long, one inch square, four feet six inches between supports shall bear a weight of five hundred and fifty pounds suspended at the center. The engineer may at any time require such specimen bars to be cast from the same metal as that used in the structure. No castings will be permitted except in the minor details. Work}>ia]t-sJiip. — All workmanship must be first class. All abutting joints must be planed or turned. One-sixty-fourth of an inch will be the maximum error allowed in eye bars, and not more than one-hundredth of the diameter of the pin or hole. In riveted work in joints shall be square and truly dressed. Rivet holes shall be spaced accurately and directly opposite each other. Rivets must be of the best quality of iron and must completely fill the holes. The area of rivets shall not be less than the sectional area of the joined pieces. Ends of bars having threads upon them must be enlarged beyond the diameter of the bar, enough to make the bar full size at the bottom of the thread. Washers and nuts must have a uniform bearing. All iron must be painted on all surfaces before leaving the manufactory with two coats of metalic paint and oil, and with a third coat of lead and oil after the structure is erected. Tiynber. The timber shall be of white or yellow pine, or other kind of timber ap- proved by the Engineer, free from wind shakes, large knots, decayed wood, sap or any defect that will impair its strength or durability. No sap angle will be allowed. All timber must be inspected by the Engineer and none used without his approval. All framing must be done in a thorough and workmanlike manner. Ties must be of the best quality of white oak, not less than thirteen feet in length. Must be placed one foot from centre to centre, and every alter- nate tie must be fastened to the stringer at both ends. Guard Timbers, six inches by eight inches, must be placed about one foot outside the rails, must be closely notched one inch on each tie and bolted to the ties every four feet. Angle Irons, three inches by three inches by three-eighths of an inch, must be spiked to the guard timber every eighteen inches alternately on the top and side. The spike holes must be counter-sunk to' receive the heads of the spikes. 176 SPECIFICATIONS. Wooden Bridges. ^ Angle-blocks, tubes, splicing keys, washers, parting blocks, brace-shoes, and bridge seats are to be made of cast iron. High hexagonal nuts are to be used; when used on truss rod, the nuts are to be dressed on both ends perpendicular to the line of the rods. Iro7i Trestle Work Will be built in spans of twenty feet or upwards in length ; supported by trestles in vertical sections of thirty feet and fractions of thirty feet, as each particular case may require. Trestle posts must be at least ten feet from centre to centre at the top. The trestle work will be measured and paid for as follows, viz.: — The entire length of trestle work, measured on centre li'ne of structure, from centre to centre of end pins at so much per lineal foot ; trestles per vertical foot, measuring from the top of the masonry to the bottom of the stringers. Materials in trestles must be proportioned to support the corresponding spans. General Conditions Applicable to Bridges and Trestles, Contractors must furnish and put in place wall-plates, stringers, cross-ties, guard rails and angle irons, over piers and abutments of all structures, so as to connect the roadway of the structure with the ballasted track. No extra allowance will be made for the same. The contractor shall take all risks from floods and casualties of every de- scription, and must furnish all materials and labor incidental to or in any way connected with the manufacture and erection of the structure. Meastirement. — Iron and combination bridges are to be measured from centre to centre of end pins. Wooden bridges are to be measured from out to out of end posts, whether the bridge be of one or more spans. The following diagram shows the section of floor on all structures where wood stringers are used, and where the opening between floor beams is thirteen feet. When the opening is increased or diminished the stringers will be proportioned accordingly. The track stringers must be securely bolted to the floor beams, and covered with No. 15 galvanized iron thirty inches in width for the entire length. All bridges or trestle work must be completed ready for the rails. SPECIFICATIONS. 17/ The contractor will not be obliged to raise the iron bridges or trestles in the mountains until transportation can be had by rail. River Navigation. Where rivers are navigable they must at all times during the construction and erection of the bridge be kept free for navigation. All coffer-dams and other obstructions must be removed by the contractor, Avhen directed by the engineer, leaving the river entirely unobstructed, ex- cept the actual space occupied by the masonry. Tests. Before the final estimate is paid, a thorough test of the structure will be made by the engineer, by loading each span with such rolling load, at such rate of speed, as described under the head of rolling load, and also by caus- ing the load to remain on each span for the space of one hour or more. And each span must return to its original camber when the load is removed.* The word '' engineer " shall mean the Consulting or Principal Engineer, unless otherwise expi^ssed. Specifications for Sixty-Pound Iron Rails. GeneraJ Clause. — The weight of the rail is to be sixty pounds per lineal yard of rail. The rail must be in every respect according to tracing and template, and of uniform section throughout the whole length. The maxi- mum allowance to be admitted in the sectional dimensions must not exceed 4V of an inch. Pile and mode of Manufacttire.-- The piles for the rail must be composed in weight of thirty-five per cent, of the best crystalline hammered iron for the head ; thirty per cent, of good sound puddled bars, rolled from ham- mered blooms, for the stem : and thirty-five per cent, of the best fibrous iron for the bottom flange. The top and bottom slabs are to be of the same length and width as the pile; the other slabs must all lay flat, breaking joint laterally and of the same length as the pile. No short pieces will be allowed in the pile. The pile must be heated in the furnace with the part corresponding to the top of the rail, up ; it must first be hammered under a five-ton hammer, or compressed in rolls at a slow motion to secure a thorough welding of all parts ; reheated and then rolled. " The new bridge of the Cincinnati Southern Railroad Company over the Ohio at Cincinnati was tested on Thursday, November 8th, 1877, with satisfactory results. The bridge spans the river at a point nearly a mile below the suspension bridge, and is nearly half a mile in length. It is the seventh bridge built over the Ohio, and the third at this point. It was built by the Keystone Bridge Company, of Pittsburg, for about 8750,000, and is regarded as one of the cheapest pieces of work in bridge build- ing in the West. The test consisted in running trains of increasing weight over each span in succession, with such stops and sudden jerks as were needed to prove thoroughly the strength of the structure. First, a single engine was sent across, then two engines, then three, and so on up to seven ; then four cars, loaded with fifteen tons of rails each, were added, making the total weight upon a single span 3880 tons. Under this immense pressure the total deflection of the channel span, which is 520 feet in length, was less than two mches. — Philadelphia Public Ledger. L 178 SPECIFICATIONS. PATTERN or Cutting of Ends. — The ends must be cut square with the axis of the rails^ and must show a smooth surface, clean, compact, and without defect. Straightening.. — The rails must be straightened on the four sides while hot. The straightening is not to be made by percussion, but by screws or cams. Reheating any part of the rail will not be allowed. The surface of the rail must be smooth and without any defects, such as cracks, blisters, welding seams, etc. No patching of de- fects will be allowed. Drilling and Pujiching. — The rails must be punched or drilled at the ends in accordance with the tracing, the allowance tolerated in the dimensions of the holes or notches and the dis- tance between them must not exceed one thirty- second of an inch. The holes must be cylin- drical, and punched or drilled so as not to show any projection beyond the uniform surface of the rail. Length. — The rails must be thirty feet in length each. Ten per cent, of their numbers will be allowed of shorter length down to twenty-four feet, but they must all be of an even number of feSt, and must not vary therefrom more than one- PATTERN OF "H'jMr'r''',, .. . ,, Weight. — An allowance of two per cent, each ^'^^^ riA/L ^^y fQj- individual rails, and of one per cent. ^C'/lLKy^ each way for the whole quantity of rails received^ will be made in weight. If too light, the rail will be rejected ; if too heavy,, it will be accepted at the nominal weight with the two per cent, allowance added. Marking. — Each rail must be marked about two feet from the ends with the maker's mark and the year and month in which it was rolled ; the letters and figures must be distinct and not less than one inch in height. Every approved rail must be marked with the Inspecting Engineer's pri- vate stamp, otherwise it will not be accepted. Inspecting and Testing. — The rails will be inspected by an engineer in- lots of one thousand bars. Five rails out of a lot will be selected by the in- spector and submitted to the following tests : — Each of the selected rails must carry seven and one-half tons in the center between bearings, four feet apart in the clear, for five minutes, with a deflection not exceeding one-quarter of an inch, and must come back to its original line when the weight is removed, within to^o^ of an inch. In the same position, the rails must carry fifteen tons in the center be- tween bearings for five minutes without breaking. The rail will then be SPECIFICATIONS. 1 79 broken in two and each half submitted to one blow of a hammer weighing 600 pounds, and falling six feet vertically. The bearings for the rails must be four feet apart in the clear, and made of cast iron, fastened on oak frames supported by stone pillars with solid foundations at least three feet below the surface. The section of the broken rail must show a clean and compact metal throughout, free from cinders, welding seams, or other imperfections denoting impurity or imperfect welding. The head of the rail must show on top at least three-quarters of an inch of small grain, hard iron; the bottom flange of the rail must show all fibrous iron; and the remainder of the section a gradual mixture of grain and fibre. Should one of the rails fail under any of the foregoing tests, five more will be selected out of the same lot and similarly tested; if more than ten rails have failed, the whole lot of one thousand bars to which they belong will be rejected. The Inspecting Engineer will have free entry to the works, and full power to inspect the manufacture at any time, to satisfy himself that the rails are being made in accordance with the stipulations of this agreement; any remark which he may have to make will be addressed to the manager of the works, and not to the workmen. Certificate. — A certificate will be delivered by the Inspecting Engineer for each lot of rails approved and stamped. No part of the work will be done by any other manufacturer without the express consent of the trustees. Guarantee. — The rails will be guaranteed for three years after laid in track. The value of all rails which within that period of time will show material signs of imperfections or weakness will be refunded to the trustees at the rate of $25 per ton, the rails remaining the property of the trustees. This clause will not apply to rails laid within one thousand feet of stations or in yards. Ohio River Bridge Specifications. Fotmdations. South Abutment. — The south abutment will rest on a pile foundation. The top of the platform must be at least six feet below the present surface. It must be of one layer of white oak timber, twelve by twelve inches, laid with close joints and fastened to the caps by drift bolts. Caps must be of one stick of white oak, twelve by twelve inches, and fas- tened to the piles by drift bolts. Piles must be of the best quality of white oak ; they must not be less than twelve inches in diameter at the small end, and must be straight and sound; the bark must be taken off; they must be driven to the rock, and, if required, shall be shod with wrought iron. Any pile injured by driving must be withdrawn and replaced with another. The platform must be thoroughly grouted before the first course is laid. After the piles are ' 1 80 SPECIFICATIONS. capped the material must be excavated to a depth of two feet below the top of the caps, the excavation extending two feet outside the platform, on all sides ; . and the spaces under, above and around the platform, not occupied by the masonry, must be filled with concrete one foot above the top of the platform. The remaining space must be filled with the material excavated. Pters. Pier No. i. — Pier No. i will rest on a pile foundation. The same speci- fications will apply to this as for the south abutment. Pier No. 2 {Pivot Pier). — This pier will rest on a limestone stratum two feet and eight inches in thickness, as shown in the elevation drawings. The top of the rock must be made level by dressing the same to receive the foundation course, and the space between the excavation and the masonry must be filled with rock to the level of the bed of the river. Pier No. 3. — This pier will rest on the six feet eight inch stratum of lime- stone, as shown in the elevation drawing. The top of the ledge must be excavated one foot to receive the foundation course. The space between the rock and masonry must be filled with concrete. The balance of the space between the excavation and the masonry must be filled with broken rock. Pier No. 4. — This pier will rest on the same stratum of rock as Pier No. 3. The specifications applying to foundation of Pier No. 3 will also apply to this foundation. Pier No, 5. — This pier will rest on the same stratum as Piers Nos. 3 and 4. The specifications applying to foundations of Piers Nos. 3 and 4 will also apply to this foundation, with the exception of excavating one foot in the rock, in lieu of which the top of the ledge must be made level by dress- ing the rock. Pier No. 6. — This pier will rest on the six feet stratum of limestone, as shown in elevation drawings. The top of the rock must be leveled by dressing the same, and foundation pit filled up to the present surface with the material excavated. In all the foregoing described fblmdations the pits must be kept dry while the masonry is being laid. Masonry. The stone for the masonry must be of the best quality of limestone. The courses must not be less than eighteen inches nor more than thirty inches thick, decreasing uniformly from the bottom to the top of the walls. Stretchers to be not less than two and one-half feet nor more than six feet long, nor less in width than one and a fourth times the depth. Headers must noi be less than three and a half feet nor more than six feet long, and not less in width than they are in depth of course. The joints must be well broken^ and in no case less than sixteen inches. Courses of stone will be continuous around and through the walls. Every stone must be laid on its natural bed, and have both beds well dressed, parallel SPECIFICATION'S. l8l and true to the proper line. The beds to be made always as large as the stone will admit of. Vertical joints of the face to be not less than twelve inches in from the face, and as much more as the stone will work. Particular care must be taken to have them well filled v/ith mortar. No joints to be laid more than five-eighths nor less than three-eighths of an inch in thickness. Every second or third stone in each course must be a header ; headers must be properly arranged, and constitute one-fourth to one-third of the dressed stone in the wall. The whole of the masonry must be laid flush in good cement mortar, made of one measure of good hydraulic cement and two measures of clear, sharp sand, well mixed together with water, and used immediately after being mixed. The backing shall be of good sized well shaped stones of the same thick- ness as the face stones, with their beds well dressed parallel and true to the proper line, and arranged so as to break joints, thoroughly bonding the work in all directions, having no spaces between them over six inches wide. All the spaces must be filled with small stones and spalls laid in cement. One course must be impervious to water before the next is laid. No ham- mering will be allowed after the course is set. The face of the masonry will be rock work, with drafts on the corners, and with no projection more than three inches from the proper line, except the cut w^ork shown in the detail drawings, which is to be bush-hammered. The bridge seats, tops of piers, abutments, and tail walls, are to be fin- ished in accordance with the detail drawings. The coping stones must be of the size and shape shown in the drawings. Must be well bedded and closely joined on all sides. Wrought iron clamps must also be used as shown on drawings. All necessary drilling and dressing must be made to receive the iron work to insure a close fit. On the Pivot Pier, iron work for the float, as shown in the drawing, must be inserted as the work progresses. All the masonry must be neatly pointed with cement mortar finely tem- pered. No masonry will be laid in freezing weather. Concrete must be made by measure of four parts of sound broken lime- stone of uniform size (that will pass through a two inch ring), two parts of clean, sharp sand, and one part of good hydraulic cement, all well mixed together before being put in place, and well rammed in layers of about one foot thick. All materials used (stone, cement and sand) will be subject to the in- spection and acceptance of the Engineer, who will submit them to such tests as he may desire. Superstructure, The superstructure of this bridge will be of iron, with the exception of cross-ties and auard timbers. 1 82 SPECIFICATIONS. Bidders will furnish a general plan, with detail drawings and diagrams of strains for each span, otherwise their tender will not be received. The bridge must be not less than fourteen feet in width in the clear, and not less than eighteen feet six inches in height in the clear, measuring from the top of the rail. The road-way on each span will be constructed so as to leave on the rail only one- half of the camber of the truss. The channel span of the bridge shall not be less in width than twenty feet from centre to centre of trusses. The draw must be geared for both hand and steam power, so as to turn either way. All machinery for the same must be furnished and put in place by the contractor. The hand gearing must be so arranged that two men can easily turn the draw, in a calm day, in two and one-half minutes. Steam power must be applied of sufficient capacity to turn the draw in one minute, with a pressure of forty pounds to the square inch. The bearing of the ends of the draw on the piers must be firm, so as to insure a smooth track for the passage of trains. All locks must be worked by gearing from the centre of the draw, and be self-adjusting when the draw is six inches out of line. Not more than three feet and three inches shall be occupied from the base of the rail to the lowest point in the superstructure of the bridge. [Note. — The requirements for Rolling load. Dimensions of Parts, Quality of Iron, Workmanship, and Timber, are the same as those previously given m these Specifications.] River Navigation, The river must at all times during the construction and erection of the bridge, be kept free for navigation of steamers, coal fleets, tows of all kinds, and rafts. All coffer-dams and other obstructions must be removed by the con- tractor, leaving the river entirely unobstructed, except the actual space occupied by the masonry. Risks. The contractor shall take all risks from floods and casualties of every de- scription, and must furnish all materials and labor incidental to or in any way connected with the construction and erection of the bridge. Time. The bridge hereby contracted for shall be commenced on or before the 25th March, 1875, and be completed according to the foregoing specifica- tions in compliance with the attached contract by 31st December, 1876. The word "Engineer" shall mean the Consulting or Principal Engineer, unless otherwise expressed. Tests. Before the final estimate is paid, a thorough test of the bridge will be made by the Engineer, by loading each span with such rolling load, at such SPECIFICATIONS. 1 83 rate of speed, as described under the head of rolling load, and also by causing the load to remain on each span for an hour or more. The deflection of each span during; the tests made by the engineer must not be more than the following : — For the five hundred and twenty feet span, five inches. For each of the three hundred feet spans, three inches. For the one hundred and ten feet span, one and one-tenth inches. For each span of the three hundred and seventy feet draw, one and eight-tenths inches. And each span must return to its original camber when the load is removed. Mo}ithly Estimates. The Engineer will establish from the amount of the bid a scale of prices to serve as a basis for the estimation of the value of the work done each month. Chane'es. The Trustees reserve the right to change the depth of the foundations, and sizes of the piers and abutments, as described in the foregoing pages. 184 SPECIFICATIONS. Freight Locomotive, "Consolidation" Pattern, For the Lehigh Valley Railroad, \feet S}i inches gaitge, cite coal. Cylinders Diameter .... Stroke of piston Length of steam-ports Width of steam-ports Width of exhaust-ports Travel of valve Outside lap of valves Inside lap of valves . Exhaust nozzles, variable. Wheels. Diameter of driving wheels ..... Diameter of truck wheels ...... Diameters between centres of front and driving wheels Total wheel base of locomotives ..... Total wheel base of locomotive and tender Diameter of driving-axle journals .... Length of driving-axle journals ..... Diameter of main crank-pin bearing .... Length of main crank-pin bearing .... Boiler. Outside diameter of smallest ring of boiler Thickness of boiler plates (iron) Number of tubes ...... Length of tubes ...... Outside diameter of tubes ..... Length of fire-box inside , . . . . Width of fire-box inside ..... Depth of fire-box inside (sloping) Thickness of fire-box plates (steel), side and back Thickness of flue-sheet ..... Thickness of crown-sheet ..... Square feet of grate surface .... Square feet of heating surface in fire-box . Square feet of heating surface in tubes Total square feet of heating surface . Weight, Weight of engine in working order . Weight of engine on driving wheels . e-. Fuel J Anthra- I ft. 8 inches. 2 ft. I ft. 4 '' 3^2 " 4 ft. 2 ft. 2^ inches 6 14 ft. 22 ft. 9 " 10 " 46 ft. 2 " 7 " 8 5 5 " ^ It. . 198 lift. 2 " .' 9 ft. 10 '* 2 ft. 9X " AVA —55 " 5 11 1 G % " v^. "■ 27.6 . 149 . II32 . I28I . 100,000 pounds. . 88,000 i i CONSOLIDATION PATTERN. SPECIFICATIONS. i8s Rc7}iarks. Locomotives of this class have been used on the Lehigh Valley Railroad since 1866, in which year the locomotive *' Consolidation,'' from which the class has taken its name, was built by the Baldwin Locomotive Works in accordance with the plan and specifications furnished by Mr. Alexander Mitchell, then Master Mechanic of the Lehigh and Mahanoy Railroad. On this division of the Lehigh Valley Railroad, over maximum grades of one hundred and twenty-six feet per mile, the maximum load is thirty-five loaded four-wheeled coal cars (three hundred and twenty-nine gross tons of cars and lading), and the usual load twenty-five loaded four wheeled coal cars (two hundred and thirty-five gross tons of cars and lading). On the same division, over a grade of seventy-six feet per mile, one of these engines draws a maximum train of one hundred and forty empty four- wheeled cars (four hundred and seventy-six gross tons), at a speed of eight miles per hour. Its usual train is one hundred empty cars (three hundred and forty gross tons). Compared with the '^ Ten-Wheeled'' pattern of locomotive, cylinders eighteen by twenty-four, driving wheels four and four and a half feet diameter, weight on driving wheels about sixty-thousand pounds, the performance is as shown in the following table : — Grade 126 feet per Mile. Grade 76 feet per Mile. Gross Tons of Train. Gross Tons of Train. Maximum Load of '' Consolidation" Locomotive, « of " Ten-Wheeled" Usual « of " Consolidation" " " of " Ten- Wheeled" ^' 329 235 235 169 to 200 476 340 340 221 Consumption of fuel — "Consolidation" Engine, 3^4^ tons daily. " Ten-V^heeled" 3X The ordinary repairs for a series of years have been one mill per mile run greater for the '^ Consolidation" than for the " Ten-Wheeled " engine. On the Wyoming Division of the same railroad, from Sugar Notch to Fairview, the grade is one in fifty-five (ninety-six feet per mile) for twelve miles in length, combined with curves of eight and ten degrees radius. The curves are frequent, and there are but two tangents, each less than one mile long, in the whole twelve miles. Up this incline engines of this class can take forty loaded four-wheeled coal cars. The usual train is thirty-five such cars, which are taken at a speed of twelve miles per hour. The cars weigh, each, three gross tons, eight hundredweight, and carry, each, six gross tons of coal. The weight of train, therefore, which a " Consolida- tion" engine takes up the grade combined with curves, as stated, is from three hundred and twenty-nine to three hundred and seventy-six gross tons.* * For specifications of engines, with dimension details in inW, s&& Ma^iual /or Railroad E>igi- neers, by George L. Vose, C. E., Professor of Civil Engineering in Bowdoin College. 1 86 SPECIFICATIONS. Freight Locomotive, "Mogul" Pattern, For the Doj?i Pedro Segmido Railway of Brazil. Catige, Sfeel 3 inches. Fuel, Bituininozis CoaL Cylinders. Diameter . Stroke of piston Length of steam-ports Width of steam-ports Width of exhaust-ports Travel of valve Outside lap of valves Inside lap of valves . Exhaust nozzles — double, variable. Wheels. Diameter of driving wheels .... Diameter of truck wheels .... Distance between centres of front and rear drivin wheels ........ Total wheel-base of locomotive Total v/heel-base of locomotive and tender Diameter of driving-axle journals Length of driving-axle journals Diameter of main crank-pin bearing Length of main crank-pin bearing . Boiler. Outside diameter of smallest ring of boiler Thickness of boiler plates (iron) Number of tubes Length of tubes Outside diameter of tubes Length of fire-box inside Width of fire-box inside , Depth of fire-box inside ... Thickness of fire-box plates (copper) side, back, an front sheets . Thickness of flue-sheet Thickness of crown-sheet (steel) Square feet of grate surface Square feet of heating surface in fire-box Square feet of heating surface in tubes . Total square feet of heating surface Tender. Number of wheels . Diameter of wheel Diameter of tender-axle journals Length of tender-axle journals Capacity of tank 1 ft. 2 ft. I ft. 15 ft. 22 ft. 44 ft. 159 II ft. 5 ft. 2 ft. 5 ft. 16 103 937 1040 6 inches. 4 H 4 ft. 6 2 ft. 6 inches. 3 7 8 aVz CI 4 ft. 3 inches. 1% 2 5 3X Weight. Weight of engine in working order Weight of engine on driving wheels Weight of tender, empty 2 ft. 4 inches. 3^ " 7 2000 gallons. 80,000 pounds. 68,000 " 20,000 '' MOGUL PATTERN. ^L^^^ -^Ui a;: i ' ERN SPIXIFICATIONS. 187 Passenger Locomotive ''American" Pattern. For the Pentisylvania Railroad Covipauy. Consiritcted in accordayice with drawi7igs furnished by the Compnyiy. {^Pennsylvania Railroad Com- pany's '^ Class C") Gau(^c 4 feet 9 inches. Fuel, Biiuminoiis Coal. Cylinders. Diameter Stroke of piston Length of steam-ports Width of steam-ports Width of exhaust-ports . Travel of valve Outside lap of valves Inside lap of valves Exhaust-nozzles — double. Wheels Diameter of driving- wheels Diameter of truck-wheels Distance between centres of front and wheels ...... Total wheel base of locomotive Total v;heel-base of locomotive and tende Diameter of driving-axle journals Length of driving-axle journals Diameter of main crank-pin bearing Length of main crank-pin bearing . Boiler. Outside diameter of smallest ring of boile Thickness of boiler-plates (steel) Nnmbtr of tubes Length of tubes Outside diamcicr of tubes Length of fire-box inside . Width of fire-box inside . Depth of fire-box inside . Thickness of flue-sheet . Thickness of sides, back, and crown-shee Square feet of grate surface Square feet of heating surface in fire-box Square feet of heating surface in tubes Total square feet of heating surface Te7ider. Number of wheels .... Diameter of wheels ... Diameter of tender-axle journals Length of tender-axle journals Capacity of Tank . Weizht, Weight of engine in working order Weight ot engine on driving wheels Weight of tender empty . rear drivins- I ft. 5 inc] 2 ft. I ft. 4 " ^]i '' 2X " 5 Y. " none. 5 ft. 2 2 ft. 4 inches. 8 ft. 22 ft. 44 ft. 6 SH 7 2>Y 3Y 4 ft. 155 10 ft. 6 ft. 2 ft. 5 ft. i}i inches. 5 << 1 "G 8 2X " 7 " 18 106 971 1077 8 2 ft. 9 inches. 3% " 7 '• 2400 gallons. 71,300 pounds. 45,80c 22,000 '' i88 SPECIFICATIONS. Specification '^ C " For Boiler Tank Cars, ioo Barrels Capacity, Empire Trans- portation Company, Adopted December, 1876. 1st. In these specitications reference is to be had to any accompanying drawings, and also to the sample car when furnished. These specifications to be followed when they differ from the drawings or. car, and they and the drawings to be followed when they differ from car. Builders in all cases do, by contracting to build, agree to indemnify and save harmless the Empire Transportation Company from all patent right claims. The make and char- acter of wheels, axles and springs to be determined by the Empire Trans- portation Company, and the said Company reserve the right to require changes from these specifications, drawings, and sample car. Boiler. 2d. Capacity of boiler not to be less than one hundred, nor more than one hundred and one barrels of forty-five gallons each. No variation from this size will be permitted. The gallon referred to contains two hundred and thirty-one cubic inches. 3d. The material composing boiler to be as follows : The shell and dome (except as hereinafter specified) to be made of a good quality of No. 7 wrought-iron boiler plate, weighing not less than seven and one-half pounds to the square foot. The heads of boiler, of like plate, five-sixteenth inches thick, weighing twelve and one-half pounds to the square foot ; and such iron as requires flanging must be charcoal boiler-plate. All of the boiler iron composing the shell and dome must be guaranteed by the builders to be capable of resisting a tensile strain of not less than 50,000 pounds to the square inch. In these specifications, the Birmingham Wire Gauge is adopted as the standard for indicating the thickness of all plate irons. 4th. The boiler to be cylindrical in form, same as sample car. The shell to be composed of seven rings, each ring to be formed by two plates of SPECIFICATIONS. 189 proper dimension to make the average inside diameter of cylinder sixty-six and one-half inches, and the length of boiler sides two hundred and ninety- three inches. The heads of boiler to be convex, each head forming the segment of a sphere, the versed sine of each segment to be seven inches, making the length through the axis of cylinder three hundred and seven inches. The form over which the flanges of heads are turned or formed must have a ^adius of not less than two inches. The under side plate, form- ing in part the first ring at cither end of boiler must be of No. i boiler-plate iron, having a thickness of five-sixteenth inches. The under side plate forming in part the five intermediate rings of boiler, must be of No. 3 boiler- plate iron, having a thickness of one-quarter inch. 5th. Each boiler head to be strengthened by a thrust plate, this plate to be of the same quality of iron as the heads (No. i boiler plate); said plate to extend horizontally across either head at a point twelve inches up from lowest point of head; that portion of the plate coming in contact with the side of shell to be flanged, overlapping sides and extending back sufficient to be taken in by the rivets securing head, &c. All joints to be thoroughly caulked ; and all joints that cannot be caulked without, must be filled with copper gaskets. Every description of joint must be perfectly oil tight. 6th. The dome to be forty inches in diameter, and twenty-four inches in height from top of boiler to top of dome side. Top of dome to be convex, raised ia centre four and one-half inches. Dome to be secured to boiler on the centre of the centre ring. The centre ringof boiler should have a length between vertical seams equal to the diameter of base of dome, including flanges. Boiler to have two three-quarter inch holes at lowest points inside of dome marked a a on drawing, and a hole through shell immediately under centre of dome of sixteen inches diameter. 7th. The space between centre of rivets must not exceed one and one- half inches. All vertical and horizontal seams in boiler, except those around manhole, valve chamber, base of dome and the seams in dome, must be double riveted with a lap of three and one-quarter inches. Size, quantity and location of rivets are as follows : Location of Rivets. SIZE LOCATION. NUMBER. DIAM. LENGTH IN. IN. Rivets securin g horizontal joints, 716 % X ^ vertical ' '■ 2176 % X v^ dome to boiler, 92 % X % '' head, 80 % X I vertical joint in dome. 20 % X ^ valve chamber, 21 % X 2 manhole base. 30 /2 X 2 [Note. — Variations from the above sizes must be made at points where two or more sheets of unequal thickness come in contact. For example, 190 SPECIFICATIONS. where -f-f^ and X inch iron is joined J4 x i inch rivets must be used. When X 3.nd -ro in. iron is joined )4 x i}i in. rivets must be used. Rivets secur- ing thrust plate, boiler head and sides must he )4 x i}4 inches. All rivets to be iron of best quality.] 8th. Each boiler to be provided with one manhole and cover, located and secured in the centre of dome head, constructed and arranged substan- tially as the Sample. Each boiler also to be fitted with one discharge-valve, of the pattern and manufacture which may be prescribed by the Empire Transportation Company, located at the lowest point on the under side of shell immediately under the dome. The valve stem to extend upward through the dome to a point near top of manhole, through which valve is to be operated. The top end of valve stem is held in position by a wrought- iron bracket secured to under side of dome head, as seen in sample and drawing. 9th. Discharge valves to be fitted with oil-tight caps, secured to frame of car by movable collar and chain. The various kinds of caps, keys, man- holes and discharge valves to be uniform in size and construction, and each variety to be interchangeable with its class. loth. No tank will be considered as accepted from builders until it has been thoroughly inspected and its capacity and tightness satisfactorily dem- onstrated by water test, and by at least two trips of actual service. I ith. Plan of constructing boiler tank car frame is fully and clearly shown in the drawings and sample car. The gas pipe tubes marked No. 4, used instead of wooden side-sills, must have an outside diameter of three inches, and an inside diameter of two and one-half inches. Extra strong timbers to be of the best quality of white oak, and all iron work not herein otherwise described, to conform in size and quality to that of sample car ; except wheels, axles, bearing and draw springs, which shall be as may be specially provided. Wheels to be accurately fitted on axles to gauge furnished by the Empire Transportation Company. 1 2th. Trucks for one hundred barrel tank cars, to be uniform in style and construction with Empire Line standard trucks, except in the wheels, axles and bearing springs. Bearing springs must have a freight carrying capacity of not less than fifteen tons. Wheels to be of a like strength and weight as those used under the ''Pullman parlor cars." Size of axle as follows : Length finished, . . . .6 feet " of journal, '' of collar, *' from back journal shoulder to " of wheel seat. Diameter of axle at hub, " " " middle, . '^ " " wheel seat, *' of back journal shoulder, '' of journal, " of collar, ** of concave shoulder back of wheel seat, wheel seat, II inches. 7 oH 2 6X 4H A aH Ah 3K aH 5 SPECIFICATIONS. I9I Axles will be tunied up with a concave shoulder back of wheel scat. Any thickness of iron over the diameter indicated must be turned off with a gradual taper toward centre. Wheels to be forced on axle with a pressure of not less than twcnty-hve tons. 13th. Flooring of boiler cars to be wrought iron No. 14 wire gauge. The iron to be neatly fitted around the boiler, leaving a space between floor and boiler of one inch. The floor to be secured to wooden stringers A by ^ x 2 inch lag screws to the tubes No. 4 by hooked bolts, and to the brackets by rivets. At no point must the iron floor be permitted to come in contact with the boiler. 14th. Cars to have a hand railing on either side made of three-quarter- inch gas pipe, supported by iron post secured to outer ends of brackets. Length of hand railing to be twenty-four feet eight and one-half inches. Height from the floor thirty-two inches. 15th. Boiler to be neatly fitted at ends between the timbers marked F on drawing. These timbers to be worked into shape conforming to that of boiler heads. The interstices between boiler heads and timbers must be substantially caulked with oakum, so that there can be no possible longitu- dinal motion of the boiler. To further secure the boiler from lateral move- ment, the straps x i will have knuckle joints formed in their longitudinal centres. On top of and to boiler on a line with the straps, wrought-iron lugs will be secured. Through these the knuckle joint bolt will pass; thereby firmly holding and preventing lateral twisting of boiler on car frame. 1 6th. Cars to have brakes on each truck, connected with an equalizing lever, as shown on drawing and sample car. Oil boxes must be provided with patent spring lids, manufactured by Kinzer & Jones, of Pittsburg, Pao Journal bearings to be of phosphor bronze and brake shoes malleable iron All bolts and nuts to be filled in accordance with the Cumming's lock nut patent. Painting. 17th. All the iron work, except boiler and dome to be painted black ; the wood work to have two coats of Brandon yellow, ground and mixed in pure linseed oil ; boiler and dome to have three coats of paint over every part of their surface. The first coat coming in contact with the iron must be brown, metallic paint. The other two coats must be pure white lead or zinc. Each car to have two cast-iron card cases, and two sets of cast-iron figures, denot- ing car No. They and the card cases to be secured to outside of sills, and painted white, emblems, lettering and figures to be as per sample car, unless otherwise specified. Before painting, boiler and dome must be cleaned on its external surface from rust, scales, grease and all dirt.* *A11 the Empire Transportation Go's specifications are followed by bills of materials, giving dimen- sions and positions of the parts in the cars. These are omitted here as being beyond the scope of this work. 192 SPECIFICATIONS. Specifications For Box Cars, Empire Transportation Company, Adopted July, 1872. Revised July, 1873, Revised July, 1875. First. — In these specifications reference is to be had to any accompany- ing drawings, and also to the Sample Car when furnished. These specifi- cations to be followed when they differ from drawings or car, and they and the drawings to be followed when they differ from car. Builders in all cases do, by contracting to build, agree to indemnify and save harmless the Empire Transportation Company from all patent right claims. The make and character of wheels, axles and springs to be determined by the Empire Transportation Company. The Empire Transportation Company reserve the right to require changes from these specifications, drawings and sample car. No car will be consid- ered as accepted until inspected and approved by the Company's Superin- tendent of Cars. Seco7id. — All material used in the construction of these cars to be of the best quality, and workmanship first-class. All timbers must be dressed on all their sides, and conform to the sizes and character of wood hereinafter specified. Siding boards to be of white pine, smoothed and beaded, and they and the roofing boards to be free from all loose knots, cracks and decay. That portion of the floor immediately over the body bolster must be of dry white oak. Third. — Car covering to be A. P. Winslow's Patent Iron Roof, put on as directed by the Winslow Roofing Co., and under their immediate super- vision. The iron must be galvanized, unless otherwise directed. SPECIFICATIONS. 1 93 Dimensions of car body as follows : Extreme length of main frame, 29 ft. 5;^ in. Length of box frame, not including siding, 27*" 10 " Width '* " '* '' 8 " o '' Height from bottom of side sill B to top of plate K, . 7 '' 2 " Curve of roof, o ** 4 " Side sills B and centre stringers C must not be gained at bolsters or tran- soms. Intermediate stringers D, are to be gained at bolster, and also transoms. Mode of gaining stringers D shown on drawing. Fourth. — Each car to be fitted with two grain doors, same as in sample car ; also with two cast iron card cases, secured to siding near car door, as shown on drawing; also with an iron threshold at each door, fitted between door posts, and secured to top of floor ; also with a full set of bearing and draw-springs, and double mouth draw heads. All bolt heads and nuts, coming on inside of car, must be sunk tlush with the inside surface, except those in top plates. Fifth. — Car wheels to be broad- tread, diameter thirty- three inches, fitted on hammered axles, four and three-eighth inches in diameter by six feet nine and one-half inches long. Wheels to be correctly fitted to gauge fur- nished by Empire Transportation Co. The trucks to be uniform in style and construction with trucks under sample car, unless otherwise specified. Body truss rods to be provided with turn-buckles, or their equivalent. Drawheads to be made of wrought- iron, strengthened at back end, such as that made by Berry, Courtney & Wilson, Pittsburg. Sixth. — The following directions are to be strictly observed in turning up each car axle : all inside angles are to be turned concave ; the shoulder back of wheel seat must be turned entirely off with a gradual taper. Finished size of axle as follows : Extreme length, 6 ft. 9^ in. Button on end of axle, 4)^ in. diam. % in. long. Journal, 3X " '' SV^ " " Space between wheel seat and journal. -4^ '' " 2 " ^' Wheelseat,. 4yV " " 2 '' " Seventh. — Number of car to be stamped with three-fourths inch figures on ends of body-bolster, and also on ends of truck bolsters. Eighth. — All joints, tenons, and mortices to be coated with a solution composed of lime and sulphate of copper, to prevent decay. Ni?ith. — End sills A to be painted over their external surface. Ends of side sills B, and stringers C and D to be coated with paint, about one foot back from end sills, before box-frame has been erected. The under sides of side sills B to be thoroughly coated with paint their entire length, after siding has been put on. Car to be painted with yellow oxide. Emblem, vermillion red on white field, of size and position shown on drawing. Eight inch white letters and M 194 SPECIFICATIONS. figures on side of car, unfinished block, and six inch figures on ends, same style and color. Tenth. — Cars to have brakes on each truck, connected with equalizing lever, as shown on drawing and sample car. Eleventh. — Cars to have the patent Oil Box Lid manufactured by Kinzer & Jones, of Pittsburg, Pa. Twelfth. — Cars to have Phospher Bronze Bearings and Malleable Iron Brake Shoes. Thirteenth. — All Bolts and Nuts to be fitted in accordance with the Cam- ming Lock Nut Patent. Specifications For Rack Cars, Empire Transportation Company, Adopted July, 1872. Revised July, 1873, Revised July, 1875. First. — In these specifications reference is to be had to any accompany- ing drawings, and also to the sample car when furnished. These specifica- tions to be followed when they differ from drawings or car, and they and the drawings to be followed when they differ from car. Builders in all cases do, by contracting to build, agree to indemnify and save harmless the Empire Transportation Company from all patent right claims. The make and character of wheels, axles and springs to be determined by the Empire Transportation Co. The Empire Transportation Company reserves the right to require changes from these specifications, drawings and sample car. No car will be considered as accepted until inspected and approved by the Company's Superintendent of Cars. Second. — All material used in the construction of these cars to be of the best quality, and workmanship first-class. All timbers must be dressed on all their sides, and conform to the sizes and character of wood hereinafter specified. SPECIFICATIONS. 1 95 Slatting boards to be of white oak, smoothed, and they and the roofing boards to be free from all loose knots, cracks and decay. That portion of the floor immediately over the body bolster must be of dry white oak. Slatting from floor to belt rail to be closed tight. Above belt rail to be spaced with five inch slatting, and space between slatting three inches. Belt rail V to be secured to each post and braces by two rivets, made of }i inch iron, at corners. Where belt rails intersect, they are to be secured by the combined angle and lug bolt. Third. — Car covering to be of white pine boards, one inch thick, matched, planed and painted. Dimensions of car body as follows : Extreme length of main frame 36 ft. 6 in. Length of rack frame, from out to out of corner posts. .35 " 2 '^ Width " '' '' '' " -. 8 " II '' Height from bottom of side sill B to top of plate E 7 " 4 '' Curve of roof o" 4." Side sills B and centre stringers C must not be gained at bolsters or tran- soms. Intermediate stringers D are to be gained at bolster, and also transoms. Mode of gaining stringers D shown on drawing. Fourth, — Each car to be fitted with two cast iron card cases, secured to siding on either side near car door, as shown on drawing ; also with a full set of bearing and draw-springs, and double mouth draw-heads. All bolt- heads and nuts, coming on the inside of car, must be sunk flush with the inside surface, except those in top plates. Fifth. — Car wheels to be broad-tread, diameter thirty-three inches, fitted on hammered axles, four and three-eighths inche:; in diameter by six feet nine and one-half inches long. Wheels to be correctly fitted to gauge fur- nished by Empire Transportation Co. The trucks to be uniform in style and construction with trucks under sample car, unless otherwise specified. Body truss rods to be provided with turn-buckles, or their equivalent. Drawheads to be made of wrought- iron, strengthened at back end, such as that made by Wilson & Leggett, Pittsburg. Sixth. — The following directions are to be strictly observed in turning up each car axle : all inside angles are to be turned concave; the shoulder back of wheel seat must be turned entirely off with a gradual taper. Finished size of axle ^as fc)llows : Extreme length 6 ft. 9j^ in. Button on end of axle \\i in. diam. Y^ in. long. Journal 3X ^' " 5^ '' '' Space between wheel seat and journal- .4>^ *' *' 2 " '' Wheelseat 4iV " '' o '' " Seventh. — Number of car to be stamped with three-fourths inch figures on ends of body-bolster, and also on ends of truck bolsters. 196 SPECIFICATIONS. Eighth. — All joints, tenons and mortices to be coated with a solution composed of lime and sulphate of copper, to prevent decay. Ninth. — End sills A to be painted over their entire external surface. Ends of side sills B, and stringers C and D to be coated with paint, about one foot back from end sills, before rack-frame has been erected. The un- der sides of side sills B to be thoroughly coated with paint their entire length. Car to be painted with yellow oxide. Emblem, vermillion red on white field, of size and position shown on drawing. Eight inch white letters and figures on side of car, unfinished block, and six inch figures on ends, same style and color. Tenth. — Cars to have brakes on each truck, connected with equalizing lever, as shown on drawing and sample car. Eleventh. — Cars to have the patent Oil Box Lid manufactured by Kinzer & Jones, of Pittsburg, Pa. Twelfth. — Cars to have Phospher Bronze Bearings, and Malleable Iron Brake Shoes. Specifications For Stock Cars, Empire Transportation Company, Adopted July, 1873. Revised July, 1875. First. — In these specifications reference is to be had to any accompanying drawings, and also to the sample car when furnished. These specifications to be followed when they differ from drawings or car, and they and the draw- ings to be followed when they differ from car. Builders in all cases do, by contracting to build, agree to indemnify and save harmless the Empire Transportation Company from all patent right claims. The make and character of wheels, axles and springs to be determined by the Empire Transportation Company. The Empire Transportation Company reserves the right to require changes from these specifications, drawings and sample car. No car will be con- sidered as accepted until inspected and approved by the Company's Super- intendent of Cars. Second. — All material used in the construction of these cars to be of the best quality, and workmanship first-class. All timbers must be dressed on all their sides, and conform to the sizes and wood hereinafter specified. Slatting boards to be of white oak, smoothed, and the roofing boards to be free from all loose knots, cracks and decay. That portion of the floor immediately over the body bolster must be of dry white oak. Slatting from floor eighteen inches up to be closed tight to within three inches of belt rail, SPECIFICATIONS. 19/ then to be spaced with five-inch slatting, and space between slatting to be three inches. Belt rail V to be secured to each post and braces by two rivets, made of ^s-inch iron. At corners where belt rails intersect, they are to be secured by the combined angle and lug bolt No. 23. Third. — Car covering to be of white pine boards, one inch thick, matched, planed and painted. Dimensions of car body as follows. — Extreme length of main frame 29 ft. 5] in. Length of rack frame, from out to out of corner posts. 28 '*' i " Width " " '' '' 8 " II '^ Height from bottom of side sill B to top of plate \\. . . " '- 4 '* Curve of Roof - o '' 4 " Side sills B and centre stringers C must not be gained at bolsters or tran- soms. Fourth.' -Y.2iZ\\ car to be fitted with two cast-iron card cases, secured to siding on either side near car door as shown on drawing ; also with a full set of bearing and draw springs, and double mouth draw-heads. All bolt heads and nuts coming on the inside of the car must be sunk flush with the inside surface, except those in top plates. Fifth. — Car wheels to be broad-tread, diameter thirty-three inches, fitted on hammered axles, four and three-eighths inches in diameter, by six feet nine and one-half inches long. Wheels to be correctly fitted to gauge fur- nished by the Empire Transportation Company. The Trucks to be uniform in style and construction with trucks under sample car, unless otherwise specified. Body truss rods to be provided with turn-buckles or their equivalent. Draw-heads to be made of wrought iron, strengthened at back end, such as that made by Wilson, Leggatc & Co., Pittsburg, Pa. Sixth. — The folloiving directions are to be strictly observed in turning up each car axle : — All inside angles are to be turned concave : the shoulder back of wheel seat must be turned entirely off with a gradual taper. Finished size of axle as follows : Extreme length 6 ft. 9^ in. Button on end of axle 4's in. diarn. ^s in. long. Journal y,i '' sH " Space between wheel seat and journal. .4>^ ^' 2 " Wheel seat 44ii " Seventh. — Number of car to be stamped with three-fourths inch figures on ends of body bolster, and also on ends of truck bolsters. Eighth. — All joints, tenons and mortices to be coated with a solution composed of lime and sulphate of copper, to prevent decay. Ninth. — End sills A to be painted over their entire external surfaces. Ends of side sills B, and stringers C and D to be coated with paint, about one foot back from end sills, before rack frame has been erected. The under sides of side sills B to be thoroughly coated with paint their entire length. 198 SPECIFICATIONS. Car to be painted with yellow oxide. Emblem, vermillion red on white field, of size and position shown on drawing. Eight inch white letters and figures on side of car, unfinished block, and six inch figures on ends, same style and color. Tenth. — Each car to be provided with two hatch holes in roof, located on either side of roof, four feet eight inches from ends of car. Dimension of hatch covers 19X22 inches. Eleventh.— Q2X to have double brakes operated from either end. One brake wheel to be operated from top of car, and one from the end. Twelfth. — Cars to have patent oil box lid manufactured by Kinzer & Jones, of Pittsburg, Pa. Thirteejith. — Cars to have phospher bronze bearings, and malleable iron brake shoes. Specifications FOR Butter and Egg Cars, Empire Transportation Company, Adopted November, 1876. 1st. In these specifications reference must be had to any accompanying drawings, and also to the sample car when furnished. These specifications to be followed when they differ from the drawings or car, and they and the drawings differ from the sample car. The specifications of the Empire Line standard box cars adopted, will be the specifications for the butter and egg cars, except in the following particulars. Lining. 2d. The car to be lined above the belt rail including sides, ends and roof of seven-eighth inch or three-quarter inch white pine boards, dressed and matched. Lining must be dry and of a fair quality, free from loose knots, cracks and other objectionable features. Before the lining has been nailed in place, thick air-tight paper must be introduced between it and the posts and braces. The paper to be so joined and fitted as to be as near air-tight as possible. This paper must be introduced back of all the lining, at ends, sides and roof, below as well as above belt rail. Inside Doors and Wichets. 3d, Each car to have double inside doors on either side of car. The in- side doors to be constructed of two inch thickness of one inch white pine boards, dressed and matched, with the lining paper introduced between them. Each door to be in four sections of equal dimensions, each section to be hinged to the door posts by two twelve inch strap hinges, and opening inward. One of the lower sections in either door to be so hinged that they SPECIFICATIONS. IQ'J can when desired be lifted off. In one of the upper sections in either door, there must be a wicket, twenty-three inches wide by twenty-seven inches high, hinged at the top and opening outward and upward, and held open when desired by an iron arm pivoted to wicket, the loose end being held in position by a cast-iron rack secured to the door. The wicket when closed will be secured by a gravity button. The several sections of the doors when closed will be secured by staples and gravity hooks. The wickets to be made in the same manner as the door. Icing Doors, Ventilators, &^c. 4th. Each car to have two icing doors, one at each end of car. The doors to be arranged to open by sliding to the left. Ventilators like the sample furnished, will be fitted in the icing doors. Registers will be attached to the inside of doors immediately over the air-vent. These registers will be made of galvanized iron, about No. 20, and so arranged as to be readily and easily operated by the hand through the partially opened door. The doors will be constructed with a rim surrounding the entire door, and projecting inward sufficient distance from the inside plane of door to protect the register from coming in contact with the siding when the door is moved back and forth. The sliding arrangement of the icing doors will be similar to the large side doors ; the top guide will be supported by a suitably formed wooden rail, and secured by lag screws ; the bottom guide will be supported by cast-iron brackets, and also secured by lag screws. The doors when closed will be secured by a hasp, staple and pin, or by some other suitable means that may be hereafter decided. Ice Box. 5'th. Each butter and egg car to have two iron ice boxes, one fitted in either end of car. The boxes to be made of No. 11 common plate iron. The size of box to be as follows: Length seven feet five inches; height, three feet four and one-half inches ; width, two feet two inches. The form of box to be as shown in the drawing and sample car. The top to be circu- lar, having a radius of seven inches. The front to be parallel with the end of car. The back to be parallel with the front, from the bottom up to a height of sixteen inches, from which point the back is inclined forward suffi- cient to meet the curved top. The lower angles of the front and back will be formed with a radius of four inches. The angles at ends niay be either circular or square, as the builder may decide to flange the ends or introduce angle iron in uniting the corners. The boxes must be caulked and made water-tight, from and including the bottom up to a height on a line with the bottom of icing doors. In the front of box there must be an opening conforming in size and position of end icing doors, hereinafter given. Waste Pipe and Register. 6th. Each ice box to have a waste pipe, of which the conducting tube is to be gas pipe, having an inside diameter of t^vo inches. The pipe to be attached to box and extend down and throu'^h the car floor about three 200 SPECIFICATIONS. inches below its under side. The position of pipe is shown in drawing and sample cnr. Ice boxes must each have a register in their back, located im- mediately inside and back of the ventilator in icing doors. The register will be arranged so as to be operated from the inside of car. The area of the opening in the register must not be less than area of the opening in the ventilator. There must not be any openings between the ice box and the end of car around the icing door. Should the box not fit up tight at all points around the door by reason of the curved top, any opening that may thus occur must be suitably closed up, so that no air can pass into the car except through the register in back of box. Securing Ice Box. 7th. The ice boxes are to be secured in place as follows : At a height of thirty-three inches from floor, wooden cleats five by seven inches will be bolted to posts and braces, the cleats extending across the car end and along the sides a distance equal to the width of box. The box resting on these cleats is further secured by seven anchor bolts, secured to box either by rivets or bolts. The thread end of bolts pass out through end of car to which the boxes must be substantially and securely held. Four of the anchor bolts secure the bottom of box and three the top. The edges of the iron box around the icing doors will be secured by wood screws. Sweating Drip. 8th. Each icing box must have attached thereto a sweating drip made of No. 24 galvanized iron. The drip to extend over the entire under side of box bottom, and up the sides and ends a sufficient distance to catch any dampness that may trace down them. The top edge of iron forming drip should be finished with an iron frame, made of one-eighth by three-quarter- inch iron, extending around the back and ends of box, to this the top edge of iron should be securely and neatly riveted, keeping the iron frame on the inside next to ice box. There must be a space of not less than three-quarter inches between drip and bottom of ice box. Strips of some durable mate- rial, and of proper dimensions, may be introduced between drip and box bottom to preserve a uniform space. For protection the under side of drip will be cased with one inch white pine boards, matched and dressed. The casing boards to extend across the car, resting on the cleat at front and ends. Both the casing and drip will be further supported by four iron straps made of one-quarter by one and one-half inch iron ; the straps will be secured at their front ends to the cleat, and extend back underneath the drip casing, and up the back of box a sufficient height to secure it thereto. Each sweat- ing drip must have a waste pipe, the conducting tube to be gas pipe, having an inside diameter of one and one-half inches. The tube to extend from drip down through the car floor, about three inches below its under side. Size and Position of Iciitg Doors. 9th. Icing doors are located central from either side, and from top of floor to bottom of door the measurement should be four feet. The dimen- sion of door to be twenty-five inches wide by twenty -three inches high. SPECIFICATIONS. 201 Tray in Ice Box. loth. Each ice box must have a wooden tray, covering the entire bottom inside. The tray to be made of ash or oak slats, three inches wide by three- quarter inches thick. The slats to be supported and secured to four battens, two inches wide by three-quarter inches thick. The battens running with the length of the box. Pai)iting. nth. Painting of body, trucks, figures, letters and emblems, to be uni- form with Empire Line standard box cars, except that the position of the emblem will be changed, and have the lettering ''Butter & Egg Car" painted in a circular form above it. 1 2th. For a full and clear understanding of any obscure passages that may occur in these specifications, reference must be had to the drawings, sample car, and also to oral explanation. The Empire Transportation Com- pany reserve the right to change or modify any plans herein specified, as experience may demonstrate desirable. Specifications For Gondola Cars, Empire Transportation Company, Adopted July, 1872. Revised July, 1873, Revised July, 1875. First. — In these specifications reference is to be had to any accompany- ing drawings, and also to the sample car when furnished. These specifica- tions to be followed when they differ from drawings or car, and they and the drawings to be followed when they differ from car. Builders in all cases do, by contracting to build, agree to indemnify and save harmless the Empire Transportation Company from all patent right claims. The make and character of wheels, axles and springs to be determined by the Empire Transportation Company. The Empire Transportation Company reserves the right to require changes from these specifications, drawings and sample car. No car will be considered as accepted until inspected and approved by the Company's Superintendent of Cars. Second. — All material used in the construction of these cars to be of the best quality, and workmanship first-class. All timbers must be dressed on all their sides, and conform to the sizes and character of wood hereinafter specified. That portion of the floor immediately over the body bolster must be of dry white oak. Third. — Dimensions of car body as follows : Extreme length of main frame 36 ft. 3 in. Length of box, in the clear 34 " o " Width " " 8 '' 6X '' Height from bottom of side sill to top of plate 2^2 '^ 202 SPECIFICATIONS. Side sills and centre stringers must not be gained at bolsters or transoms. Intermediate stringers are to be gained at bolster, and also transoms. Mode of gaining stringers shown on drawing. There must be a space be- tween the side and floor of at least ^ inch maintained by cast-iron washers. Fourth — Each car to be fitted with two cast iron card cases, secured to side of car, as shown on drawing; also with a full set of bearing and draw- springs, and double mouth draw-heads. All bolt heads and nuts, coming on the inside of car, must be sunk flush with the inside surface. Fifth. — Car wheels to be broad-tread, diameter thirty- three inches, fitted on hammered axles, four and three-eighths inches in diameter by six feet nine and one-half inches long. Wheels to be correctly fitted to gauge fur- nished by Empire Transportation Co. The trucks to be uniform in style and construction with trucks under sample car, unless otherwise specified. Body truss rods to be provided with turn-buckles, or their equivalent. Drawheads to be made of wrought-iron, strengthened at back end, such as that made by Berry, Courtney & Wilson, Pittsburg, Pa. Sixth. — The following directions are to be strictly observed in turning up each car axle ; all inside angles are to be turned concave ; the shoulder back of wheel seat must be turned entirely off with a gradual taper. Finished size of axle as follows : Extreme length 6 ft^ 9X in. Button on end of axle 4^ in. diam. yi in. long. Journal SX'' *'' 5^'' " Space between wheel seat and journal. -4^ '^ ^' 2 '' " Wheelseat 4^ " ' Seventh. — Number of car to be stamped with three-fourths inch figures on ends of body-bolster, and also on ends of truck bolsters. Eighth, — All joints, tenons, and mortices to be coated with a solution composed of lime and sulphate of copper, to prevent decay. Ninth. — End sills to be painted over their entire external surfaces. Ends of side sills and stringers to be coated with paint, about one foot back from end sills, before the box has been erected. The surfaces of side sills to be thoroughly coated with paint their entire length. Cars to be painted with yellow oxide. Emblem, vermillion red on white field, of size and position shown on drawing. Eight inch white letters and figures on side of car, unfinished block, and six inch figures on ends, same style and color. Tenth. — Cars to have brakes on each truck, connected with equalizing lever, as shown on drawing and sample car. Eleveiith. — Cars to have the patent Oil Box Lid manufactured by Kinzer & Jones, of Pittsburg, Pa. Twelfth. — Cars to have Phospher Bronze Bearings and Malleable Iron Brake Shoes. Thirteenth. — All Bolts and Nuts to be fitted with the Cummings Lock Nut Patent. QUESTIONS. 203 QUESTIONS ON THE THIRD CHAPTER. Page 55. What is a specification ? What should it contain ? Mention the principal elements in the specifications for the Harbor Improvements at Cedar Keys. Page 56. What additional data is necessary to complete the information to bidders ? What precautions are taken to prevent fraud ? Page 57. State the elements in the S. for a Stone Breakwater at Block Island. What is rip rap ? What a spar derrick .? Give any reasons that may suggest themselves for the several restrictions in this S. Page 59. Analyze the S. for a Breakwater of Cribwork at Cleveland. Define shakes, counterhewed, assemble, drift bolt, mauled. What are the elements in the S. for the Iron Landing Pier at Lewes, Del ? Give the re- quirements in the case of the shafts, braces, forgings, castings, testing and delivery. Define swedged, scarf, ^turn buckle, body bound, lugs, etc. Page 6^. What are the contents of the S. for Removing Snags from the Minnesota River ? Define snags. How are measurements made ? Page 64. What are the general divisions of the S. for the Tennessee River Improvement? How are the bids to be made in this case ? What is the object of sections 6, 7 and 9 ? What allowance is made for extra haul? What is the object of provision No. 22? What is to be understood by earth excavation, hard pan, and loose rocks, solid rock, and old masonry? How is the masonry classified? and define each variety. How is it to be bid for? Mention the precautions enjoined in laying the masonry. What is the object of the 31st requirement? What proportion of sand is to be used with the cement and water? Define grouting, bond, hollow quoins, mitre sill, pitched, bush hammered, spalling, pointed down, "constructive measurement." What conditions must be fulfilled in the ingredients of the cement and in the sizes of the stones and their bond? How is the concrete composed and what instructions are given for mixing ? Where may it be used? Page 71. Where is the dam located for which S. are given on this page ? State its dimensions, form of cross-section, and general arrangement. What should the bids include ? What distinction is made between rock and earth excavation ? Of what is the puddling composed and how laid? What are coffer dams ? How are the foundations to be prepared ? State the require- ments of the stone work. In making concrete what proportion, by bulk, of the ingredients is prescribed ? How are the slope walls to be laid ? State the requirements in the case of the rip rap, cement, sand and mortar. What are the requirements for laying masonry, and for the timber work? 204 QUESTIONS. How are the various materials to be measured ? Mention some of the gen- eral conditions. What are the terms of payment ? What provisions are made in case of failure ? Page ']'], Describe the manner of arranging the foundation for the South West Ledge Light-House, Long Island. Give a general description of the building with the means of access. Define templet, tap screw, tap bolt, channel and angle-iron, cleat, parting strip, jamb, lintel, architrave, rebate, countersunk, pilaster, frieze, plancier, fuscia, stop bead, ogee, hood, dia- mond checkers, shanks, soffits, puiiine strips, pinnacle. Under what heads are the items in the S. for a Sewer arranged? What are the conditions in case of ordinary excavation ? what for rock work, refilling, embankment brickwork, stone masonry of the various kinds indicated? What are the provisions for making and mixing mortar, concrete ? Describe the method of preparing the piles and timber foundations. How are the manholes to be constructed ? connections with sewers how made ? What general condi- tions are imposed ? Define the technical terms found in these S, What are the stipulations concerning the execution of work, materials, and labor, interference with travel and works, damages and penalties, and payments ? Page no. Give the general divisions of the S. for a college building. What special provisions are made in the case of the excavation ? Page III. Of the stonework? Page 113. Brickwork? Define footings, broken range rock work, water table, square droved, cornices, gables, belt courses, drafted, chamfered, re- veal, stripping grounds, raked out, dashed and broomed, girder, beam, struck joints, parget, haunches. Page 114. Describe the nature of the wood and carpenter work. Give the dimensions of the studs. What is meant by bridged ? Page 115. How is the wall plate secured? (Note. — The student should analyze in this manner the remainder of these specifications. ) Page 142, In the S. for a wrought iron bridge, what conditions are re- quired for the wrought and cast iron ? How are the bids to be rendered ? Page 150. What is included under the head of Graduation ? How are all cuttings to be measured ? What are included under the heads of earth, loose rock, and solid rock? Page 151. What are the prescribed widths of road bed for the several kinds of cuts and fills? the slopes? State the conditions given for remov- ing material. What becomes of the excess of excavation or waste? How much ground should be cleared and why ? Define slashed and term ditch. What disposition is to be made of valuable rock or timber removed from the line? What are the stipulations relative to a change of location or grade ? Page 152. How is travel on common roads provided during construction in their vicinity ? How is the masonry classified ? What are the least di- mensions for a box culvert? How are foundations to be arranged ? The abutment walls and covermff are how built ? How must foundations for QUESTIONS. 205 arched culverts in compressible soils be arranged ? What kind of masonry is prescribed for the walls? What bond? Describe the foundations for bridge masonry ? What arc the three classes ? Page 154. Describe rock range, range and rubble. What are the con- ditions in the case of vertical and sloping retaining walls ? State the gen- eral ree|uiremcnts. Page 155. The bids are to include what? Define rip rap and its use. Give the stipulations in case of delay and extra work. State the require- ments for sills when used in the superstructure. Page 156. For cross-ties, chairs, and joints and rails. How is the track to be laid, and what allowance should be made for expansion of rails ? Page 157. What are the stipulations concerning the delivery of materi- als ? How are fences to be constructed and paid for : Page 158. What are the conditions relating to a change in the amounts of work, concerning workmen, monthly estimates and extra work ? May sub-contracts be entered into ? Sec. Page 161. How is tunnel work classified? What are the neat lines? What disposition is to be made of the excavated material ? What should the estimate per cubic yard include ! How are shafts to be paid for ? Page 162. What is a perch of masonry in these S. ? What are the re- quirements for masonry ? How are the faces to be trimmed ? What re- cesses and opening are to be provided and why ? Describe the arch work of stone, of brick. Page 163. What is the backing, and how is it laid? How are the ap- proaches to be finished? How are the shafts to be finished up? What provision is made for drainage ? Who provides the lime and cement used and why Page 164. What is the contractor's duty in case of delay? What items are included under the general specifications for the Cincinnati Southern R. R. ? What other items are to be included in the contract price for exca- vation ? Page 165. Describe the nature of the road and widths of road bed? How are excavations classified and define the subdivisions. How is the ditching paid for? What additional compensation is allowed when the haul- ing for road alterations, &c., exceeds the average distance ? Where is the waste to be deposited ? Spoil banks where ? What is included in the item for excavation in water ? Page 166. What disposition is to be made of useful excavated material? Give the widths for the embankments inclination of slopes. State the re- strictions when embankment is formed from ditches. How is the shrinkage provided for? What are the regulations for borrowed materials ? How is macadamizing to be done ? Page 167. The price for tunnel work is composed of what items ? How are the measurements to be made ? Give the conditions in the case of shafts. What provision is made for falls ? What are the requirements for 206 QUESTIONS. timbering and arching in brick ? What provision is made for the escape of water ? Page 1 68. Note carefully the requirements in the various classes of ma- sonry. Of what is the back filling composed ? What should the prices for masonry include ? for tunnel and shafts ? How much is allowed per yard for hauls exceeding 500 feet ? Page 169. When may drain pipe be used and what conditions must it fulfill? Page 170. What are the proportions for mixing cement mortar? How is masonry to be paid for ? How are paved foundations to be arranged ? timber ? Page 171. Give the required dimensions of piles and degree of penetra- tion. How are payments to be made ? How are bridges to be estimated ? Mention some of the general conditions applicable to all work. Page 173. What are the dimensions in the clear for through bridges ? What test must they stand ? Define camber. Page 174. What are the limits of tensile and shearing strains ? What factor of safety is used for compressive strains ? Describe the quality of the iron to be used and its tests ? also of castings ? What are the maximum allowable errors of workmanship ? Page 175. How many coats of paint are required? \ Page 176. What are the general conditions applicable to bridges and trestles? Page 177. What final test is required? Rails. Mention the require- ments for iron rails, method of manufacture, cutting, drilling, and straight- ening. Page 178. How should they be marked, inspected and tested? Page 179. What guarantee is required? Bridge over the Ohio River , C. S. R. R. Describe the foundations for the abutments, piers and draw pier. What is the bed rock ? Page 181. What proportions are required for the components of con- crete ? Page 182. Give the dimensions in the clear of the bridge. What are the general specifications concerning the river navigation, risks, time, tests, estimates and changes ? The student should be required to prepare the specificatioas for any piece of work to be selected by the professor. CHAPTER IV. A DVERTISEMENTS. Under this head it will only be necessary to give Generaiinstruc- a few forms as guides to show what features should ^^°"^- be prominently mentioned in such publications, and to call attention to the fact that all public works, whether for the Government, State, city, county, or borough, are generally required by law or ordinance, to be advertised for a certain length of time and to a cer- tain extent before letting. In some instances the particular news- papers are mentioned, but generally those having the widest circulation are selected. It will be expedient for the engineer to inform himself as to the local requirements on this point before closing his contract, as legal objections have been sustained to contracts on the grounds that they were not properly advertised. It should be remembered that the object of adver- q^^^^ ^f advertis- tising is to bring into active competition all those who "^^• may be interested in and capable of performing a certain kind of work, and hence it should be done in such manner and localities, as to reach the greatest number of bidders. In general, the ad- vertisements should be addressed to them as a class, Headings. as, e.g. "Proposals to Iron Manufacturers," "To Ship Builders," &c. The law as passed by Congress, 2d March, 1 86 1, in relation to advertising for proposals for Governuient supplies or services, is as follows :- "All purchases and contracts for supplies or services in u. s. law concem- any of the departments of Government, excepting for per- ^"s advertisements, sonal services, shall be made by advertising, a sufficient time previously for proposals respecting the same, when the public exigencies do not require the immediate delivery of the articles or performance of the service. When immediate delivery or performance is required by the public exigency, the 208 ADVERTISEMENTS. articles or service required may be procured by open purchase or contract at the places and in the manner in which such articles are usually bought and sold, or such services engaged, between individuals.''* The advertisement should be concisely worded, and yet be suf- ficiently explicit as to the information required by persons desir- ing to bid, to prevent unnecessary delay. It should what should be 1 ., . 1 -11 17-7/- 7 - 1 shown in the adver- exhibit, when practicable, the kind of work^ material tisement. or service required to be done or furnished; the approximate amounts of each as determined by the preceding estimate ; the time required for its completion, the place where the labor is to be performed or the goods delivered ; when and where drawhtgs^ or the work itself, may be inspected ; any general conditions or in- structions with which bidders are expected to comply ; the na^nes and addresses of the parties proposing to have the work done ; the time before which all bids must be presented and the manner of presentijig them^ with any suggestions that may be deemed necessary. The manner of assembling these various items will be clearly illustrated in the carefully selected advertisements which follow. All of the general conditiotis need not be published as a part of the public advertisement, but should be printed upon the blanks delivered to bidders, as they form part of the requirements of the contract. * % 3709> Revised Statutes, U. S. advertisements. 2o9 Ad\'ertiseme.\ts for Proposals for U. S. Government Works. Under t/ie direction 0/ the U. S. Corps of Engineers.* Harbor and River Improvements. Unitkd States Ekgineers' Office, 1 No. 40 Church Street, > Mobile, Alabama,(i) April 7th, 1S77. j Sealed proposals, in duplicate- for dredgincc^ 20,000 cubic Advertisement for ,4, 111 T , r , drcdgm- at Cedar yards, more or less, through the bar at the mouth or the Keys, Florida. harbor of Cedar Keys, or in the channel between the bar and Cedar Keys, Florida,^ will be received at this office" until 12 M., Tuesday, May 22, 1877,^ and opened immediately thereafter. ** A guarantee will be required that within ten days after notification of the award of the contract, contract shall be entered into.^ Printed blank forms of proposals and guarantee, specifications, instructions to bidders, and any desired information can be had on application to this oiftce. ^ "" (Signed,) Seepages 55, 2x9. 251. ^^ ^^ DAMRELL, ' ' Captain Engineers, U. S. A, (i) Address. (2) Manner of Presenting. (3) Nature of work. (4) Amount. (5)Location. f6) Where addressed. (7) Bidding close. (8) Proposals opened. (9) Security required for beginning work. (10) General information. (11) Party letting work as agent for the United States. Proposals for Rip Rap Granite. Engineer's Office, U. S, A., ? Newport, R. I., Feb. 22, 1877. > Sealed proposals will be received at this office, until 10 o'clock A. M. on the twenty-second day of March, 1877, for Rip Rap granite For a Rip Rap. for Breakwater at Block Island, Rhode Island. Specifications in regard to the work, and blank forms for proposals and guarantee, upon which all bids must be made, will be sent on application to this office. G. K. WARREN, Major E7igi7ieers, and Brevet MaJor-Ge?ieral, U. S. A. See pages 57, 219, 251. * N. B. — For the corresponding Specifications, Bids or Proposals afid A g'reemettts a.ccom'p3Xiy\x\^ these advertisements see the chapters on these subjects. They are separated here for purposes of class- ification and reference, but all belong together andjbrtri essential parts of a complete contract. N 2 1 ADVERTISEMENTS. Removing Obstructions in East River and Hell Gate,, New York. Army Building, Houston and Greene Sts., ? New York, Oct. 5, 1876. 5 Sealed proposals in duplicate will be received until noon For dredgmg and of October iS, 1876, for removing about 24,000 tons of grappling for rock. broken rock from Hallet's Point Reef, Astoria, N. Y. Proposals will be received only from parties having machines capable of resisting collisions. For forms of bids and other information apply at this office, JOHN NEWTON, Lieutenant-Colonel Engineers, Breijet Major-GeneraL See pages 58, 219, 251. For Breakwaters and Piers. Engineers' Office, U. S. Army, No. 120 Pearl Street, Buffalo, N. Y., March 26th, 1877, J Extension of Cleveland Breakwater. Sealed proposals in duplicate addressed to the undersigned, will be re- ceived at this office until ten o'clock A. M. Monday, May 7th, 1877, for the extension of the shore-arm of the Cleveland Breakwater. Bids for iron material will be entertained from iron dealers only ; other bidders must bid for each and every item, excepting iron. Further information, with printed forms upon which all bids must be made, can be obtained at this office. Approxi7nate Quantities of Material. 175,000 ft. b.m. Hemlock Timber. 140,000 " *' Pine Timber and Lumber. 1,500 cords Rubble Stone. 1,000 tons Block Stone. 1,500 lbs. Screw Bolts. 25,000 " Drift Bolts. 2,200 '* Spikes. C. E. BLUNT, Lieut. Col. of Engineers, U. S. A, See pages 59, 219, 251. Iron for Landing Pier near Lewes, Delaware. U. S. Engineers' Office, No. 1328 Chestnut Street, Philadelphia, Pa., March 31, 1877 \ Sealed proposals in duplicate will be received until 12 For an iron landing o'clock, noon, of Monday, the i6th day of April, 1877, for P'*^^- iron for this work. Drawings can be examined and further information obtained at this office. J. D, KURTZ, Lieut. Col. of Efigineers. See pages 61, 219, 251. A1)\ERTISEMENTS. 2 I I Removal of Snags, ^^c, from the Minnesota River. U. S. EnGINKERS' Ol-IICE, ? St. Paul, Minn., June 2, 1S77. 5 Duplicate sealed proposals will be received by the under- For removal of signed until 2 o'clock P. M., July 2, 1877, for the work of snags, S:c. removing snags, &c., from the Minnesota River. For all information applv to F. U. FAROUHAR, Major of E)igincers. See pages 63, 210, 251. Tennessee River Improvement, Muscle Skoals Canal. U. S. Engineers' Office, Ch.vttanooga, Tenn., April j8, 1S77 Sealed proposals in duplicate will be received at this office until noon, on Tuesday, May 15, 1877, for the building of five locks on the Eos five canal Muscle Shoals Canal, Tennessee- River, about eight miles 'o^ks. above Florence, Alabama, For specifications and forms oC proposals, apply to this office. W. R. KING,- Ca:ptai}i of Engineers. See pages 64, 219, 224, 251. Kanawha River Improvement. Proposals for Building a Dam o)i the Great Kana^ulia River. U. S. Engineers' Office, Baltimore, Md. , March i, 1877. Proposals for building a dam on the Great Kanawha River, West Vir- ginia, near Cabin Creek, will be received until noon of For building ^ dam April 5, 1877, and opened immediately thereafter. Blank forms, specifications, can be had on application at this office. WILLIAM P. CRAIGHILL, See pages 71, 219, 225, 251. Majo'r of Eiigineers. The following is the general form of advertisement in use in the United States lighthouse establishments : — To Iron Manufacturers. — Advertisement for Proposals, for the ]\Ietal Work of the Superstructure of a Light-House. To be Erected at South-west Ledge, Long Lsla7id Sound. Office of the Light House Board, Washington, D. C, 1375 Sealed proposals will be received at the office of the Engineer of the Third Light-house District, Tompkinsville, Staten Island, N. Y., until o'clock of Time of opening. ' > 1875, 212 ADVERTISEMENTS. from iron manufacturers only, for furnishing the materials Nature of work. and labor of all kinds necessary for the completion of the metal- work of the superstructure of a light-house for Southwest Ledge, Long Island Sound, in accordance with the accompanying specifications and drawings. The same to be delivered, at the expense of the contractor. Place of delivery. on board of a sea-going vessel or vessels at „ - The Light-House Establishment will provide the wood- Items excluded. work, the lens, the lamps, and furniture belonging thereto, and their cost is not to be included in the amount of the bid. The bid should state the sum, in United States currency, for which the entire 7Jietal-work, as shown on the drawings and described prke and condi- in the specification, will be completed, fully erected at the tions of acceptance. workshops, then taken down after acceptance, and delivered as aforesaid, and should also state the day and date on which it shall be so completed and delivered, under forfeit, as specified in the "Form of bid.'' The work will be carried on under the personal supervision Inspection. of an agent of the Light House Establishment, and all facilities must be af- forded him for inspecting the material and workman.ship. Such parts of either as are not in accordance with the drawing^ and specifications must, in case of rejection^, be made good at the expense of the contractor. The right is reserved to reject any proposal for any reasons Right to reject, deemed sufficient. Each bid must be accompanied by a bond, signed by the Accompanying bidder and two competent sureties^ in the sum of five thou- ^°"'^- sand dollars, that, in the event of the acceptance of such bid, the necessary contract will be entered into within ten days after notice is given that the bid has been accepted. Bond and security in the sum ot five thousand dollars. Security, signed by two competent bondsmen, for the faithful performance of the con- tract, will be required. A copy of the plans and specifications must be inclosed a copy of plans to with the bid, as evidence as to the object of the proposal. accompany. All proposals must be signed, sealed, and indorsed "Pro- Indorsement. posals for the metal-work of the superstructure of a light-house for (South- west Ledge, Long Island Sound,") and then inclosed in another envelope, and directed, prepaid, to the Engineer, Third L. H. District. Any bidder may be present and witness the opening of the Bidders may be bids at the time and place hereinbefore specified. present at opening. Payments for the work will be made upon estimates cer- Payments and tified to by the agent of the Light-House Establishment; drawbacks. but twenty per centum of the amount of each estimate will be withheld until the satisfactory completion of the contract. ADVERTISEMENTS. 2I3 Plans, specifications, and forms of proposals may be ob- For Information ap- tained from Gen. I. C. Woodruff, Engineer of the Third i''>' '° Light-House District, Tomkinsville, Staten Island, N. Y.; from Col. F. Harvvood, Light-House Engineer, Baltimore, Md.; or from the undersigned. PETER C. HAINS, See pages 77, 227, 254. . r t c .1 Major of hiigiJiecrs, U. ^.A., Engineer-Secretay y Light House Board, Washington, D. C. To Iron Manufacturers. — Proposals for the Metal Work and Erection of Two Lighthouses, to be Known as LiSTON's Tree Range Lights, Delaware Bay. Office of Lighthouse Engineer, Fourth District, No. 512 Walnut Street, Philadelphia, April 18, 1S76. Sealed proposals in duplicate will be received at this office, until 12 o'clock M., Monday, May 13, 1876, from iron manufacturers only, for fur- nishing all the metal work of superstructures, and for the ^°^ V^^° ''"o" ^truc- ° ^ tures for range erection of the same, for two lighthouses to be known as Light. Liston's Tree Range Lights, Delaware Bay. The right to reject any or all proposals, or to waive defects, if it is deemed foi the interests 01 the United States to do so is reserved. Drawings and specifications furnished on application at this office. By order of the Lighthouse Board. W. P. RAYNOLDS, Brevet Brigadier-General, Engineer ^th L. H. District. Advertisements for Municipal Works. Seepagesgo, 230, 235. 259. Department of Public Highways, Office, S. E. Corner Sixth anb Chestnut Streets, Philadelphia, April 17, 1876. Notice to Contractors. Sealed proposals will be received at the office of the Chief Commissioner of Highways, until 12 o'clock M., on Wednesday, April 19th inst., for the construction of a sewer on the line of • New Street from Second to Fourth. Hamilton Street from Twenty-third to Twenty-fourth. Montgomery Avenue, from W^oodstock to Uber Streets. Each with a clear inside diameter of three feet. Said For three feet brick , ,,,.,..., ,. sewers, with man- sewers to be constructed of brick, circular in shape, and in holes, &c. accordance with specifications prepared with the Chief Engineer and Sur- veyor, with such manholes as may be directed by the Chief Engineer and Sun'eyor. And the contractor shall take bills prepared against the pro- perty frontirLg on said sewer to the amount of one dollar and fifty cents for each lineal foot of front on each side of the street, as so much cash paid; the balance as limited by ordinance, to be paid by the city ; and the con- 214 ADVERTISEMENTS. tractor will be required to keep the street and sewer in good order for three years after the sewer is finished. When the track is occupied by a city passenger railroad track, fhe sewer shall be constructed alongside of such track, in such manner as not to ob- struct or interfere with the safe passage of the cars thereon ; and no claini for remuneration shall be paid the contractor by the company using said track, as specified in Act of Assembly, approved May 8, 1866. Each proposal will be accompanied by a certificate that a bond has been filed in the Law Department as directed by Ordinance of May 25th, i860. If the contractor to whom the work is awarded shall not execute a contract within five days after the work is awarded, he will be deemed as declining, and will be held liable on.his bond for the difference between his bid and the bidder to whom the contract may be awarded. Specifications may be had at the Department of Surveys, which will be strictly adhered to. The De- partment of Highways reserves the right to reject all bids not deemed satis- factory. No bid will be received from any bidder or bidders unless known to be skilled and regularly engaged in the construction of sewers. All bidders may be present at the- time and place of opening said proposals. WM. BALDWIN, ^ Chief Com7nissioner of Highways. Department for Supplying the Citv with Water, 'j Chief Engineer's Office, N. W. Corner of Tnirteenth and Sprino: Garden Streets > Philadelphia, April lo, 187$, ) Sealed proposals will be received at this office for each of For trenches for the following items until Tuesday, April i8, 1876, at 3 catating for foun da- o'clock P. M., to be opened in the presence of the Water tion of engine house Committee of Councils : First. For the excavation and back-filling of a trench for the thirty-inch pumping main from the engine-house of the Frankford Water Works, at Lardner's Point, to the reservoir at the Wentz Farm, Twenty-third Ward. Second. For the excavation and back-filling of a trench for the twenty- inch distributing main from the reservoir at the Wentz Farm to the Seven Stars Hotel, Frankford. Third. For the excavation of the foundations of the engine and boiler house and stack at Lardner's Point, on the Delaware ; for the pile-driving and foundation of the engine and boiler house and stack, the foundations for the engine and air-chambers, the forebay walls, the arched conduit, and the construction of the wharf and inlet channel. Specifications and blank forms for proposals will be furnished upon appli- cation at the Chief Engineer's office, and no proposal will be received unless written upon such blank. Each bid must be accompanied with a certificate that a bond of $500 has been deposited with the City Solicitor as per ordi- nance of May 25, 1869, and the successful bidder will be required to furnish security in one half of the amount of the contract, as per ordinance of July 5, 1870. The committee reserve the right to reject any or all bids. W. H. McFADDEN, Chief Engineer. ADVERTISEMENTS. 215 Department ok Highways, Bridges, Skwers, Etc. ^ Office of the Chief Commissioner, S. E. Cok. Sixth and Chestni t Sts., > Philadeli'HIa, April 4, 1876. ) Notice to Bridge Builders. * Sealed proposals will be received at this office until 12 o'clock M., Satur- day, April 8, 1S76, for building a bridge over Paper Mill Run at West Walnut Lane, in the Twenty-second ward. Proposals must pora bridge overa state the time in which to complete the work, and be ac- "■""• companied by a certificate that a bond has been filed in the Law Depart- ment, as directed by ordinance of May 5, i860. Plans, specifications, and form of proposal may be examined at the De- partment of Surveys, No. 224 South Fifth Street. The city'rcserves the right to reject any and all proposals. WILLIAM BALDWIN, Chief Com?nissio7ier of Highways. Office of the Board of Commissioners of Pilots, No. 40 Burling Slip, New YoRk, Sept. 28, 3,1875.5 Proposals will be received at this office until 12 o'clock noon of the 4th day of October, for the removal of so much of the pier For removal of por- 1 r- 1 r> T 1 r i i tion of picr at Sta- and structures at Stapleton, b. I., heretofore erected and ten Island, now maintained in the harbor of New York, by the New York and Staten Island Ferry Company, as are beyond the exterior line as fixed by law. Plans and particulars may be obtained at this office. By order of the Board, GEORGE W. BLUNT, Secretajy. Fairmount Park, Office of Superintendent, Belmont, } Philadelphia, April 11, 1876. 5 Proposals will be received at this office until 12 o'clock For 4,000 cubic .,, ^ • . r 1 ■ 1 ■ 1 11 J'ards of gravel for M., 14th mst., for supplymg 4,000 cubic yards good clear a drive. Fairmount gravel on Chamounix drive. West Park, from Belmont to Cha- mounix. To be delivered before May 6, 1876. RUSSELL THAYER, Siiperintendeiit. Fairmount Park. — Office of Superintendent, ? Belmont, April 8, 1876. > Proposals will be received at this office until 12 M., nth inst., for deposit- ing about 6,000 cubic yards of materialf on Thirty-fifth For6ooocubic street, near Girard avenue bridge ; same to be obtained v^^^^ of material, from the lot of ground on south side of Girard avenue, between Connect- ing Railroad Bridge and Junction Railroad bridge, and the work to be done in twenty days. RUSSELL THAYER, Stiperintcndent. * This advertisement is too vague. The nature of the bridge, whether of wood, iron or stone, and the kind of service, whether foot, road oiT ailroad, should be stated. t The material intended is that found on the lot widiin the specified limits. 2l6 ADVERTISEMENTS. Proposals for Stone. Sealed proposals will be received at the office of the trustees of the '. York and Brooklyn bridge, No. 21 Water Street, Brooklyn, until 12 o'c noon, Saturday, October 9, for the delivery of 1,000 cubic For stone for yards cut face stone, and 731 cubic yards arch stone, all of ments. ^^ ^^ limestone; also for the delivery of 85 cubic yards of granite corners, cubic yards granite face stone, and 31 cubic yards granite arches. Printed specifications may be had at this office. Plans may be see engineer's office, corner Cherry and Dover streets. New York city. United States Centennial Commission, International Exhibition, Philadelphia, i87( Proposals for Furnishing Steam-power, Manufacturers of steam machinery are invited to send to the Direi General of the International Exhibition, at the office of the Commis: No. 904 Walnut street, until Saturday, April 10, 1875, propositions for or more stationary engines, with or without boilers, for driving the m< nery in Machinery Hall. No engine for this purpose of less than 180 h< power will be accepted. Proposals will state 1. ^Diameter of Cylinder. 2. Length of stroke. 3. Number of revolutions per minute. 4. Diameter and width of driving pulleys. It is estimated that 1,400 horse-power will be required for the uses of Commission. Proposals will also be received for boilers without the engines, to be c ble of safely withstanding a working pressure of 100 pounds per square above the atmosphere. All proposals will be required to specify distil whether the foundations are included. Proposals will also be received for sixteen lines of shafting, inclu hangers and couplings, for driving the machinery in Machinery Hall, > line of shafting to be 650 feet in length, and to transmit 180 horse-po to be applied at tbe middle of the shaft, the bearings to be 8 feet a] There will be twelve lengths of this shafting to run at a speed of 120 r lutions, and four lengths to run at a speed of 240 revolutions per mir the diameter of the shafts, exclusive of '* head" and " second'' shafts, be 3 and lYz inches respectively. Proposals in all cases must state the terms and conditions upon w machinery will be furnished, with estimated cost of running the same ing the Exhibition, on a basis of being in operation seven hours a day. The main steam, water and drain pipes will be furnished by the Com sion, but the party furnishing engines or boilers will be required to su] all connecting pipes. All of the above-mentioned machinery, inclu< boilers, to be transported, set up in place, kept in place, and removed at ADVERTISEMENTS. ? I / close of the Exhibition at the expense of the exhibitor. Engines, boilers and shafting to be in place ready for use by the 15 th day of January, 1876. All articles accepted and furnished will be subject to the control of the Commission from the 15th of January, 1876, until the close of the Exhi- bition. Such articles will be considered as having been entered for exhibition. The Centennial Commission reserves the right to reject any or all propo- sitions that may be made in answer to this circular. A. T. GOSHORN, John S. Albert, Director-General. Chief of Bureau of Machinery. Philadelphia, March 18, 1876. Bureau of Machinery. United States Centennial Commission, \ International Exhibition, Philadelphia, 1876. 3 Proposals for Furnishing Shafting, Manufacturers of machinery are invited to send to the Director-General of the International Exhibition, at the office of the Commission, No. 903 Walnut Street, until 4 o'clock, P. M., Saturday October 15th, 1875, prop- ositions for one to eight lines of shafting, including hangers, couplings, and main driving and guide puUeys, for supplying power in Machinery Building; seven lines of shafting to be six hundred and twenty-four feet in length, and to transmit one hundred and eighty horse power, and one line to be three hundred and iifty-two feet in length, and to transmit one hundred and twenty horse power, to be applied at the ends of the shafts, the bearings, except for the head shafts, to be eight feet apart ; hangers to have thirteen inches drop, except those for the head shafts, which will be eleven inches. There will be seven lengths of this shafting to run at a speed of one hun- dred and twenty revolutions, and one length to run at a speed of two hun- dred and forty revolutions per minute ; generally, the diameters, exclusive of the ''head " and second shafts, will be 3 and 2^ inches respectively. All of the above mentioned machinery to be transported, erected, and re- moved at the close of the exhibition, at the expense of the exhibitor, and must be ready for use by the ist of March, 1876. If accepted, it will be subject to the control of the Commission, from that date until the close of the exhibition, and will be considered as having been entered for exhibition. For more detailed information, parties wishing to make proposals will be furnished with " tracings " on application, by the Chief of the Bureau of Machinery. The Centennial Commission reserves the right to reject any or all prop- ositions that may be made in answer to this circular. A. T. GOSHORN, John S. Albert, Director General, Chief of Bureau of Machinery, Philadelphia, September 20, 1875. 2l8 QUESTIONS. QUESTIONS ON THE FOURTH CHAPTER. Page 207. When and how should advertising be done ? State the gen- eral conditions of the U. S. law. Page 208. What information should the advertisement exhibit ? Page 209. Analyze the advertisements given in this chapter in a manner similar to that given on pages 209 to 214. Page 215. Point out some of the defects in the advertisements for a bridge over a run, and for 6000 cubic yards of material. The student should be required to prepare an advertisement for some construction to be selected by the Professor. CHAPTER V. Bids or Proposals. Bids or proposals are offers, usualh' in writing, Bids defined. to do a certain act, or to perform a certain work for a conside- ration. Bona fide bids are those made in good faith, and Genuine bids. with the intention of fulfiUing them. " Strazv " bids are those presented over an as- straw bids. sumed name, or by an irresponsible party for fraudulent pur- poses. The engineer or agent letting the work is ex- Engineer to pre- pected to prepare and furnish to the bidders blank and^instrllctions. ' ^ forms, to be filled out by them, with instructions concerning the manner of so doing, time of presentation and opening, and whatever restrictions may be imposed upon parties desiring the work, with any other information deemed necessaiy. The manner of filling out the blanks, endorS- Fining out blanks ing the bids, and the general conditions to be com- ^o"" p^'opo^ais. plied with as required in all proposals for Government work, are fully set forth in the following '' Instructions for Bidders," zvJdcJi should ahvays be attached to each blank proposal, and form part of the contract. Instructions for Bidders. (Printed on same paper with specifications, S:c.) I. All bids must be made in duplicate upon printed forms to be obtained at this office, and enclosed in two envel- t^. , - , . ' t^ndorsing and ad- opes. The outside envelope will be directed to the dressing bids. engineer in charge at this office ; the inside one will be endorsed {^' Proposals for Dredging at Cedar Keys, Florida!') 220 BIDS OR PROPOSALS. 2. The guarantee attached to each bid must be Guarantees to be certified to by a U. Signed by two responsible guarantors, to be certi- s. officer. fied to as good and sufficient guaranters by a United States dis- trict attorney, collector of customs, or any other officer under the United States government, or responsible person known to this office. 3. When firms bid, the individual names of the individual signa- rures of firms re— members should be written out, and should be quired in fuiL signed in full, giving the Christian names ; but the signers may, if they choose, describe themselves, in addition, as doing business under a given name and style as a firm. 4. All signatures must have affixed to them Seaismustbewax " or wafer. seals of wax or wafer. 5. The place of residence of each bidder, surety piaces of residence and witness, with county and State, must be given ^^^^^'^ '" ^"^^" after his signature, which must be written in full. 6. Prices must be written as well as expressed Prices written. in figures. 7. A percentage often (10) per centum, more or Amount retained. less, will be retained from each payment until the completion of the contract ;* except where (as in case in which no Exceptions. payment is to be made until a work is completed) such percent- age may, in the opinion of the officer in charge, properly be dis- pensed with. 8. The contract which the bidder and guarantors .^"'''" "^ contract ^ ■will be furnished. promise to enter into shall be, in its general pro- visions, and in use by the Engineer Department of the Army^ blank forms of which can be inspected at this office, and will be furnished, if desired, to parties proposing to put in bids. Parties making bids are to be understood as accepting the terms and con- ditions contained in such form of contract. 9. Reasonable grounds for supposing that any Fraudulent or straw bidder is interested in more than one bid for the bidding prohibited. same item will cause the rejection of all bids in which he is inter- ested. * Work. BIDS OR PROPOSALS. 221 10. The United States reserves the right to re- ^^^^ to reject any ject any and all bids ; also to disregard the bid o{ Tiny fa Hi fig bid- der or contractor Vwoww as such to the Engineer Department. ir. The bidder must satisfy the United States Sl;'^';^ pTrforn ' of his abilit}' to lurnish the materials or perform the work for which he bids. 12. Piiyments for each month's work will be Time of making made as soon after the first of the month as prac- p^y'"^'"^*- ticable. 13. Transfers of contracts or of interests in con- Transfer of contract tracts, are prohibited by law.^ prohibited. 14. In submitting proposals, the sealed envelope indorsing proposals must be so endorsed as to indicate before being opened the par- ticular work for which the bid is made. i^. A bond of (an amount usually about one- Security for the com- ■J ' -^ m:ncement of the third that of the contract) dollars, with two suffi- ^''^''^■ cient sureties, will be required to insure the commencement and completion of the work at the time stated. 16. Proposals will not be received by telegraph ^t^ j^j^s b - tcie- at any time. s^^p^- 17. Blank forms of proposals and guaranty must blanks must be be properly filled out in regard to guaranty, price properly mied. of doing work, time of commencement and completion, &c., ex- actly in the manner prescribed by them. 18. Detailed maps of the locality can be seen at ■r^ • '^ ' Drawmgs to oe this office. seen at office. IQ. A copy of this advertisement and specifica- . , ,■ y ir J JT Advertisements, tion will be attached to the contract and form part &<:•> to form part of c contract. of it. 20. Bidders are requested to be present at the Bidders present at opening of the bids.f °p'"^"^- ' § 3>737- Revised statutes, U. S. July 17, 1862. — No contract or order, or any interest therein, shall be transferred by the party to whom such contract or order is given, to any other party, and any such transfer shall cause the annulment of the contract or order transferred so far as the United States are concerned. All rights of action, however, for any breach of such contract by the contracting par- ties are rcser^-ed to the United States. t §3710 Revised Statutes of the United States. Whenever proposals for supplies have been solicited, the parties responding to such solicitation shall be duly notified of the time and place of opening the bids, and be permitted to be present either in person or by attorney, and a record of each bid shall there and then be made. 222 BIDS OR PROPOSALS. 21. No award of the work above advertised No work awarded before approprla- will be made until the bill making the appropria- tions are made. tion for the same has been passed by Congress, and approved by the President of the United States. The object of these several provisions are so evident as to need no explanation. They are the results of a loQg The above pro- experience, and are found to be necessary safe- visions necessary. guards to ensure honesty and expedition in the execution of the contract. The Guaranty provides that the contract shall be GuSnty.* ^ entered into within ten (lo) days, more or less, of the time of making the award. This is to prevent irresponsible parties having no " plant " from entering, with the expectation that if successful they will procure an equipment on credit, or sell out to other contractors for a " bonus." Blank forms of Proposals as used in the U, S. Service with the Guaranty attached, are appended as guides. Proposals of. - - for Removing Snags, Slc, from Minnesota River, Opened July 2, 1877. See pages 63, 211, 219, 251. (Town, County, and State) 1877. I, (or) We, the subscriber , do hereby propose to do the work of remov- ing snags, &c., from the Minnesota River, agreeably to the terms of your advertisement and specifications dated June 2d, 1877, (copies of which are hereto attached) relating to '* Improvement of Minnesota River," in the manner and upon the terms specified below, viz. : For removing Boulders dollars and cents, ($ ) per cubic yard. For removing overhanging Trees from the banks, of the following dimen- sions, measured one foot above the roots : For those thirty-six inches in diameter and upAvards, dollars and cents, {$ ) each. For those thirty inches in diameter and upwards, not exceeding thirty-six inches in diameter,.. dollars and cents, ($ ) each. For those twenty inches in diameter and upwards, not exceeding thirty inches in diameter, dollars and cents, ($ ) each. BIDS OK PROPOSALS. 22^ For those six inches in diameter and upwards, not exceeding twenty inches in diameter, dollars and cents, ($ ) each. For those four inches in diameter and upwards, not exceeding six inches in diameter dollars and cents, ($ ) each. For removing Snags, Logs, Stumps, and Trees with roots imbedded in the bottom of the river, of the following dimensions, measured two feet above the roots : For those thirty-six inches in diameter and upwards dollars and cents, ($ ) each. For those thirty inches in diameter and upwards, not exceeding thirty-six inches in diameter, dollars and cents ($ ) each. For those twenty inches in diameter and upwards, not exceeding thirty inches in diameter, dollars and cents, ($ ) each. For those six inches in diameter and upwards, not exceeding twenty inches in diameter, dollars and cents, ($ ) each. For those four inches in diameter and upward, not exceeding six inches in diameter, dollars and cents, ($ ) each. I (or) We further propose to commence the work on or before the 1st day of April, 1878 ; and I (or) we pledge to enter into a written contract with the United States, with good and approved security, within the space of ten days after being notified that the foregoing bid has been accepted. Your obedient servant, [L.S.] Witness. Of the town of county of State of - [L S] Of the town of county of State of [L S] Of the town of county of State of To MAJOR F. U. FAROUHAR, Corps of Engineers. Gtiranty. We, of the town of. in the county of and State of and of the town of in the county of. and State of here- by, jointly and severally, covenant with the United States, and guarantee, in case the within bid of - be accepted, that will, within ten days after being notified of the acceptance of said bid, execute a contract of the character and form described in the accom- panying General Instructions for Bidders, and in conformity with the adver- tisement and specifications dated June 2d, 1877, under which the bid was made, together with a bond, with good and sufficient sureties, in the sum of three thousand dollars ; and in case the said 224 BIDS OR PROPOSALS. shall fail to enter into a contract as aforesaid, we guarantee to made good the difference between the offer by the said , and the next lowest responsible bidder, or the person to whom the contract may be awarded. Given under our hands and seals this. day of. 1877. Witnesses : [L. S] - - .-...[L. S.] I hereby certify that, to the best of my knowledge and belief, the above named guarantors are good and sufficient as sureties for the amount for which they offer to be security. * The form of guaranty being the same for all Government pro- posals is not attached to any subsequent blanks. Proposals of - for Building Five Locks on the Muscle Shoals Canal, Tennessee River, Opened May i^th, 1877. See pages 64, 211, 219, 251. (Town, County, and State,) 187 I, (or) We, the subscriber , do hereby propose to furnish the materials and do the wprk required in building Lock No agreeably to the terms of your advertisement and specifications, dated April i8, 1877, (copies of which are hereto attached), relating to the building of locks on the Muscle Shoals Canal, in the manner and on the terms specified below, viz. : — 1 . For earth excavation .cents ( ) per cubic yard 2. For rock excavation dollars and cents ($.-) per cubic yard 3. For removal of old locks dollars and cents ($- - ) per cubic yard 4. For cut stone masonry, set. .dollars and cents ($- - ) per cubic yard 5. For rock face masonry, set. . .dollars and .cents ($- - ) per cubic yard 6. For rubble masonry, laid. dollars and cents ($ - - ) per cubic yard 7. For concrete, laid dollars and cents ($. .) per cubic yard Allowing the United States for stone taken from old locks, and used as — 8. Cut stone masonry dollars and cents ($- .) per cubic yard 9. Rock face masonry .dollars and cents ($ . - ) per cubic yard 10. Rubble masonry dollars and cents ($.-) per cubic yard "* To be certified by a U. S. District Attorney, Collector of Customs, or any other officer under the United States Government, or responsible person known to this office. BIDS OR PROPOSAE^. 22 5 I, (or) Wc, have carefully read the foregoing specifications^ and have in- formed as to the nature of the work to be done. I, (or) We, further propose to commence the work on or before the day of June, 1S77, and to complete the same on or before the 30th day of June, 1878; and I, (or) we, pledge to enter into a written contract with the United States,. with good and approved security, within the space of ten days after being notified that the foregoing bid has been accepted. Your obedient servant, Witnesses Seal. Of the town of County of State of .Seal. Of the town of County' of State of. Of the town of County of State of. To CAPTAIN W. R. KING, U. S. Corps of Engineers, Chattanooga, Tennessee. .Seal. ENDORSEMENT. Proposal of for Building a Dam on the Great Kanawha River. Opefted April ^th, 1877. See pages 71, 211, 219, 251. (Town, County, and State), 187 the subscribers offer to furnish all the materials not furnished by the United States, and to do all the work necessary to construct and com- plete the earthwork and masonry of Dam No. 4, of the Kanawha River im- provement, in conformity with the terms of your advertisement, dated March I, 1877, and with the specifications herewith, with the plans, and with such directions as may from time to time be received from the engineer, for the following prices for finished work, viz : Earth excavation per cubic yard Rock excavation *' " Puddling '^ '' in place Concrete *' '' " Coping '' " laid Cut stone masonry '' " *' O 226 BIDS OR PROPOSALS. Dressed rubble masonry per cubic yard, laid ^ Rockfaced " " " " Rough rubble " " " " Slope wall, including lining, pet cubic yard, laid .. Rip-rap per cubic yard in place Paving " " " Timber and plank, per i,ooo feet, B. M., in place The above prices include all materials, workmanship, labor, scaffolding, tools and machinery, and every expense necessary to the completion of the whole work. In compliance with the specifications, we have visited either in person or by competent agent, the localities in question, and have made the investiga- tions recommended. further propose to commence the « on or before the day of. 187 , and to com- plete the same on or before the 31st day of December, 1878 ; and I [or] we pledge to enter into a written contract with the United States, with good and approved security, within the space of ten (10) days, after being notified that the foregoing bid has been accepted. Your obedi- ent servant , Witnesses : -- [L S] - [L. S] Residences of Bidders. Of the Town of. County of State of . Of the Town of .County of State of Of the Town of County of .State of. To MAJOR WM. P. CRAIGHILL, Corps of Engineers, Union Bank Buildingj Baltimore, Md. BIDS OK PKOrOSALS. 22/ U. S. Light-House Bureau. The forms in use in the U. S. Light-House Establishment differ somewhat from those of the Engineers. They are accom- panied by a guaranty or bond as well as by the oaths of the Bo?ids- ;«^;^, giving their pecuniary status and a certificate Requirements of of a Government officer relative to the solvency of House Estabiish- the bondsmen. Form of Bid. ment. See pages 77, 213, 254. I, (or we,) , of the , State of , engaged in iron-manufacturing business under the name and style of , hereby agree to furnish all the materials and labor necessary to completely construct, erect at the workshops, take down after acceptance, and deliver on board vessel, (except the woodwork, the lens, the lamps, and other furniture belonging thereto,) at , the metal-work for the superstructure of the hght- house for Southwest Ledge, Long Island Sound, in accordance with the ac- companying specifications and drawings, the work to be completed and de- livered on or before the day of , 187 , for the sum of. Tiro" dollars, ($ unT) ) in United States Currency ; and further agree to forfeit the sum of twenty dollars per day, as liqui- dated damages, for each day's delay in completing the work after said date, said amount to be deducted from any sum due me (or us) in the hands oi the agent of the Light-House Establisnment. (Signed) [L. S.] [L.S.] [L.S.] To GEN. L C. WOODRUFF, Engineer Third Light-Honse District, Tom^kinsville, Stat en Islatid, New York. 228 BIDS OR PROPOSALS. Form of Bond With Bid, Khow all men by these presents, that we, and , citizens of are held and firmly bound unto the United States of America in the full and just sum of dollars, ($ , ) lawful money of the United States, to be paid to the said United States, or to its proper agent or attor- ney duly authorized to receive the same, as liquidated damages ; to which payment, well and truly to be made and done, we bind ourselves and every of us, our and every of our heirs, executors, and administrators, in the whole and for the whole, jointly and severally, firmly by these presents. Sealed with our seals and dated this .of. 1 . .anno Domini one thousand eight hundred and seventy The condition of the above obligation is such that if .....and -- doing business under the name and style of their heirs, executors, and administrators, do, and shall well jmd truly, within ten days after notice of acceptance of bid, enter into contract for the construction of the metal-work for the superstructure of a light-house for Southwest Ledge, Long Island Sound, in accordance with the terms of .bid dated , 187 , conforming in all respects to the advertise- ment dated , 187 , calling for proposals, the same being hereto annexed, then the foregoing obligation to be void and of none effect; otherwise, to remain in full force and virtue in law. Signed, sealed, and delivered in the presence of — Witnesses : [L. S.] |L. S.] [L. S.] [L. S.] Notes. — All signatures of bidders and sureties should have affixed to them seals of wax or wafer. The residence of sureties and witnesses should be given. Bondsmen will qualify in double the amount of the bond, and will qualify in the forms following. Bondsmen'' s Oaths* State of , ^ County of. ,\ ^' • , being duly sworn, deposes and says that he resides at No , street, in the of in the State of. - . ; and that the value of his property, over and above BIDS OK PROPOSALS. 229 all debts and liabilities incurred by him, is over dollars, ($ ,) and that he is fully responsible for the amount of his obligation in the foresoins bond bv him executed. Sworn and subscribed this dav of , 187 , before mc. --- [I^-S.] State of , ) Coiuity of. , y , being duly sworn, deposes and says that he resides at No , street, in the of in the State of ; and that the value of his property, over and above all debts and liabilities incurred by him, is over dollars, (S ,) and that he is fully responsible for the amount of his obligation in the foregoing bond by him executed. Sworn and subscribed this day of , 187 , before me. ,[L. S.] Ceriificate of Solvency. I certify that I have made due and diligent personal inquiry as to the ability of the signers of the foregoing bond, and am satisiled that they are good and sufficient, and fully responsible for the sum of .. _. dollars, ($ ) each. Date: Notes. — The sureties' certificate of solvency must be signed by an officer of the Government known to the Treasuij- Department. Each surety will qualify in double the amount of the bond. Municipal Work. The following bid is selected from a large number submitted for a sewer, and will serve to give some idea of the prices for that class of work. Accompanying it will be found the certificate of the City Solicitor as required by the Ordinance of May 25, i860, to which attention is called in the advertisement as pubh'shcd on page 230 BIDS OR PROPOSALS. Department of Surveys, City of Philadelphia. The Snyder Avenue Main Sewer, On Snyder Avenue, frojn Sixth street to Delaware Avenue , as authorized by Ordiftajice approved November i, 1875. To Contractors, Proposals for the construction of the above work must be made upon the printed forms. They must have inserted the signatures of at least two responsible sureties, and also be accompanied by a certificate that a bond has been filed in the Law Department, as directed by Ordinance of May 25, i860. No proposal will be received from any contractor unless known to be skilled and regularly engaged in the construction of sewers. Proposals which contain any omissions, erasures, alterations, additions not called for, conditional bids or irregularities of any kind, will be rejected as informal. All prices must be written in words, and also stated in figures, and must be for the whole work. Extra work, when necessary, will be done and paid for according to the estimate of the Chief Engineer and Surveyor. Contractors must make themselves acquainted with the conditions of the ground, whether the foundations will be rock, hard earth, or soft bottom, so that they may make an intelligent bid. Proposal. See pages 90, 213, 259. Philadelphia, June 14, 1877. To the Chief Commissioner of Highways. — Sir\ — I hereby propose to furnish all the labor and materials necessary to perform the whole of the work, and submit to all conditions as represented, intended and implied, both particularly and generally in the plans, specifications and form of agreement examined at the Department of Surveys, and also in the Ordi- nance approved November i, 1875, " to authorize the construction of cer- tain sewers,'' and perform all additional work that may be required, upon the following terms, to wit : — For Sewer 5^ ft. in diam. per lineal foot, the sum of five dollars $ 5,00 For Sewer 6 ft. in diam. per lineal foot, the sum of twelve dollars. — 12.00 For Sewer 6^ ft. in diam. per lineal foot, the sum of fifteen dollars 15.00 For Sewer 7 ft. in diam. per lineal foot, the sum of twenty dollars — 20.00 For Sewer 7- ft. in diam. per lineal foot, the sum of thirty dollars — 30.00 For Sewer 8 ft. in diam. per lineal fool, the sum of thirty dollars 30.00 And I hereby propose, as responsible sureties, the persons who have affixed their names to the annexed certificate, and who are willing to be BIDS OR PROPOSALS. 23 1 bound with me jointly and severally, in the sum of one-half the estimated value of the work herein proposed to construct, for the due and satisfactory- performance of the whole work comprised in the contract, as well as of such additional works that may be ordered, and to complete the same within twelve (12) months after the date of the notice given by the Chief Engi- neer and Surv^eyor to begin work. As witness my hand this twelfth day of July, 1877. (Signed) HUGH DEEHAN. Address — Hugh Deehan, No. 192 1 Hamilton Street. Certificate of Sjireties. This certificate must be signed by two sureties. We hereby certify that we are responsible sureties, and agree to be bound jointly and severally with the above-named Hugh Deehan, Contractor, in the sum of one-half the estimated value of the work herein proposed to construct, should this proposal be accepted. (Signed) JAMES DEEHAN, No. 807 North Sixteenth Street. CHARLES S. PANCOAST, No. 1907 Greeji Street. FRANCIS LOGUE, No. 803 North Eighteenth Street. \ Law Department, No. 212 South Fifth Street Phila , March 3, 1877 This will Certify : That B. C. D. has complied with the ordinance of Councils, approved May 25th, i860, "relating to proposals for work and materials," and has filed his bond with the requisite security, in $500, conditional that if his bid for the construction of a sewer on Street is the lowest, and he shall decline to do the said work or furnish said mate- rials, then he shall pay to the city the difference between the amount of his bid and the bid of him or them who shall actually perfotm said work or fur- nish said materials. W. N. A. Assistant City Solicitor. Proposals for Railroad Graduation and Masonry. bee pages 150, 280. The accompanying form of proposal is that in use at present upon the Pennsylvania Railroad and its branches. The prices are also written out in full in the contract of which this is a part, see page >- c ■- .S A t/5 •4-> o ■5/5- w « c o x: <; m C/J a (/) •tfi- 3 rt 1) i^ O <-^ a. 4-1 o •5/5- o w Oh Pi I >< O m < ^ . §>* W o ^^ > < O X 04 • c/l ^ CU i5 ^/5- (/i o| u c75^ ■5/5- U1 u ►5'^ > ■5/5- bij ;>) C y > CS Ph ■5/5- t/7 .-go PQt3 5/5- .-So t/5 -5^ bJO rt ^/5- •O 12 oi to u J= (U > u 3 > w (J ■5^ ^ (U 6 S ■5/5^ -58 ^/5- ^P^ o M 4-> O ■5/5- J3. O c o ri -> tn c 6'S CU •l-l , 0) ■4-> > tS •s u C3 ,a 4-> 4-1 •!-» a .2 tn 1:3 X, ^ 3 G cu > > (n ,d > U 4-> 03 u u (U ,G ^ ^ U _c 4-> +-» «*-. u OJ tfj 4-> ^ c i • - 1/5 rG 4-> OJ '2 -^ 'u Oh ■4-J 'c3 V- j_, u (U s eby p or all OJ -1^ In ^ 'd 'Z - c :2 xj .t:: 'c5 03 r— C/J G rt g a '^ 1 V- a C/5 C v2 it •4-> c U •^ _o "o "5 fi ^ •^-' V G QJ 3 3 Ph ^^ "cj Ph OJ (/5 QJ {/3 ^ T3 •X3 ■i-i r3 X IS [232] INCINNATI SOUTHERN RAILWAY, Also, that he ha carefully ther or all the Sections, to which prices are affixed in the Schedule, according to ecute a contract for the work at the following prices : — Mac.\d.\mizing. Drain Pipe. Foundations. WOOD TRESTLES GirderBridges Per Cubic Yard. Per L. t. perMBM'perlb. perLft Piles. perMBM per lb. perMBM Timber. per lb. Concrete. Macada- mizing. Remov- ing old Turnpike metal. 12 Inch. 15 Inch. 18 Inch. Timber in Foun- dations. Iron Work. Timber. Iron. Iron. ) Cts. $ Cts. $ Cts. Cts. Cts. Cts. $ Cts. Cts. Cts. $ Cts. Cts. $ Cts. Cts. .day of 187 .Name of P^irm. The undersigned hereby certif , that he ha personally and carefully examined the Sections named in the bid below, on Division of the CINCINNATI SOUTHERN RAILWAY. Also, that he ha carefully examined Profile and Specifications of the same. Having made such examinations, the undersigned hereby propose to the Trustees OF THE Cincinnati Southern Railway, to do all the work specified, on either or all the Sections, to which prices are affixed in the Schedule, according to fonditions and Specifications aforesaid, and on the acceptance of this Proposal for either or all of the following Sections, do hereby bind to enter into, and execute a contract for the work at the following prices : — GENERAL EXCAVATION. Em- bank- cubic yard. Cts. TUNNEL WORK. MASONRY. 1 Macadamizing. Drain Pipe. Foundations. WOOD TRESTLES GirderBridges No. of Sectioa and DnTsion. Per Cubic Yard. Per Cubic Yard. Per Cubic Yard. Per Cubic Yard Per L. t. perMBM per lb. perLft perMBM per lb. perMBM per lb. Earth Exca- "ctsT Hard Pan. "cteT Loose Rock. cts. Solid Rock. cts. Iron Ore. E.\ca- Water Cts. Tunnel Excava- Uon. Shaft Excava- Brick Work. Concrete Packing. Dry Packing Timber- ing per looo feet B. M. 1st cl.iss Bridge Masonry 2d class Laid dry. 2d class ist class Arch Masonry zd class Laid dry. 2d class Box culv. Masonry Dry. Box culv. Slope Walls. Rip Raps Stone Paving Brick Work. Concrete. Macada- mizing. Remov- ing old Turnpike metal. In?h. Cts. Inch. Cts. i8 Inch. Cts. Timber in Foun- dations. Iron Work. Cts. Piles. Cts. Timber. Iron. Cts. Timber. Iron. cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ cts. $ cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ Cts. $ CIS. Cts. The undersigned further propose to commence work within days from date hereof. Signed this day of. -Name of Firm. Post Office Address of Contractor, By- t in 1/1 a tj -C en H c M ^/5- Ui (X4 o •O ui 1 ir c V 1 (/5 ■a o tj (J 05 i. o a a. ^«- ffi c <-> tj a o o ^fi- w < ^ :s t/5 < 1 IT. 1/1 c u u E ^ < ^fi- ttf ^ 1/5 u>ii. u i) U 0.0 > __ M O 3 u c5 U t/r >ii W 1-— ■ C »J K -^ S C tfl 1- .-. ..-■ 1) ^«- CO rt -d O hi U 1/5 = ■2 y C rt'^ = > 3 ■ta- H U <»> o u c CJ o ja-S .3:>< Z c a, o U ^ U r- O 5 o _ u b;3 c o u CO o 4:: -■ > 13 ^ o ^ U CJ o o c O o .0 9h a •^ CJ CJ ^ 03 O (U •jr > CJ ^ CJ > QJ ^ o .y *- ^ 1- ■"" ?J *-• 3 O rt I u ^"^ "^ r" >- g -c ^ o >-' ^ ■2 o -rt •- >-, V- '-^ O ^ ^'^^ S c rt '/) c o o to r— o ^ t/5 CJ 1-5 u o K 00 OJ o c (U r2 'In «J o O o o o 1 233] 234 BIDS OR PROPOSALS. Proposal for the Superstructure of an Iron Bridge. Offick of the Keystone Bridge Co., Philadelphia, Dec. 24, 1873. Robert H. Sayre, Esq., Chief Engineer, E, &^ A. R. R.: The Keystone Bridge Company respectfully submits the following prop- osition for the manufacture and erection of a first-class wrought-iron bridge on the Easton & Amboy R. R., across Morris Canal and Lopatcong Creek; as per the accompanying diagram of strains and the following specifications: Bridge to be of double track, of span as given on profile sent us. Bridges to be proportioned to sustain a variable load of 3000 lbs. per lineal foot per track, on the chord system and 3,500 lbs. per lineal foot on the panes system, in addition to the dead weight of structure with the following strains on materials, viz : Tensile strains 10,000 lbs. per square inch. Compression, upper chord 8,000 " " " " posts 7,500 to 7,000 ^' " " The iron to be of best quality bridge iron of an ultimate tensile strength of 55,000 to 60,000 lbs. per sq. inch, tested in usual way. Track to be carried on wrought-iron cross girders with heavy longitudinal stringers and cross ties. Through span to have suspended cross girders at each post, wooden stringers and cross ties. Upper chords to consist of rolled channels, with top plate open on under side to admit of repainting on inside. Posts to be Linville patent, also made open to admit of repainting on interior. Lower chords, our patent weldless links. Caps and bases of posts to be of cast-iron. Deck spans to have no end posts, but to be supported by masonry carried to upper chords. Through span to have inclined end posts and upper lateral bracing. All lateral struts to be of wrought-iron. Price for the bridge erected complete ready for tTie cross ties; iron work painted one coat, will be as follows : Two deck spans i46"o5 ft. clear, $22,300 each $44,600.00 One through span, askew, 66. 75 ft. on centre line 6,500.00 Total - $51, 100.00 The company to prepare masonry to suit plans and remove any existing structure, and furnish and lay cross ties. BIDS OR PROPOSALS. 235 We have assumed that there is railroad communication to t3ridge site. Payments to be made monthly on material delivered at our works and work in progress, ten per cent, being retained until completion. We can execute the work promptly and have the bridge completed in time specified, I am, yours very respectfully, April 15, 1874. J. H. LINVILLE, President. Opening the Bids. All proposals should be opened publicly, and in proposals to be the presence of any bidders who nxiy desire to at- ^" '^ ^ °^^"*^ ' tend, that there may be no opportunity for a charge of unjust discrimination, or for the suppression of any of the bids. At the time appointed in the advertisement, the Method of pro- parties authorized by law to examine and compare "^^'"s- the bids, having assembled at the proper place, with such of the bidders or their proxies as may desire to be present, the " sealed proposals are then opened one by one, and the contents read aloud that all present may take notes. The parties letting the work enter the several prices bid in a tabular form and proceed to determine the aggregate. If the number of proposals be numerous or the work extensive, this operation may continue several days, in which case the bidders may disperse after hear- ing the prices read, and await the announcement of results. It frequently happens that young and inexperienced contractors, to secure a piece of work will put in a bid at such low figures that it would be impossible to execute it at that price, and the attempt would only result in loss and delay to the operators. For this and other reasons, the clause reserving the right to reject any or all bids if deemed necessary has been introduced. In openinf^ the twelve proposals made for the Bids for Snyder , , Avenue Sewer, •construction of the Snyder Avenue Sewer, (see Philadelphia. 236 BIDS OR PROPOSAI page 230), the prices bid were read out, and the results thern tabulated as follows: — Ph 3 7 5 8 12 9 I 2 6 4 10 II Names of Bidders. Estimated Quantities. . . Jos. R. B- Jas. M. K- Jas. A- p. & T. C Sam. O S. H. C Hugh D B. F. D R. A. M E. D. S jas. K P.H. McL.&B.E. s ^ s'-s ■" S C.2 B •2. « Is c 2 neal foot diameter. neal foot lameter. *« 2 1-1 u m Phv2 — T3 V Soo 1565 $11.50 770 15.00 ^ 644 17.00 380 380 21.00 380 19.00 24.00 9 14.75 18.00 19.50 20.25 22.75 24.50, 8 10.50 11.50 »4.oo 27.00 27.00 28.00 6 14.80 14.80 19.70 23.75 25.00 27.OO] 12 15.63 22.31 23.89 26.17 27.85 30.16 6 13.75 17.71 19.58 22.00 23.81X 28.60 12 5.00 12.00 15.00 20.00 30.00 30.00 10 11.50 16.00 17.00 19.00 20.00 22.00 9 13.00 16.50 18.25 21.25 24.25 28.50 6 4.46 15.27 16.45 16.69 21.77 24.80 18 14.50 ?4.7o 24.00 24.72 26.00 , 27.68 12 19,78 21.00 22.00 23.00 24.00 25.00 Lineal Feet. Informal. 64,815.5a 75.151.75 71,903.50 76,029.80- 89,013.21 76,042.67 57,125.00 64,445.50 72,923. oo> 69,020. 40' 79,259.50 88,653.7a This table is computed by multiplying the quan- Method of caicu- tity at the head of each column by the price bid in ''"§ ''^^"i^^- the same column, and adding these several products together for the total. For convenience in adding, it would be better to re- verse the positions of the bidders and quantities, so as to bring the partial products in vertical columns, thus — No. of Proposals 3 3 7 Etc. II Names of Bidders Jos. R. B. Jas. M. K. Etc. P. H. McK and B. E. Time 9 Etc. 12 Price bid for 5% feet. . . " " " 6 «... Etc., Etc., No. lineal ft. 1565 770 Etc. Bids. 1 1 .50 15.00 Etc. Par. prod. 1 7.997' 50* ii,55o'oo Bids. i4'75 18 'oo Etc. Par. prod. 23,083-75 13,860-00 Etc. 19-78 21-00 Total amounts 64,815-50 75,151 75 * These products may be very rapidly obtained with absolute accuracy by the use of Grant's cal- culating machine. BIDS OR PROPOSALS. 237 An examination of the table shows a dirfcrcncc Remarks on ubi- in the ag'^Tegates of nearly 332,000, and the hi<^hest bid is made out in odd cents, which is but an affectation of extreme accuracy where none exists. The figures were doubtless assumed without any reference to an estimate. There are also serious objections to the method ^^''l^'^LTf i!l "f'" of bidding by the lineal foot based on a certain esti- '""'■ mated amount of material, as it is impossible to foresee what kind of foundations may be required, for in some cases piles and a gril lage may be needed ; in others, a bed of masonry, &c. This method of lineal measurement has recently been introduced in Philadelphia in consequence of difficulties in determining quanti- ties for the Hart Creek Sewer, but the same objection still holds. The former method of estimating, based on the actual amount of each kind of work done, being the better ; the following form is annexed as showing the manner of tabulating the results of bids made on that principle. Proposals Received and Opened i8. . ., As Approved by Ordinance. 18. »No. of Proposal. .' i I ^ .- Names of Bidders. .... s rt 3 A. B. F. and J. S. P. P. & J. s. Etc Time in months ' 8 6 cub. yds Bid. Product. Bid. Product. Bid. Product. Bid. Product. .... T^pfillincr ("v embankment Foundation Regular coursed pitched ashlar ♦ Random coursed pitched ashlar ■ cs Hammer dressed .... ^1 1) Broken ashlar Rubble ^ Dry walls m Coping (cub. ft. ) Arch and ring stones (cub. ft.) Concrete Piling (lin. ft.) Foundation timber and planking (per M b m) Manholes, per piece Wellholes (lin. ft.) Inlet Basin (piece) Total amounts - A similar form will answer for any kind of work. 238 BIDS OR PROPOSALS. If, as sometimes happens, two bidders have equal amounts, there are other considerations, such as quality of Two or more bids material, promptness of delivery, responsibility of "^ ^'^"^^ amounts. bidders or sureties, etc., which will assist in determining to whom the contract should be awarded, or in some cases the award may be divided between them. The proper person having been selected, official notice in writing should be served upon him to that effect, rs .- . %. o IT 1 Notice to be sent to and the time within which to begin work after his successful bidder. receiving the notice^ should also be specified. The accompanying extracts will explain the proceedings in opening bids for supplies of various kinds, and the manner of disposing of them. Philadelphia, April 19th, 1876. Meeting of the Water Committee of Councils. The regular meeting of this committee took place yesterday afternoon, Mr. Shallcross presiding. Bids were opened for excavating and filling the trench for the 20 and 30- inch mains, to connect the reservoir on the Wentz Farm with Ladner's Point, on the Delaware, and between the Wentz Farm and the Seven Stars Hotel. There were a large number of bids, the prices for excavation rang- ing from 1 5 cents per cubic yard for earth to 68 cents, varying with the depth, and for rock excavations from 60 cents to $3 per cubic yard. Itemized bids were also received for building the foundations of the engine and boiler house and stack. All bids were laid over for one week, until a calculation can be made upon the several bids. The contract for furnishing water pipe for the 48-inch mains for connect- ing the Spring Garden and Corinthian avenue basins was awarded to the Gloucester Iron Co., at 1.53 cents per pound. Several ordinances for laying mains were reported favorably. Adjourned. See page Water Department. Meeting of the Council Comtnittee — Bids Opened and Contracts Awarded. The Water Committee of City Councils met at the headquarters of the Water Department, Thirteenth and Spring Garden streets, Mr. E. A. Shall- cross in the chair. Bids were opened for 250,000 pounds of pig lead for the use of the depart- ment, as follows : John Runkell and Joseph Solomon, at 8.85 cents per per pound, American; Tatham Bros., 7.82 cents Spanish, and 7.48 Ameri- Bins OR rivOrosALs. 239 can; Phelps, Dodged Co., 7.50 for American, and 8-50 for Spanish ; Wil- liam 11. Trotter, American, 7.45 cents. Colonel Jones moved that the contract for all the lead required be awarded to William H. Trotter, when considerable discussion ensued, and fmally the matter was postponed until the next meeting by a vote of 13 to 8, with the request that the Chief melt a little of Trotter's lead and sec if it is good. This action made Dr. AIcFadden angry, and he said it would be impossible for him to do what he was requested. Proposals for furnishing 15,000 pounds of brass castings were then opened, as follows: Joseph L. Travis at ig-;{ cents per pound, Spear and Richards 17 cents, and W. W. Keys 17 cents. A man named Welsh had the contract last year. Mr. Hill moved that the contract be awarded to both parties, one half of the amount to each. This was not voted on, but the entire contract was awarded to Spear and Richards. The following bids were then opened for 150,000 lbs. of iron castings : — Adams and Story, $2.24 per 100 lbs. ; David S. Creswell, $2.37^ ; Jesse W. Starr & Son, $2.50; R. D. Wood & Co., $2.33/5 ; Daniel Runkell, $3 ; Aaron Mellert, $2.12; Benjamin F. Archer, $2.75 ; and Todd & Jones, $2.12)4. There were three proposals unaccompanied by a certificate from the City Solicitor. A motion was made to award the contract to Todd 8c Jones, although they were half a cent higher than the lowest bidder. This led to some dis- cussion. A motion to award it to the lowest bidder, Aaron Mellert, at $2.12 was agreed to. Proposals for branches and sleeves were then opened as follows : Aaron Mellert, $2.45 per 100 pounds; Runkell, $3; O'Neall and Archer, $2,75 ; Gloucester Iron Works, $2.61; R. D. Wood & Co., $2.33/; Jesse W. Starr & Co., $2.50. The contract was awarded to R. D. Wood & Co. Proposals for cast-iron pipes were then opened for 6, 8, 10, 12 and 48- inch pipes. The contract for the 6, 8, 10 and 12-inch pipes was awarded to Mr. Mellert at $1.42 for 100 lbs. he being the lowest bidder. The contract for the 48-inch pipes was awarded to R. D. Wood & Co., at $1.45 per 100 pounds. A Meeting of the Committee of the Select and Coinjnon Councils Was held Saturday Afternoon, April, 1871, at half-past three o'clock, in the Office of the Chief Engineer, Strickland Kneass, at the Department of Sur- veys, Fifth street, below Walnut. Present — Messers. W. S. Allen, Chair- man ; Robinson, Mitchell, Bickel, Smith and Cattell. Sealed proposals for the construction of a new bridge at the site of the present wire bridge at Fairmount having been received, were presented by Chief Engineer Kneas. C. H. Latrobe, Esq., of Baltimore, submitted a proposal for the construc- tion of the superstructure of the main bridge at the rate of $930 per linear foot. The Phcenix Iron Company submitted a proposal for the same work at $1125 per linear foot; also, for the Thirtieth street trusses, including 240 BIDS OR PROPOSALS. lateral bracing and exclusive of road formation above top cord $122 per linear foot ; for removing suspension bridge, including towers, cables and roadway, $100; amount to be credited to the city upon contract materials in suspension bridge, including towers, cables and roadway, $100; wrought- iron work in approaches, 9 cents per pound, cast-iron 7 per pound. Messrs. James F. Kennedy and John W. Murphy submitted the following proposals : Excavation. Kennedy. Murphy. Earth per cubic yard, .40 ^o Rock per cubic yard $1,50 $1.48 In shafts, with curbing, per cubic yard 3.00 3.94 Removing masonry, old abutment, per cub. yard. . . 1.90 Removing timber platform per cubic ft . . 2.00 Removing piles, each 50.00 50.00 Embankment per cubic yard ' .. . .28 Masonry. Foundations per perch of 25 cubic ft 6.50 8.10 Retaining walls '^ " 8.00 8.70 Old abutments (additions) " 11.00 9.50 Shaft with base for stone columns, cu. ft _ . . 8.00 9.80 Pitched ashler per perch of 25 '' 14.00 20.00 Drafted " " " " 20.00 22.00 Piers for columns "' " " 22.00 22.00 Belting courses per cubic foot 3.00 1.80 Cornice '' " 8.00 2.80 Stone pedestals " " 6.55 3.50 Coping eight inches per square foot 2.40 i . 50 Coping ten " " " 2.60 1.85 Coping thirteen '^ ^' " 2.85 1.95 Flagging inches '' " .50 .50 Curbstone, twenty-six inches deep per lineal ft 2,00 1.60 Curbstone, twelve '' " " 1.40 i.oo Curbstone reset " ^' "... .20 .15 Stone block pavement per square yard 3.00 3.00 Cobble pavement, relaid, " ^' ,40 .40 Wooden pavement " ^' 4.00 3.50 Iron Work. Wrought-iron per pound .. .09 Cast-iron per pound .. .05 X Cast-iron balustrade per lineal foot . . . . 9.80 Wrought-iron railing " " .. 5,40 Cast-iron railing pedestals each — .. 40.00 Cast-iron columns each. ..,.-- » .. 80.00 BIDS OR PROPOSALS. 24 1 One globe lamp and Stand, with connections, each .. 65. ck) Three " " *' " each .. 120.00 Main bridge superstructure .. 750.00 Thirtieth street trusses, &:c .. 128.00 Pneumatic piling, including masonry .. 12,000.00 Removing old bridge .. 4,50000 Amount allowed to the city for materials of old bridge .. 4,000.00 Chief Engineer Kneass announced that he would be prepared to report upon the proposals submitted at an early day. Also, that it was understood by the contractors that all proposals were exclusive of the work on the west- ern approaches, which would be done, it was proposed, by the Pennsylvania Railroad Company for $47,000, at a clear saving of $67,000 to the city. 242 QUESTIONS. QUESTIONS ON THE FIFTH CHAPTER. Page 219. Define genuine and straw bids. Who prepares the forms of bids and issues the instructions to bidders ? How should proposals be en- dorsed and presented ? Page 220. Who are the guarantors ? and how many are required in gov- ernment contracts ? Why is not the name of a firm sufficient ? What is required concerning residence and prices ? What amount is withheld from the monthly or periodical payments ? and why ? What forms shall be used, for the contract ? For what causes may bids be rejected ? Page 221. When will payments be made? Why are transfers of con- tracts prohibited ? What security is required for the performance of the work ? Why may bids not be received by telegraph ? Why should the advertisement and specifications be attached to the bids ? Why should bidders be present at the opening ? State the law relating to the opening of bids. Page 222. Why is the time for beginning work limited to ten days from the date of signing the contract ? Page 223 et seq. Prepare and fill up a form of proposal. Fill up a blank guaranty, a bond, and form for bondsman's oath. Page 229 et seq. What are the requirements in bids for sewers ? What is the form of proposal ? How should it be filled up ? What are the con- ditions of the bond ? Page 231 et seq. State the classification and method of arranging the items in bids for grading and masonry, as used on the P. R. R. Page 233. Give the headings in the tabular form for tunnel proposals. Page 234. What are the principal items in the bid for an iron bridge on the Easton & Amboy Railroad. Page 235. When should the bids be opened? Describe the method of proceeding. Page 236. State the form of table given for computing results of bids on sewers and its defects. What improvement is suggested ? Page 237. What criticisms are made on the bids ? What are the objec- tions to letting work of this kind by the lineal foot ? Page 238. What is to be done when two bids are equal ? How are the successful parties to be notified ? Page 239 et seq. How are bids on the superstructure of bridges gener. ally made ? The student should fill up bids for any piece of work which may be advertised in the daily papers. CHAPTER VI. The Contract. Veritaiis simplex, oraiio est. A contract {con^ together, traho, to draw,) is an DefinUJon. agreement to do a certain thing, such as performing work, fur- nishing supplies, or delivering materials, and is based upon a mutual understanding of the amount and nature of the work to be done by the contracting parties. That there may be no mis- conception concerning the intention of the parties, everything tending to throw light upon the subject-matter should be em- bodied in and form a part of the contract. Hence it is that the advcrtisevients^ specification, drazvings, proposals and Component pans. agreements all form essential parts thereof. They should be made out in duplicate, that each party may retain a copy, ^^j, „^, i^^^py, and if there be more than two parties, as sometimes ^^^^• occurs, each should be furnished a copy. There is practically no limit to the number of parties entering into a contract, although some authorities assert that there can be but two. There may be as many as there are interests in- volved in the proposed subject for agreement, as is instanced in the combination for mutual protection in the case of common carriers or transporters of merchandise or products. Contracts are classified with reference to their form and objects into 244 f contracts. Contracts or Agreements > t/5 »— 1 W X M ST' 2. 1— 1 w It" f^' Ui o > •-^ p P CD •-t H O 3 > o CO P p r+ a- en p <-^ P 3* p <' o 1— • •-t c-f- O pu c 5' P^ O O & 3 ►t !^* n> 1— • o O o Crq £-P r^^ £Jn) CD r^ w 2 5 O 3 P P ., ^' n. ?<. ^ P P p oq CD 2.35^3 O "^ n P"i->oP n> p S 1 « " 5^ H) ;^ 5 f» /^ fj CONTRACTS. 245 The Four Essential Constituent Elements of all The four element. Contracts are — 1. That there shall be appropriate parties. 2. That there shall be 7nutual consent to the terms of the agreement. 3. That there shall be a valid consideration^ actual or pre- sumed. 4. And that there shall be a definite snbject-niatter to be acted on. 7. — TJie Parties. There must be at least two parties, either indi- Jrmo're!'""~''^° viduals or corporations, but there may be more. Those having something to be offered or done are designated as or the first pan. of the first part ; those proposing to purchase or do the thing as the parties of the second part. All persons are Ofthe second pan. capable of entering into contracts excepting those ^,j o^g who lack sufficient age, as infants \ or who may be ^4^^ t*^°,Xn ?' of unsound mind, as idiots or lunatics ; too;ether ^^'°'^. "T '""-'^'ics, ' JO married women, with married women, aliens, seamen, dninkards, and ^''^"f- ^f^^'l' ' ' ' ' drunkards and in some instances, bankrupts. By infancy, at law, is bankrupts. meant a person under twenty-one years of age, although some States make an exception in favor of women at eighteen. Idiots and lunatics being presumed to be incapable of under- standing the nature of an obligation, or its subject-matter, can- not, therefore, bind themselves in a contract. But insane persons having lucid intervals may make agree- ments under seal at those times. A contract signed by a person who has been in- Drunkards. toxicated by a drug or spirits to such an extent as to prevent rea- sonable action is void as having been obtained through fjlvud, before which nothing stands. So of a contract obtained through imposition upon weak minded persons. By marriage the legal rights of women are Married women. merged into those of their husbands, but in some States the laws are being relaxed in this respect. Persons who are forced into contracts by duress, Compulsory signa- '' ' tures. either through imprisonment or reasonable fear of injury to life or limb, are excused from their fulfilment. 246 CONTRACTS. Parties may make contracts on their own behalf Agents. or by duly authorized agents or representatives. A corporation, however numerous its members Corporations. may be, is regarded as a single individual, and it can generally only contract by deed under the corporate seaL 2. — Mutual Consent. There is no contract in law until the parties to it Agreement, have agreed upon the same thing in the same sense. Fraud an- nuls all obligation and all contracts into which it Fraud. enters, and the law relieves the party defrauded, but the party acting fraudulently cannot set his own fraud aside for his own benefit.* An assent to a proposition is a simple and direct Assent. affirmative. If any condition be imposed by the party accept- ing, they must first be approved by the other party before a con- tract can be made. If any offer be made on time for which a con- offers on time, sideration is allowed, the party offering cannot withdraw before the expiration of that time, but if there be no consideration he may revoke it at any reasonable time before acceptance, but not after. An offer made by letter holds good until a notice By correspondence of its withdrawal reaches the party to whom it was made; and an acceptance is complete as soon as the letter containing it is mailed, whether received or not. A withdrawal may be made by telegraph to anticipate the letter containing the proposal, be- fore it could have been received and accepted. » J . — The Consideration. The consideration gives to a contract a legal, as distinguished from a moral validity ; for naked promises are not enforceable in law. The consideration is the cause, price or rea- Defined— good or son for the promise. It may be what is technically ''^'^^^^^''• called good, as a natural affection, or it may be valuable pecuni- arily, as in the payment of money, performance of work, for- bearance to sue in certain cases, delivery of property, etc. * Jeremiah xxLi.: 13. CONTRACTS. 247 A legal consideration is necessary to the validity Lepai consideration of every contract, and a seal upon a written instru- "•-■''"'^^'^• ment is regarded in law as an evidence of such consideration. The validity is not affected by the adequacy of the Adequacy of co..- ^ -r >■ •' sidcration docs n(jt consideration, as that is a matter supposed to have affect validity. been fully determined before the closing of the agreement. If a consideration be illegal or impossible, iik-gai or impossi- as from sickness, etc., the contract founded upon it "^ '^°"^' cratioas. becomes nugatory. Or, should an apparently valuable and sufficient if the considera- tion becomes consideration become worthless before part per- worthless. formance on either side, the promise cannot be enforced, and money paid can be recovered. ^. — Subject Matter. Contracts may be made upon any subject with the exception of anythincT iHe^ral or immoral. The subject must May be anything -' •-> <-> •' not illegal or im- be some act agreed to be done, as some mcchani- ™orai. cal labor in the production of articles, some personal service ren- dered, or some property transferred. It is understood that the parties contracting in- J^iiy^midlrsto^. tend to do what is just and fair, and are not to be governed by the private intentions or mental reservations of cither, but by the impressions produced upon one another by their mutual expressions, and as each must have understood the other. A perfect contract when made is in the nature of a perfect contract , , , . . , . , . is a private Law. a private law, and binds the parties according to their intentions. Hence in case of dispute, upon an oral agree- ment, the intention must be proved by evidence, iforai.ev-idence ' r J y may be admitted to but if the contract be in writing- it proves itself and prove intention but o ^ not if written. no evidence is admissible to vary the contract or affect its obh- gation. Evidence may be admitted, however, to prove the iden- tity of the parties or of the things forming the subject-matter or to explain its meaning, and for this purpose experts may be ad- mitted to testify.* * Hence, in the case of Malone vs. the City of Philadelphia, for non-payment for work done and service rendered in constructing the Hart Creek Sewer, Judge Mitchell ruled out the testimony pro- posed by e.xperts on the grounds that it was intended to dispute the amounts of the estimates approved by the Chief Engineer and Surveyor, and not to explain technicalities. As this is an important case and furnishes a good practical illustration of many legal points; some e.xtracts from it will be found given at the end of this ckapter. 248 CONTRACTS. " Generally speaking all written instruments are S^'wS. ""^^"'"^ construed and interpreted by the I9.W according to the simple,, customary and natural meaning of the Vords used." If the wording be so obscure as to convey no Obscure contracts null. idea of the intention, the instrument must be set aside. In determining the intention of the parties or the ii^fluen^e of cus- meanings of the words used, custom or usage * has *°"' ^'^ "^^^e- great weight when it has been long established, and is not merely casual or is uniform and general, not personal and known to all the parties. But if the custom be illegal, unreasonable or op- pressive, it will be inert, or it may be excluded by the express provisions of the contract even when well established.! In addition to these four essential elements there other conditions. are other conditions which will modify the terms of the agree- ment, such as the time and manner of making payments^ time of beginning and completing work, penalties for non perfoi^mancCy stip- ulations concerning extra work, provision for and precautions against accidents, &c., all of which will be more fully explained and illus- trated in the following pages. General Duties. The general duties of each party should be stated j^^^j^^ ^^ ^^^ separately. The contractor agrees to perform a p^"^^"- certain piece of work which should be carefully described, and the employer to pay a certain reward in a specified manner and currency. The general stipulations concerning the r^^^^^ ^^ ^^^ contractor are ist, that he shall 7?;/zV// tJie work ; 2d, contractor. to exercise care and skill in its performance ; 3d, that he shall complete it in a given time ; 4th, to comply with particular stip- ulations as to the manner of performance, &c. These should all be clearly expressed by themselves and not confused with those of the other party. The duties of the employer are 1st, to make the ^j^^^^ ^^ ^j^^ payments at the times agreed upon ; 2d, to assist ^^'"pioyer. the contractor in the execution of his contract, and not impede * E. g : "A man agreed to pay a carpenter 12 shillings a day for all the men he employed on a cer- tain building. The carpenter proved that by the usage of that trade "a day" meant ten hours work, and as his men had worked twelve and a half he was permitted to charge fifteen shillings for i jE^ days^ for every day so spent." t Parson's Laws of Business. CONTRACTS. 249 him nor throw obstacles in his way. For instance, when the em- ployer agrees to provide the materials he should cause them to be delivered before required, that the contractor may not be un- necessarily delayed in the completion of his work. Payments. Payments may be made by instalments based Payments. on monthly estimates of work done, or they may be made at once on the completion and delivery of the work. In the former case it is customary to reserve a portion of the amount due, varying from lO to 20 per centum, to insure completion. In the latter case, i. e. when the work is to be Risk of accident f ' ^ -i t r 1 -1 r ^^ • ^ , rests upon contrac- nnished before payment, the risk of all accidents, tor. either from fire, flood, or other agents, rests upon the contractor, but if there be no contract or custom requiring the work to be done before payment, the workman is entitled to pay for what he has done in the event of accident, fire, &c., provided it be not caused by his neglect of proper precautions. The contractor cannot claim a payment until the no payment before work has passed into the hands of his employer, ^^^''^^''y- but if the latter should decline to receive the work the contrac- tor may bring an action to compel acceptance. Payments may also be made by instalments, based Payments by in- . -r 1 • r IT 1 stalment based on on a certain specined quantity of work. In such work done. cases nothing can be claimed until all the work required to en- title the contractor to a payment has been done. Should he stop before reaching that point, nothing can be recovered, but other- wise he is entitled to be paid for his work as it proceeds. If the contractor be required to obtain the cer- Certificates must .' r 1^ c ~r^ • \ ^ • t be obtained if re- tincate oi an lingineer. Architect, or Inspector ^s to quired. the quality or quantity of the work, before payments are made, it must be done before he can claim a settlement. Payment of Penalties for Delays. If the contract provide for the payment of a pen- Penalty for non- ••• i- J -C^ performance a debt alty for delay in completing work it is a debt from to employer. the contractor to the employer, and may be recovered by ai\ action; but should the contractor be delayed by if contractor be the employer in the commencement of the work employer.^ 250 CONTRACTS. or during its progress, he is not responsible for not completing in time or for the penalty. A breach of the contract by the employer which -^ ^\^^^^ ^y J Jr y employer. does not operate to prevent completion of work within the time specified, and which may be compensated in dam- ages, does not excuse the contractor from performance or from the payment of the penalty for delay ; neither is he excused if additional work is ordered for which extra time Extra work. has been allowed. Time. When there is no time specified the work must be done within a reasonable period. The limit of a fixed time is the last moment of Limit of time. the day named, that is twelve o'clock at night, and in estimating the time, the day from which it is counted should be excluded. When tiiTie is expressed in months, the calender Calender months. months are intended, as six months from the 15th day of January would be until the midnight between the 15th and i6th of the July following. Limitations. The Statute of Limitations differs in different Limitations, states, but generally it enacts that all actions at law For simple cases in simple cases, that is, those which do not rest on ^'"^ y^^""^- a seal or judgment, must be entered within six years from the time when they become due, and in the case of sealed instru- ments an action at law may be entered at any time before the expiration of twenty years. tractftwenty^y^ars. Gjiaranty. A guaranty is generally required of persons bid- Guaranty, ding for public works, but not usually in contracts with corpora- tions or private parties. It is a special promise to be responsible for the i^efined payment of some debt or the performance of some obligation in case of the failure of another person who is primarily liable for such payment or performance. It requires all the its requirements, elements necessary to give contracts validity. CONTRACTS. 2$ I Wntte?t Contracts. The Statute of 2d June, 1862, relating to Government con- tracts in writing is as follows : ^ 3709. It shall be the duty of the Secretary of War, of the Secretary of the Navy, and of the Secretary of the Interior, to cause and require every contract made by them severally on behalf of the Government, or by their officers under them appointed to make such contracts, to be reduced to writing and signed by the contracting parties, with their names at the end thereof; a copy of which shall be filed by the officer making and signing the contract in the Returns Office of the Department of the Interior, as soon after the contract is made as possible, and within thirty (30) days, together with all bids, offers and proposals to him made by persons to obtain the same, and with a copy of any advertisement he may have published inviting bids, offers or proposals for the same. All the copies and papers in relation to each contract shall be attached together by a ribbon and seal, and marked by numbers in regular order, according to the number of the papers comprising the whole number. 21; Tuly, 1868. $3733. No contract shall be entered into Appropriations re- , ^/ ^' . >^J/-^J ^ . ■, . r 1 1- 1 -1 T quired before mak- for the erection, repair or hnishing of any public building, ing contracts. or for any public improvement whatever, which shall bind the Government to pay a larger sum of money than the amount in the Treasury appropriated for the specific purpose. The annexed forms are given to fully illustrate the preceding principles. The first is the general form as used by the Engineer Corps U. S. A. with its accompanying bond. Articles of Agreement entered into this day of eighteen hundred and (18 ,) between , Corps of Engineers U. S. Army, for and in behalf of the United States of the first part, and , partners, doing business under the firm-name of , of- , in the county of , State of , of the second part : This agreement witnesseth that the said parties have mutually agreed, and by these presents do mutually covenant and agree, to and with each other in the manner following, namely : That the said shall, in conformity with the advertisement aud specifications hereunto attached, and which form a part of this contract, . . . 252 CONTRACTS. That all materials furnished and work done under this contract shall, be- fore being acceptedj be subject to a rigid inspection by an inspector ap- pointed on the part of the Government, and such as. , not conform to the specifications set forth in this contract shall be rejected. The decision of the engineer officer in charge as to quality and quantity shall be final. That the said shall commence on or before the - day of ., eighteen hundred and , (18 ,) and shall complete the on or before the .day of , eighteen hundred and (18 .) That payment shall be made when the .contracted for shall have been delivered and accepted, reserving per centum from each payment until the whole shall have been so delivered and accepted. And it is also agreed that if, in any event, the party of the second part shall delay or fail to commence with the delivery of the material or the per- formance of the work at the day specified herein, or shall, in the judgment of the engineer in charge, fail to prosecute faithfully and diligently the work in accordance with the specifications and requirements of this contract, then, in either case, the party of the first part, or his successor legally appointed, shall have power, with the sanction of the Chief of Engineers, to annul this contract by giving notice in writing to that effect to the party (or par- ties, or either of them) of the second part ; and, upon the giving of such notice, all money or reserved percentage due or to become due to the party or parties of the second part by reason of this contract shall be and be- come forfeited to the United States ; and the party of the first part shall be thereupon authorized, if an immediate performance of the work or delivery of the materials be in his opinion required by the public exigency, to pro- ceed to provide for the same by open purchase or contract, as prescribed in section 3709 of the Revised Statutes of the United States : Provided, how- ever, that if the party (or parties) of the second part shall by freshets, i-ce, or other force or violence of the elements, and by no fault of his or their own, be prevented either from commencing or completing the work, or de- livering the materials at the time agreed upon in this contract, such addi- tional time may, in writing, be allowed him or them for such commence- ment or completion as, in the judgment of the par-ty of the first part, or his successor, shall be just and reasonable ; but such allowance and extension shall in no manner affect the rights or obligations of the parties under this contract, but the same shall subsist, take effect, and be enforceable precisely as if the new date for such commencement or completion had been the date originally herein agreed upon. And it is further expressly understood and agreed that no claim whatever shall at any time be made upon the United States by the party or parties of the second part, for or on account of any extra work or material performed or furnished, or alleged to have been performed or furnished, under or by virtue of this contract, and not expressly bargained for and specifically in- CONTRACTS. 253 eluded therein, unless such extra worker materials shall have been expressly required in writing by the party of the first part or his successor, the prices and quantities thereof having been first agreed upon by the contracting parties, and approved by the Chief of Engineers. And it is also further agreed by the parties of the second part, as required by the 14th section of the act of Congress approved July 17, 1S62, that neither this contract nor any interest therein shall be transferred to any other party or parties, and that any such transfer shall cause the annulment of the contract as far as the United States are concerned. No member of Congress, officer or agent of the Government, or any person employed in the public service, shall be admitted to any share here- in, or any benefit which may arise herefrom. In witness whereof the undersigned have hereunto placed their hands and seals the day and date first above written. (Executed in quintuplicate.) Witnesses : [L. SI* [L.S.] I do solemnly swear that the copy of contract hereto annexed is an exact copy of a contract made by me personally with ; that I made the same fairly, without any benefit or advantage corruptly to the said or any other person ; and that the papers accompanying include all those relating to the said contract as re- quired by statute in such case made and provided. of Engineers. Subscribed and sworn to before me this day of Bond. Know all men by these presents, That we, are held and firmly bound to the United States of America in the sum of. lawful money of the United States ; for which payment, well and truly to be made, we bind ourselves and each of us, our and each of our heirs, executors, and administrators, for and in the whole, jointly and severally, firmly by these presents. Sealed with our seals, dated the day of. in the year of our Lord eighteen hundred and seventy- (187 .) The condition of this obligation is such, that whereas certain articles of agreement, bearing date the day of , 187 , have been entered into by and between , Corps of Engineers, U. S. Army, acting for and in behalf of the said United States, and the above L. S. Locus Szgy'li, the place of the seaL 254 CONTRACTS. bounden , for , at.. Now if the above bounden. shall, for and during the per- iod during which the said articles of agreement shall, by their original terms, as well as by reason of any extension of time which, as provided in said articles, may be granted for their performance, continue in force, duly and fully observe, comply with, and perform all and singular the terms, conditions, covenants, and agreements which, on the part of the said , are in said articles of agreement covenanted and agreed to be observed, complied with, and performed, then this obligation shall be void ; otherwise, shall remain in full force and virtue. In presence of us : U. S. Light- House Board, See pages 77, .XX, «7. Contract. Articles of Agreement, made and entered into between. - , of the county of. and State of. .of the first part, and Parties. acting for and in behalf of the United Sta,tes of America, of the second part, wit- nesseth : That the part of the first part, in consideration of the matter? herein- after referred to and set out, and of the specifications at- Terms or condi- . ' r 1 • tions for party of tached hereto, and formmg a part of this contract, covenant first part. and agree , to and with the party of the second part, to furnish all the ma- terials and labor necessary to completely construct, erect at the workshop, take down after acceptance, and deliver (except the woodwork, the glass for the lantern, the lens, lamps, and other furniture belonging thereto), on board vessel at the port of. *- , on or before the. » _ - . . day of , anno Domini one thousand eight hundred and seventy- the metal work for the „, , . , c 1-11 V c^ -i T 1 T Place and time of superstructure for a lighthouse for Southwest Ledge, Long delivering materiak * Must be sealed with wax or other adhesive substance. CONTRACTS. 255 Island Sound, and that the said .shall commence '''"!'= '''" bcginninij work. on or before the day of , eighteen hundred and , (i8 ). And the said part of the first part further agree to forfeit the sum of twenty dollars per day, as liquidated damages, for each and Liquidated every day's delay in completing the work after the said date, ^'^'"^s"- said amount to be deducted from any sum due the said part of the first part in the hands of the Light-House Establishment, and to conform in every particular to the stipulations and conditions specified in this Specifications to r r r toTm part of con- contract, and to the specifications and drawings hereto an- tract. nexed, and which are to be considered as a part of this contract. The part of the first part agree to be governed in all matters regard- ing the work by the party of the second part, or the authorized agent thereof, and that every portion of said work shall be subjected to a rigid inspection by the party of the second part, or his agents appointed • n and therefor, and that this inspection shall be final. approval. And the party of the second part covenants and agrees to ^-'^^y of second pay the part of the first part, as full consideration and I . - , - .,,.-, Consideration and price of and for said light-house payment 'upon receiving satisfactory evidence that the work has been upon evidence. completed and delivered in accordance with the terms of this contract, and to the-satisfaction of the authorized agent of the party of the second part : Provided, however, that in case the party of the second For failure to com- part shall at any time be of opinion that this contract is not ^ork may'^be sus°-"^ duly complied with by the part of the first part, or that pended end party . . . , ^ . , ,' .. of first part pay it is not in due progress of execution, or that the said part damages. of the first part irregular or negligent, in such case he, the said party of the second part shall be authorized to declare this contract forfeited, and thereupon the same shall become null, and the part of the first part shall have no appeal from the opinion and decision aforesaid; and the right to except to or question the same, in any place or under any circumstances whatever, is hereby released by the part of the first part ; but the part of the first part shall remain liable to the party of the second part for the damages occasioned to him by the said non-compliance, irregularity, or neg- ligence, and that all money or reserved percentage that may be due by vir- tue of the provisions of thjs contract will be forfeited to the party of the second part. And it is further stipulated and agreed that no member of Improper influence — . iii-Li'3 1 ri- "^ secunng con- Congress shall be admitted to any share or part of this con- tracts or appropria- tract or agreement, or to any benefit to arise therefrom ; and ^^°"^ ^°'' ^°'^^- this contract shall be in all its parts subject to the terms and requisitions of 2^6 CONTRACTS. an act of Congress passed on the twenty-first day of April, in the year of our Lord one thousand eight hundred and eight, entitled " An Act concerning public contracts." And this contract is also expressly understood to be sub- Law limiting , . ,.. .... ,. - amonnt of contracts J ect to the terms and conditions of the joint resolution of to appropriations. Congress approved April fourteenth, one thousand eight hundred and fifty-two, containing a proviso in the following terms, viz : '' Provided noth- ing herein contained shall be so construed as to authorize any officer or agent of the United States to bind the United States by contract beyond the amount appropriated by Congress, or to sanction any such contract hereto- fore made." And it is further covenanted and agreed, that no person Excluding employ- 1 • 1 1 . , -r • , Ix -r- 1 ,- -, ers and U. S. offi- connected with, or engaged m the Light-House Establish- ciais under penalty ment service shall be allowed to contract for labor or materials, nor to be in- terested in this contract, nor to any benefit to arise therefrom ; and for any violation of this covenant and agreement the part of the first part shall forfeit all moneys which may become due under this contract. Provided, also, that it is expressly understood and agreed Not to be sub-let T 1 . -in 111 • 1 1 ^01^ assigned. that this contract shall not be sub-let nor assigned; but that it shall be well and truly carried out and fulfilled in good faith by the above recited part of the first part, and that payment on Payments to be account thereof shall be made to the aforesaid part of ^ade^" ^^^ ^ the first part, heirs, executors, or administra- tors, or to such person or persons as may lawfully authorize, by power of attorney, to receive the same. And provided further, that this contract shall not be bind- Contract subject to 1 t r^ •1-1111 1 ■! t"^ approval oi L,t. mg upon the United States until it shall have been approved House Board. by the Light House Board. ^ ~ And for the true and faithful performance of all and sin- Mutual consent, gular the covenants, articles and agreements hereinbefore particularly set forth, the subscribers hereunto bind themselves, jointly and severally, their and each of their successors, heirs, executors, and administrators. Bondsmen' s Oaths, State of. County of... _ , being duly sworn, deposes and says that he resides at No , street, in the of. in the State of- - ; and that the value .of his property, over and above all debts and liabilities incurred by him, is over dollars, ($ ,) and that he is fully responsible for the amount of his obligation in the foregoing bond by him executed. ss. Sworn and subscribed this day of. , 187 , before me. ---[L.S.] CONTRACTS. 2$/ ss: State of County of. , being duly sworn, deposes and says that "he resides at No street, in the of in the State of. ; and that the value of his property, over and above all debts and liabilities incurred by him, is over dollars, ($ ,) and that he is fully responsible for the amount of his obligation in the foregoing bond by him executed. Sworn and subscribed this day of , 187 , before me. ,[L. S.] Certificate of Solvency. I certify that I have made due and diligent personal inquiry as to the ability of the signers of the foregoing bond, and am satisfied that they are good and sufficient, and fully responsible for the sum of dollars, ($ ) each. Date Notes. — The sureties' certificate of solvency must be signed by an officer of the Government known to the Treasury Department. Each surety will qualify in double the amount of the bond. Form of Bo7id with Contract. Know all men by these presents that we, , citizens of State of are held and firmly bound unto the United States of America in the sum of dollars, ($ ), lawful money of the said United States of America, as liquidated damages, to be paid to the United States of America or its authorized agent ; for which payment, well and truly to be made, we, and each of us, do bind ourselves, and each of our heirs, execu- tors, and administrators, jointly and severally, firmly by these presents. Sealed with our seals, and dated this day of anno Domini one thousand eight hundred and seventy- Whereas the above- bounden by an instrument in writing, under hand and seal , dated the of , contracted with the United States of America to construct and deliver the metal work for the superstructure of the light-house for Southwest Ledge, Long Island Sound, on the conditions and for the consid- erations in the annexed and preceding contract, according to the specifica- tions contained in or annexed to said contract and the plans alluded or re- ferred to in the same ; Now, therefore, the condition of the above obligation is such, that if the said Q 25 S CONTRACTS. shall well and truly, and in good, sufficient, and workmanlike manner, fur- nish and deliver the said light-house mentioned in the aforesaid contract, and complete the same in accordance with the terms and provisions therein stipulated, and in each and every respect fully cbmply with the conditions therein contained, then this obligation to be void ; otherwise, to remain in. full force and virtue. Signed and sealed in the presence of — Witnesses : [L.S.] |L. S] --^ - - [L. S.] [L S.] Notes. — All the signatures of bidders, contractor and sureties chould have affixed to them seals of wax or wafer, and their first names should be written in full, The residence of sureties and witnesses should be given. The bondsmen must qualify in the forms following. Thus covenanted, made, and agreed by the parties this ^^t^ day of anno Domini one thousand eight hundred and seventy- , as witness their hands and seals. _____ [Seal. 1 Signature of parties I: ^ , T under seal. [Seal. J [Seal.] [Seal.] [Seal.] Signed, sealed, and delivered in presence of — Witnesses : Witnesses* CONTRACTS. 2S (Signed) W. N. ASHMAN. ) W. S. STOKLEY, [Seal.] See page 104. CONTRACT For Completion of Cool Spring Reservoir, Wilmington, Del, This agreement made this Seventeejtth day of July, one thousand eight hundred and seventy-seve^t, between P. F. C • and J. K , of the City of Philadelphia, State of Peujisylvania, oi \h^ ^xsX. part, and fohn P. Allmond, fames Bradford, and CcEsar A. Rodney, Water Com- missioners of the City of Wilmington, State of Delaware, of the second part. (The above mentioned Commissioners were appointed by act of the Gen- eral Assembly of the State of Delaware, passed at Dover on the twentieth day of March, One Thousand Eight hundred and Seventy-Seven.) Witnesseth, that the said P. F. C and f.K , in consideration of the covenants of the said Con:missioners, hereinafter contained, do cov- enant and agree to and with the said Commissioners to complete the North Basin of the Cool Spring Reservoir in the time and manner as required by the attached printed Specifications (see page ) and in accordance with the plans and directions of the Engineer in charge of the said work ; also to complete the South Basin of said Reservoir at such time as may hereafter be fixed by said Commissioners and under the conditions of section first of the attached specifications. \nd the said Commissioners do covenant and agree to pay to the said C Sr' K , the sum of Thirty-three thousand dollars (%3,ooo) at the times and in the manner specified in article thirty-four (34) of the at- tached specifications, for the material and labor required to complete the CONTRACTS. 263 North Basin of the said Reservoir, and also to pay the said C &^ A" at the times and in the manner specified in Article Thirty-four (34) of the attached specifications, the sum of Thirty-six thousand dollars (36,000) sub- ject to the conditions of Article First of said specifications for the labor and material required to complete the South Basin of said Reservoir. And it is mutually agreed by both parties to this contract that they shall be governed in all things relating to the work at Cool Spring Reservoir by the attached printed specifications or by such alterations or modifications of the same as shall hereafter be agreed upon by said parties. In witness whereof we have hereunto set our hands and seals this seven- teenth day of July, one thousand eight hundred and seventy-seven. Signed, J. P. A , (seal) JAS. B , (seal) Witnesses : C. A. R , (seal) JOB. H. J , Water Comjiiissioiiers. WM. F , P. F. C , (seal) J. K , (seal) Co7iiractors. Bosto7i Aqueduct, Contract for Iron Pipe. Articles of agreement, made and concluded the day of in the year eighteen hundred and forty-seven, between of the one part, and the Water Commissioners of the City of Boston, of the other part, whereby it is covenanted and agreed as follows, to wit : the said hereby covenant and agree that will construct, furnish and deliver, in a good and sound condition, agreeable to the specifications here- inafter contained, on some wharf in the City of Boston, as may be designated by said Commissioners, a quantity of cast iron water pipes, as follows, to wit : including such variety of branch, curve, bevel hub, double hub, hydrant bends, taper pipes, sleeve pieces, and such other pieces for connecting with 264 CONTRACTS. those above designated, as may be required by the said commissioners. It is understood that the diameter of pipes refers to the interior diameter. The pipes to be constructed so as to form, in laying down, Kmdofjomt. the connection designated as the faucet and spigot joint. The dimensions and form of the hub, or socket end, and also the bead on the spigot end, are to be made in conformity with the plan submitted by the Chief Engineer, in the employ of the Water Commissioners. The single hub pipes, including taper pipes and curved pipes, with the ordinary straight pipes, are to be made in lengths of 9 feet. Length of pieces, including the hub or socket. The double hub pipes are to be in lengths or pieces of 4 feet. The branch pieces are to have such length as will allow the joints to' be conveniently made, beyond the curvatures of the several branches. The sleeve pieces will vary in dimensions, so as to suit the different-sized pipes, according to the drawing of the aforesaid engineer. The thickness of metal to be, for 30-inch pipes, i inch ; Thickness of metal, for ?4-inch pipes, J^ ; for 20 and 16-inch pipes, %. ; for 12, 6 and 4-inch }^ of an inch. The pipes to be made from pig iron, of a quality Character of casting to make a sound and strong casting, and such as will bear drilling and filing,. and be cast from a cupola or air furnace. All straight pipes to be cast in a vertical position with the hub end down, and all other pipes to be cast in the same position, so far as their form will permit. Care shall be taken to guard against the pipes falling short Uniformity in of the specified diameter in the inside, and that they do not exceed the specified diameter more than 3-16 of an inch, for 16-inch pipes, and a proportionate excess for pipes of intermediate and smaller sizes ; and that in all cases they have such uniformity in diameter as will not impair the facility of making the lead joint ; and to guard against inconvenience ia assorting the pipes, the said contractor agree to put a conspicuous mark on each end of each piece of pipe that exceeds the exact diameter, by which the varying diameters may be designated and known, to wit : those that exceed the exact diameter by the least amount, are to be designated as No. I. Those that exceed the exact diameter by the next largest amount, as No. 2. And those that exceed the exact diameter by the largest amount, as No. 3. The pipes shall be uniform in the thickness of metal, as Thickness of metal, . uniform. specified for the several dmerent sizes or diameters, and care taken that they shall not be less than the specified thickness, nor exceed the same, more than will produce an extra weight, or a deficiency of weight of one hundred pounds per piece of 30-inch pipe, eighty pounds per piece of 24-inch pipe, seventy pounds per piece of 20-inch pipe, fifty-five pounds per piece of 16-inch pipe, forty pounds per piece of 12-inch pipe, twenty pounds per piece of 6- inch pipe, and ten pounds per piece of 4-inch pipe, over a strict calculation of the contents specified, which is to be computed at the rate CONTRACTS. 265 of twenty-seven hundredths of a pound to one cubic inch of metal. And pipes not conforming to this spcciticalion shall be rejected. By uniformity of thickness is ilnderstood that the pipes shall not vary from the specified thickness more than 1-16 of an inch on either side. This uni- formity, and also the quality of the metal, shall be tested, in any manner the said engineer shall deem satisfactory. After delivery on the wharf, as before provided, the 30, 24 and 20-inch pipes are to be subjected to a proof of two hundred and fifty Proof. pounds pressure per square inch ; and all other pipes to a pressure of three hundred pounds per square inch. The pipes to be inspected and proved by, and under the direction of, the aforesaid engineer, and at the expense of the aforesaid commissioners. If any pipes are increased in thickness of metal, a corresponding increase of pressure in the proof will be applied. The pipes, branches and other pieces, to be furnished in Ordet of delivery, such order, in regard to the different kinds, as may be required by the aforesaid engineer, who will give bills specifying the order for delivery. The time of delivery to be as follows, to wit : Tons. n it it (( The said commissioners may increase the quantity of Quantity may be , ,,.,...,^ increased. pipes, beyond what is herein provided for, to any extent, not exceeding 10 per cent, of the specified amount, provided notice is given the Contractor of their decision to require it, at least three months before the time for the last delivery. In this contract a ton weight is understood to mean a Ton Weight. gross ton, or to contain 2,240 pounds. And the said Commissioners do hereby engage that, whenever in the opinion of the said Chief Engineer, this contract shall be wholly completed on the part of the said contractor , they will pay for said work as follows : For straight and taper pipe, For curved and branch pipe. The prices above specified to be in full compensation, and to include every charge for materials, workmanship and safe delivery, as provided in this contract. During the prosecution of this contract, the said Com- Monthly estimates missioners agree to pay, on the certificate of said Engineer, as the pipe are delivered in accordance with the terms and provisions of this contract, as follows : — That on the delivery of a lot or parcel, as herein provided, the 266 CONTRACTS. said Chief Engineer shall proceed to move the pipes to the yard or press prepared for the same, and after duly inspecting them and submitting them to the proof as herein provided, the said Engineer shall give a certificate of estimate for so much of said delivery as he shall find to meet the require- ments of this contract ; and the said Commissioners will pay to the said contractor within lo per cent, of the contract price, for the pipe included in said estimate. It being fully provided and expressly understood that the said estimate will not be made oftener than once per month. For a more full explanation of the form of the several pieces and parts, and the manner of providing for joints in all the details, the said Engi- neer will furnish plans or drawings of the several kinds of pipes herein provided, and give such directions from time to time as may appear to him necessary and proper, in order to make the work complete and perfect on the plan contemplated by this contract ; and also bills specifying the num- ber of pieces wanted of each ; and the said plans, directions, and bills shall in every respect be complied with. To prevent all disputes, it is hereby mutually agreed that the said Engi- neer shall in all cases determine the weight of the pipes de- Inspection, iivered under this contract, and inspect and prove the same ; and also that the said Engineer shall, in all cases, decide every question that can or may arise relating to the execution of this contract, on the part of the said con- tractor , and his estimate and decision shall be final and conclusive. It is further agreed that whenever this contract, in the opinion of the aforesaid Chief Engineer, shall be completely performed on Final certificate. the part of the said contractor , the said Engineer shall certify the same in writing under his hand ; together with his estimate of the amount of the same, according to the terms of the contract ; and the said Commissioners shall, within thirty days after the receipt oCsuch certificate, pay the said contractor , the sum or balance, which according to this contract shall be due. And it is further agreed that if, in the opinion of said Engineer, the con- tractor shall neglect or refuse to prosecute the work embraced in this con- tract, or perform the work in an improper manner, the said Engineer may certify the same in writing, to the said Commissioners, and in such case the said Commissioners shall have power to certify and declare that this con- tract has been violated and abandoned by the said contractor , and on making such certificate the said contract shall be deemed abandoned, and the said Commissioners may proceed to contract for the v/ork with any other person. It is hereby understood and agreed, that payment for the work herein contracted for shall be made in current bank notes of the city of Boston. And it is further agreed by the parties to this contract, that in the case of the absence or inability to act of the said Chief Engineer, then and in that case, the Principal Assistant Engineer, in the employment of the said CONTRACTS. 26/ Commissioners shall have, and is hereby invested with all the powers here- inbefore given to the said Chief Engineer in the premises. Signed, Sealed and Delivered in presence of See page no. Articles of Agreement Between the Trustees of the Univer- sity OF Pennsylvania and Messrs. Stkuthers & Sons. Aticles of Agreement made and entered into the day of March, in the year of our Lord one thousand eight hundred and seventy-one (187 1 ), between the Trustees of the University of Pennsylvania, of the lirst part, William Struthers, John Struthers, and William Struthers, Jr., all of the city of Philadelphia, copartners as contractors and builders, under the firm of Struthers & Sons, of the second part. The said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, for themselves jointly and severally, and for their respective executors and administrators, and for every of them do, and each of them doth hereby covenant and promise, and agree to and with the said The Trustees of the University of Pennsylvania, and their successors in manner following ; that is to say, that they, the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their several executors and administrators, for and in consideration of the sum of two hundred and thirty-one thousand nine dollars, to be paid to them by the said parties of the first part, at the times and in the proportions herein- after set forth, shall and will at their own proper costs and expense for all material, carriage, labor, machines, insurance, and other charges, before the first day of August, in the year of our Lord one thousand eight hundred and seventy-two, with the best materials of the kinds specified and suitable for the proper purpose, substantially and in true workmanlike manner, to the entire satisfaction and under the supervision of Thomas W. Richards, the Architect appointed by said parties of the first part, and also with the approval of the Building Committee of the said The Trustees of the Uni- versity of Pennsylvania, erect, build, set up, and finish according to the true intent and meaning of, and conformably in every respect with the plans, elevations, sections, drawings, and dimensions hereby adopted, and the specifications hereunto annexed, a Building with its appurtenances for the use and accommodation of the said The Trustees of the University of Pennsylvania and their successors, on the lot of ground bounded by Thirty- fourth and Thirty-sixth streets, and by Locust and Spruce streets in the city of Philadelphia, and upon the site therein designated by the said Ar- chitect and Building Committee — it being hereby agreed and covenanted by and between the said parties of the first and second part that the speci- 268 CONTRACTS. fications severally signed by the respective parties, and hereunto annexed before the execution of these presents, together with the plans and draw- ings by attestation of the said parties bearing even date herewith, shall be as valid and as binding to all intents and purposes as if in these Articles particularly set forth or incorporated : and further, that the decision of the said Thomas W. Richards, the architect aforesaid, shall be final and con- clusive in any dispute which may arise by and between the parties hereto relative to the true purport and meaning of the plans and drawings hereby adopted, and of the specifications hereunto annexed ; and it is hereby cove- nanted and agreed, and distinctly understood by and between the parties to- this Agreement, that the said William Struthers, John Struthers, and Wil- liam Struthers, Jr., copartners as aforesaid, shall not let or transfer this contract for erecting the said Building to any other person or persons, but will severally give their supervision to its complete performance ; and it is hereby further covenanted and agreed by and between the said parties hereto, that upon notice from the Architect aforesaid, or from the Building Committee of the said parties of the first part, the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their respective executors or administrators, shall and will take down, change, alter and reconstruct at their own proper cost and expense, any and all unfit and unsatisfactory workmanship or materials made use of in the con- struction of the said Building, and the said Architect and Building Com- mittee shall jointly have the right to object to and to require the removal, change, and alteration of any and all materials and work not correspond- ing in quality and manner to those respectively designated in the specifica- tions hereunto annexed, provided nevertheless, that such removal, change, or alteration shall be required within two weeks next after the setting up or use of the materials or doing of the work objected to as aforesaid. And it is further covenanted and agreed by and between the said parties, that if the said parties of the first part shall, within three calendar months next after the date of these presents determine to have the said Building con- structed without the two Towers now marked on the plans hereby adopted, or to postpone the erection thereof, the sum of four thousand five hundred dollars shall be allowed by the said parties of the second part, and be de- ducted from the consideration money hereinbefore named ; and further, that if by like determination and direction, the terra cotta chimneys and pinnacles according to the said plans and specifications, shall be omitted, the sum of eight thousand dollars shall be allowed and deducted from the consideration money aforesaid, provided nevertheless, that notice in writing: of such intended omissions or alterations shall be given by the said parties of the first part within the said three months to the said parties of the second part. And it is hereby further covenanted and agreed by and be- tween the parties hereto, that in case any other omissions, alterations, ad- ditions or extra work from or to the said designs, plans, and specifi- cations shall, by the said Building Committee, be thought neces- CONTRACTS, 269 sary or expedient to be made or done during the course of the erec- tion or construction of any part of the said Building or its appurtenances, the said omissions, alterations, additions, or extra work shall not in any way affect or invalidate these Articles of Agreement, but the particulars in writing of such proposed omissions, or alterations, or additions shall be signed and delivered by the said Building Committee, or the Chairman thereof, to the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their several executors or administra- tors, who shall and will thereupon make and perform such additions or allow such omissions accordingly ; and thereupon if the said parties of the first and second part cannot forthwith agree upon the proper increase to or abatement from the consideration money hereinbefore named on account of the said additions, alterations, extra work, or omissions, then the same shall be referred to the decision of three disinterested persons, one of whom shall be chosen by each of the said parties, and they two shall call in an umpire, and the joint award or determination of a majority of the said referees rela- tive to the value of the said additions, extra work, alterations, or omissions, and of the consequent increase or abatement of the consideration money aforesaid shall be conclusive and binding upon both the said parties, their successors, or their executors and administrators respectively. And it is hereby further covenanted and agreed by and between the said parties of the first and second parts, that during the construction of the said Building, and until the completion thereof and its delivery to the said The Trustees of the University of Pennsylvania, and their successors, the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their several executors or administrators, shall and will save and keep harmless and indemnified the said parties of the first part and their successors from all actions, suits, costs, and penalties, by reason of any neglect of city ordinances, encroachments upon neighboring premises, or from any other misfeasance or nonfeasance, accident, neglect, or other cause whatsoever, by or through the acts or defaults of any person or per- sons employed by the said parties of the second part in the erection of the Building, and all losses, costs, damages, penalties, or expenses thereby in- curred or occasioned, shall be borne, suffered, and paid for by the said par- ties of the second part, their several executors or administrators. And it is hereby further covenanted and agreed by and between the said parties here- to, that the said parties of the second part, when and as often as by the said Building Committee so required, shall and will insure the said Build- ing, at the cost of the said contractors, from all general and special risks for such sums not exceeding two hundred thousand dollars? and in such fire insurance companies as the said Building Committee may approve, and shall and will forthwith assign and transfer the several polices of insurance to the said The Trustees of the University of Pennsylvania, and their suc- cessors, to be held by them unt'l the completion and delivery of the said Building, as security against any loss that might occur by the destruction or 2/0 CONTRACTS. injury of the said premises. And the said parties of the second part do hereby covenant and agree to and with the said parties of the first part, that on the first Monday of each and every month, commencing with the first Monday of June next ensuing the date hereof, and thereafter until the said Building shall be finished, they, the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their several executors or administrators, shall and will make out and furnish to the said Architect, or to the said Building Committee, a careful and detailed statement and ex- hibit of the materials used in and towards the actual erection and construc- tion of the said Building, and of the work done thereon during the month next preceding, not including in such statement any materials intended or prepared for use therein, if the same be not at the date of such statement actually and permanently set up or worked into the said Building, in ac- cordance with the plans and specifications hereby adopted, which said state- ment and exhibit shall be submitted to the said Architect, who shall ex- amine and verify the same, and shall thereupon determine the fair cash value of the materials and work therein specified, and from and out of the amount of each and every monthly valuation as aforesaid, ten per centum thereof shall be reserved and retained by the said The Trustees of the Uni- versity of Pennsylvania, and their successors, upon making each monthly payment as hereinafter provided, as a security and guaranty for the true and faithful performance of the agreements and covenants of the parties of the second part herein contained. And the said parties of the second part do hereby further covenant and agree with the said parties of the first part, that in case default shall be made in completing and finishing the said Building and its appurtenances, in accordance with these Articles of Agree- ment, and delivering the same to the said The Trustees of the University of Pennsylvania, and their successors, on or before the first day of August, in the year of our Lord one thousand eight hundred and seventy-two, it shall and may be lawful for the said parties of the first part to keep and re- tain out of any moneys in their possession to which, upon final settlement as hereinafter provided, the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their executors or adminis- trators, might or would be entitled, the sum of two thousand dollars for each and every calendar month, or the part of any calendar month, that default shall be made as aforesaid, not as a penalty, but as liquidated damages due by and received from the said parties so in default, and which liquidated damages the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, jointly and severally, and for their several executors and administrators, do and each of them doth hereby covenant and consent to be charged with, and to pay in the manner aforesaid to the said The Trustees of the University of Pennsylvania, and their successors. And the said The Trustees of the University of Pennsylvania, for themselves and their successors, do hereby covenant, promise, and agree to and with the said William CONTRACTS. 2/1 Striithers, John Struthcrs, and William Struthcrs, Jr., copartners as afore- said, their several executors and administrators, that for and in considera- tion of the erection, construction, and finishing of the aforesaid Building with its appurtenances, in conformity with the plans and specifications here- by adopted or hereunto annexed, as well as of the true and faithful perform- ance of all and every the covenants and agreements herein contained, on the part of the said parties of the second part, the said parties of the first part shall and will well and truly pay, or cause to be paid unto the said parties of the second part, the sum of two hundred and thirty-one thousand nine hundred dollars, subject to abatement therefrom or increase thereto in man- ner aforesaid, in the several instalments, and at the respective times herein- after mentioned for the payment thereof, that is to say, in each and every month during the construction of the said Building, such sum as by the statement of materials used and work done, and the valuation thereof by the said Architect, shall appear to be due, whenever and as soon as such valuation shall be determined, first, nevertheless, deducting therefrom ten per centum of the auiount thereof, to be reserved by the said parties of the tirst part as hereinbefore covenanted ; and when and as soon after the said Building with its appurtenances shall be completely erected, constructed, and finished, and ready for immediate occupancy, and all stone, soil, rub- bish, and superfluous matter shall have been entirely removed, and the said premises delivered up to the said The Trustees of the University of Penn- sylvania, that then the said The Trustees of the University of Pennsylvania, and their successors, shall and will well and truly pay or cause to be paid unto the said William Struthcrs, John Struthcrs, and William Struthcrs, Jr., copartners as aforesaid, their several executors and administrators, the full and entire balance and residue of the said sum of two hundred and thirty-one thousand nine hundred dollars (subject to abatement therefrom or increase thereto, in manner aforesaid, or deduction therefrom on default of completing the said building within specified time) then remaining due and unpaid, including all sums often per centum reserved from each and every monthly settlement as aforesaid, it being understood that no interest shall accrue or be payable upon any sums so reserved. And the said parties of the first part for themselves and their successors do hereby further covenant and agree to and with the parties of the second part, that upon the completion and delivery of the said building, they, the said '* The Trustees of the University of Pennsylvania," and their success- ors, shall and will purchase all policies of insurance effected as hereinbefore provided, to an amount not exceeding two hundred thousand dollars, and will pay, therefore the amount of premium paid by the said parties of the second part for the said several insurances, excepting, nevertheless, such part of the said premiums as shall at any time have been paid for extra risks while building. And it is hereby further covenanted and agreed by and between the said parties hereto, that whenever so required by either of the said parties of the first or second parts, the work done, and the materials 2/2 CONTRACTS. used in and towards the actual erection aud construction of the building and its appurtenances during any preceding period, not including any ma- terials intended or prepared for use therein, if the same be not bona fide and permanently set up or affixed in or to the said building in accordance with the plans and specifications aforesaid, shall be measured and estimated by three disinterested and competent persons, whereof one shall be chosen by each of the said parties, and they shall call in an umpire, and the joint award of a majority of the said referees, regard being had to the entire con- sideration money to be paid for the construction of the said building, shall be bmding and conclusive upon both the said parties, their successors or executors and administrators respectively, and all the costs and charges of such measurement and valuation shall be shared equally between the said parties ; and if, upon any such measurement and valuation, it shall appear that the aggregate of monthly statements and valuations hereinbefore pro- vided for, inclusive of the ten per centum of deductions, shall be in excess or below the just and true amount owing for the work done and materials furnished as before said, such excess shall be charged to, or such underval- uation shall be compensated for at the monthly settlement next succeeding such measurement and award. And the said William Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, do hereby jointly and severally covenant and agree to and with the said '' The Trustees of the University of Pennsyl- vania," and their successors, that upon the execution of these presents they shall and will furnish sufficient and satisfactory security by their joint and several Bond or Obligation in writing, with warrant of attorney to confess judgment thereon forthwith to the amount of twenty thousand dollars, to be given to them the said parties of the first part, for the full performance by the said parties of the second part of all agreements and covenants herein contained, concerning the erection of the said building and appurtenances, audits delivery, when completed, to the said parties of the first part; and further, that a full and legal release shall be duly executed by all persons who, under the laws of the Commonwealth of Pennsylvania, could or might file any lien on the aforesaid building and appurtenances for work done or materials furnished for constructing the same, the said bond to be held by the said parties of the first part, and the judgment entered thereon to re- main unsatisfied for the space of six months after the entire completion of the said building, and its due delivery to them, or for such further term as by the laws of said Commonwealth then in force may be necessary for a full and entire protection against any and every lien as aforesaid. And it is hereby further covenanted and agreed by and between the said several par- ties hereto, that the said " The Trustees of the University of Pennsylvania,'' and their successors, shall be represented in all matters, agreements, altera- tions, settlements, supervision, and other necessary acts whatsoever relative to or concerning the erection of the said building and its appurtenances, and the fulfilment of these articles, by a building committee duly appointed by CONTRACTS. 2/3 the said "The Trustees of the University of Pennsylvania," and all said agreements and acts of the said building committee shall be as valid and binding to all intents and purposes upon the said '' The Trustees of the University of Pennsylvania," and their successors, and upon the said Wil- liam Struthers, John Struthers, and William Struthers, Jr., copartners as aforesaid, their several executors or administrators, as if formally entered into by and with the said '' The Trustees of the University of Pennsylvania '' under their corporate seal. In testimony whereof the said " The Trustees of the University of Penn- sylvania " have caused these presents to be sealed with their corporate or common seal, and the said William Struthers, John Struthers and William Struthers, Jr., copartners as aforesaid, have hereunto severally set their hands and seals the day and year first before written. This was followed by an agreement authorizing the majority of the " Building Committee " to represent the trustees. General Form of Contract Between a Firm and Contractor. Articles of Agreement, made and concluded this day of Anno Domini One Thousand Eight hundred and by and between party of the first part, and party of the second part. Witnesseth, That for and in consideration of the payments and cove- nants hereinafter mentioned to be made and performed by the said party of the second part, the said party of the first part doth hereby covenant ^nd agree to The whole of the said work to be erected, constructed and finished, in con- formity with the instructions which shall from time to time be given by the Engineers and Architects of the party of the second part, and in full ac- cordance with the plans thereof prepared by Wilson Brothers & Co., Civil Engineers and Architects, and with the specifications, a copy of which is hereunto attached, which plans and specifications are understood as forming part of this agreement. The aforesaid work to be commenced and finished on or before the day of Anno Domini One Thousand Eight Hundred and And the said party of the second part doth hereby promise and agree to R 274 CONTRACTS. pay to the said party of the first part for the full and faithful performance of this contract the sum of dollars. Payment to be made in the following manner, to wit ; And when all the work embraced in this contract is completed agreeably to the specifications and in accordance with the directions and to the satisfac- tion of the Engineers and Architects, there shall be a- final estimate made of the quantity, character and value of said work, agreeably to the terms of this agreement, when the balance appearing due to the said party of the first part, shall be paid to upon giving a release under seal to the said party of the second part from all claims or demands whatsoever growing in any manner out of this agreement, and upon presenting clear evidence satisfactory to the Engineers and Archi- tects that all bills and claims against that in any way might remain as a lien against this work are fully paid and discharged. The said party of the first part further agrees that before any payments are made to • by said party of the second part under this con- tract will execute to said party of the second part bonds: in the sum of dollars, with satisfactory security to said party of the second part for the faithful perform- ance of this contract and indemnifying the said party of the second part from all loss, cost or damages, for or by reason of any liens, claims or de- mands for materials, or from laborers, mechanics and others, or from any damages arising from accidents to mechanics or laborers employed in the construction of said building, or for damages resulting to persons passing on streets on which the is being constructed, or for damage done to adjacent properties by the construction of said , or by de- positing material in such a manner as to damage either the City or the in- dividual ; said bonds and security to be and remain in force for months after said shall have been completed and accepted. It is further agreed and understood that should the party of the first part refuse, neglect or from any cause fail to prosecute the work with a force of men and supply of materials sufficient in the opinion of the Engineers and Architects for its completion within the time specified in this agreement, then and in that case the Engineers and Architects or such agent as they shall designate, may proceed to employ such a number of workmen, over- seers and laborers and purchase such materials as may in the opinion of said Engineers and Architects be necessary to insure the completion of the work within the time hereinbefore limited at such wages and prices as they may find it necessary or expedient to give, pay all indebtedness so incurred, and charge over the amount so paid to the party of the first part as for so CONTRACTS. 2/5 much money paid to said party of the first part on this contract : or the said Engineers and Architects may at their discretion, for the failure to prosecute the work with an adequate force, for non-compHance with their directions in regard to the manner of constructing it, or for any other omission or neglect of the recjuircments of this agreement and specifica- tions on the part of the party of the first part, declare this contract or any portion or section of it forfeited ; which declaration and forfeiture shall ex- onerate the said party of the second part from any and all obligations and liabilities arising under this contract, the same as if this agreement had never been made, and any reserved percentage or balances unpaid upon any work done by the said party of the first part may be retained forever by said party of the second part. It is mutually agreed between the parties to this agreement, that if any changes, alterations or omissions are made in the building during the progress of the work, the value of such changes, omissions or alterations shall be decided by the Engineers and Architects, who shall make an equita- ble allowance for such changes, omissions or alterations, and shall add the amount of said allowance to the contract price for the work if the cost of the work has been increased, or shall deduct the amount from the contract price if the cost of the work has been lessened, as they the said Engineers and Architects may deem just and equitable. And it is mutually agreed and distinctly understood that the decision of the Engineers and Architects shall be final and conclusive in any dispute which may arise between the parties to this agreement, relative to or touch- ing the same, and each and every of said parties do hereby waive any right of action, suit, or suits or other remedy in law or otherwise, by virtue of said covenants, so that the decision of the said Engineers and Architects shall in the nature of an award be final and conclusive on the rights and claims of said parties. In witness whereof, Form for ^' Right of Way " Grant in Fee. This Indenture, made this day of 187 between of the County of State of Pennsylvania, party of the first part, and the Company, parties of the second part, witnesseth : That for, and in consideration of one dollar, lawful money, by the parties of the second part to the said party of the first part well and truly paid before the ensealing and delivery of these presents, the receipt whereof is hereby acknowledged ; subject to the further payment of 276 CONTRACTS. dollars, to be paid when work is commenced on the lands of the party of the first part, the said party of the first part does hereby grant, bargain, sell, assign, convey, confirm, release and set over unto the said parties of the second part, their successors and assigns, a certain strip of land lying along the located line of the Company, as the same has been now, is, or may hereafter be located, not to exceed one-half rod on each side of said centre line, with the right of said party of the second part by themselves or their employees, to enter upon said lands lying in the county aforesaid, for the purpose of constructing one or more lines of pipe with necessary stations and telegraph, and of maintaining the same forever. Reserving, however, the right to the party of the first part in all cases where the land is under or susceptible of cultivation, to use the same for that pur- purpose, and also reserving all minerals therein. And the said for himself and his heirs, executors and administrators, doth covenant with the parties of the second part and their successors and assigns, to war- rant and defend the said parties of the second part and their successors and assigns, in the full and free enjoyments of all, and singular the premises and rights hereby granted, against all persons whomsoever. In witness whereof, the said parties of the first part have hereunto set their hands and seals the day and year first above written. Signed, sealed and delivered [Seal.] in presence of County of State of Pennsylvania. [Seal.] ss. This day of A. D. 187 before me, the subscriber a of said county, personally appeared the above named who, in due form of law, acknowledged the foregoing Indenture to be act and deed, and desired that the same might be recorded as such. Witness my hand and seal the day and year last above written, [L. S.] CONTRACTS. 277 Preliminary Agreement to Grant a " Right of Way." Know all men by these presents, that for and in consideration of the advantages to be derived from the location and construction of the railroad as hereinafter mentioned, and of the sum of dollars to in hand paid by The Company at or before the execution hereof, the receipt where- of is hereby acknowledged, and of the further sum of. dollars lawful money to be paid to by the said Company upon the execution and delivery of the conveyance or release hereinafter mentioned, do hereby, for heirs, executors, administrators, and assigns, grant to the said Company, their successors and assigns, the privilege of surveying, locating, constructing, and using, by themselves, their engineers, contractors, agents, and employees, a railroad upon such line or route therefor as may be adopted by said Company, through, over, and upon a certain tract or par- cel of land belonging to situate in Township, County, and State of a plan whereof, more particulai ly showing said lin« or route of said railroad, may be hereto attached And do also, for heirs, executors, administrators, and assigns, hereby covenant and agree to execute and deliver to the said The Company, their successors and assigns, a proper deed of conveyance, or re- lease for the right of way for the said railroad, through the whole length or breadth of the above mentioned tract of land, if required, said right of way to be not over feet wide, with such additional widths for slopes at deep cuttings, embankments, retaining-walls, bridges, and drains as may be re- quired for the proper construction, maintaining, and operating of said rail- road ; and further, to release the said Company, their successors and as- signs, from all claims and demands for damages which may accrue to heirs, executors, administrators, or assigns by reason of the taking and using of the said land for said railroad, or by reason of the construction, maintaining, and operating said railroad on and over said tract or parcel of land. Witness- . . .hand and seal, the day of one thousand eight hun- dred and Sealed and delivered in presence of . (Seal) (Seal) (Seal) On the day of A. D. 18- .before me, the subscriber, personally appeared the above named who in due form of law acknowledged the foregoing agreement to be act and deed, and desired that the same might be recorded as such. Witness my hand and seal the day and year aforesaid. (L. S, 2yS CONTRACTS. Deed for Right of Way. Know all Men by these Presents ^ That whereas the Company have located or are about to locate their Rail upon and through certain tract , piece or parcel of land, situate in Township, County, State of bounded by lands of and being the property of the undersigned : Now, therefore, for and in consideration of the location of the said rail over lands, and of the advantages which may accrue to therefrom, and also of the sum of dollars to in hand paid, at and before the ensealing of these presents, have granted, bargained, sold and conveyed, and by these presents do grant, bargain, sell and convey to the said Company, their successors and assigns, for the uses and purposes of their rail and the construction of works connected therewith, the right of way through and over said lands the whole distance of said rail through the same, and in width feet, and with such additional width as may be required and necessary in the construction and use of a double-track rail at deep cuttings and embankments, one-half thereof on each side of the centre line of the double track of said rail a plan of which said strip of land and premises is hereto annexed, and the full liberty to make, maintain and use the said rail over said lands, with the usual road- bed, slopes, berms, ditches, spoil-banks and borrow pits, and also the right to take and use any water from springs or streams upon said lands, and to conduct and carry water, by pipes or otherwise, over or through said lands, and to establish water stations thereon. To Have and to Hold the said strip of land and the said rights and priv- ileges to the said Company, their suc- cessors and assigns, so long as the same shall be required for the uses and purposes of said rail . And for the considerations aforesaid, do hereby for heirs, executors, administrators, and assigns, release the said Company, their successors or assigns, from any further payments for or on account of the appropriation and occupancy of the said strip of land, as well as for any and all damages which have accrued, ©r which may hereafter ac- ,^ CONTRACTS. 2/9 cruc, by reason of the location, construction, and opciating of the said rail over and upon the said lands, /;/ Witness Whereof, have hereunto set the day of eight hundred and Sealed and delivered in the presence of us : Received, The date of the within indenture, of the Company, the sum of the full consideration money within mentioned. hand . D. one and seal thousand [L. S.] [L. S.] [L. S.] [L. S.] being Witnesses present : 1 .s s. On the day of Anno Domini i8 before me, one of the in and for the said personally appeared the within-named and in due form of law acknowledged the within instrument of writing to be act and deed, and desired that the same might be recorded as such. And the said being of full age, and separate and apart from said husband by me thereon privately examined, and the full contents of the within instru- ment of writing being by me first made known unto did thereupon declare and say, that did voluntarily, and of own free will and accord, sign, seal, and as act and deed, deliver the within in- strument of writing, without any coerdon or compulsion of said husband. Witness my hand and seal the day and year aforesaid, 28o CONTRACTS. County of ^ > ss. State of Pennsylvania. ) Recorded in the office for recording deeds, &c., in and for the County aforesaid, in Deed-book No. page &c. Witness my hand and seal of office, this day of A. D. i8 . Plan of the land referred to in the annexed deed Scale feet to one inch. (N. B. — It is of vital importance that the plot of the property with the direction of the line of the proposed improvement be entered in this place.) Contract For Graduation and Masonry of Roads and Railroads as used ON THE PENNSYLVAIA, AND PHILADELPHIA & READING RAILROADS. See pages 150, 232. Articles of Agreement, made and concluded this day of A. D. one thousand eight hundred and seventy between of the first part, and of the second part, witnesseth, that for and in consideration of the payments and covenants hereinafter mentioned, to be made and performed by the said party of the second part, the said party of the first part doth hereby cove- nant and agree to construct and finish, in the most substantial and work- manlike manner, to the satisfaction and acceptance of the Engineer of the all the graduation, masonry, and such other work as may be required on of said road ; the said work to be finished as described in the following specifica- tions, and agreeably to the directions, from time to time, of the said En- gineer or his assistants, on or before the day of in the year one thousand eight hundred and (Note. — The specifications as printed on page 150 are here introduced.) And the said party of the second part doth promise and agree to pay to the said party of the first part, for completing this contract, as follows, viz.: For excavation of earth, cents per cubic yard. For loose rock, cents per cubic yard. For solid rock, cents per cubic yard. For embankment, cents per cubic yard. For masonry of rectangular culverts, dollar cents per cubic yard. For semi-circular or other culverts with curved arches, dollar cents per cubic yard. For bridge masonry, first quality, dollar cents per cubic yard. For bridge masonry, second quality, dollar cents per cubic yard. For paving in foundations of culverts, dollar cents per cubic yard. For vertical wall, dollar cents per cubic yard. For slope wall, dollar CONTRACTS. 2 (Si cents per cubic yard. For rip rap For timber laid in foundation of bridges and culverts, per cubic foot, cents. On or about the first day of each month, during the progress of this work, an estimate shall be made of the relative value of the work done, to be judged of by the Engineer; and upon his certificate of the amount be- ing presented to the said party of the second part, or such disbursing agent as they may appoint, four-fifths of the amount of said estimate shall be paid to the party of the first part, between the loth and 20th of each month, at such time and place as the said disbursing agent may designate : Provided, The amount due on said estimate to the party of the first part shall be more than three hundred dollars ; and when all the work embraced in this con- tract is completed agreeably to the specifications, and in accordance with the directions and to the satisfaction and acceptance of the Engineer, there shall be a final estimate made of the quality, character, and value of said work, agreeably to the terms of this agreement, when the balance appearing due to the said party of the first part shall be paid to upon giving a release, under seal, to the said party of the second part, from all claims or demands whatsoever growing in any manner out of this agreement. It is also understood, that the party of the first part will make all Pay- ments, for the work herein contracted for, in such funds as may receive from the party of the second part. It is further covenanted and agreed between the said parties, that the said party of the first part shall not let or transfer this contract, nor any part thereof, to any other person, (excepting for the delivery of materials,) with- out the consent of the party of the second part, but will give personal at- tention and superintendence to the work. Nor shall the said party of the first part employ any person or persons who commit depredations on the neighborhood, or insult travelers or other persons ; and all such disorderly persons shall be discharged from employment, whenever the said party of the first part shall be directed so to do by the Engineer in charge of the work. The said party of the first part further bind not to keep, or suffer to be kept or used, any ardent spirits in any house or tenement built or occupied by or by the workmen, or boarding-house keepers under on or near said road; and to discharge from employment any workman, laborer, or boarding-house keeper who is guilty of a breach of this regulation, when required by the Engineer. The Chief Engineer shall have the right to regulate, from time to time, the wages of labor upon the line of the work, so as to maintain a proper distribution of the force, and prevent the injurious effects of competition among the contractors for hands. * It is further agreed and understood that the work embraced in this con- tract shall be commenced within days from this * This claim is not in use on the Pennsylvania Railroad. 282 CONTRACTS. date, and prosecuted with such force as the Engineer shall deem adequate to its completion within the time specified; and if, at any time, the said party of the first part shall refuse or neglect to prosecute the work with a force sufficient, in the opinion of the said Engineer, for its completion within the time specified in this agreement, then, and in that case, the Engineer in charge, or such other agent as the Engineer may designate, may proceed to employ such a number of workmen, laborers, and overseers as may, in the opinion of the said Engineer, be necessary to insure the completion of the work within the time hereinbefore limited, at such wages as he may find it necessary or expedient to give ; pay all persons so employed, and charge over the amount so paid to the party of the first part, as for so much money paid to said party of the first part on this contract ; or the said Engineer may, at his discretion, for the failure to prosecute the work with an adequate force, for non-compliance with his directions in regard to the manner of con- structing it, or for any other omission or neglect of the requirements of this agreement and specifications on the part of the party of the first part, — de- clare this contract, or any portion or sections embraced in it, forfeited ; which declaration and forfeiture shall exonerate the said party of the second part from any and all obligations and liabilities arising under this contract, the same as if this agreement had never been made ; and the reserved percentage of one upon any work done by the party of the first part may be re- tained forever by the said party of the second part; and it is mutually agreed and distinctly understood, that the decision of the Chief Engineer of the said Railroad shall be final and conclusive in any dispute which may arise between the parties to this agreement, relative to or touching the same ; and each and every of said parties do hereby waive any right of action, suit or suits, or other remedy in law or otherwise, by virtue of said covenants, so that the decision of said Engineer shall, in the nature of an award, be final and conclusive on the rights and claims of said parties. In witness whereof, the said parties ha hereunto set hand and seal the day and year first above written. Witness : [Seal]. [Seal]. [Seal]. [Seal]. QUESTIONS. 283 QUESTIONS ON THE SIXTH CHAPTER. Page 243. What is a contract ? What are its component parts ? How many copies should be signed? Page 244. How are they classified ? Define the different grades. Page 245. What are the four essential elements ? Who may be parties to a contract and who not ? Of what value is a compulsory signature ? Page 246. Is a party bound by the signature of his agent ? How are corporations regarded ? What is mutual consent ? How does fraud affect the validity of a contract ? What is assent ? What is an offer on time ? How long is an offer by letter good ? Of what use is the consideration ? Define it. What is the distinction between 2i good and a valuable consider- ation ? Page 247. How is the existence of a seal to be interpreted ? Is the val- idity affected by the adequacy of the consideration ? What is the effect if it be illegal or impossible? What if a valuable consideration becomes worthless before part performance? Upon what subjects may contracts be made? How is the intention of the parties to be interpreted ? What is the difference between an oral and written agreement ? Upon what points may evidence be received in written contracts ? Page 248. How are words to be interpreted ? If wording be obscure what results ? What influence has the customary or local meaning of a word or phrase ? What other elements may be introduced in an agree- ment to modify its terms and conditions ? How are the duties of the par- ties to be stated ? What are those of the contractor ? of the employer ? How may payments be made ? Upon whom does the risk rest ? May con- tractor claim a payment before acceptance of work ? What are the stipula- tions when payments are made by instalment ? May the certificates of an expert be required ? What is the ruling in case of penalties for delay ? Page 250. How does a breach of contract by the employer affect the ob- ligations of the contractor ? What effect has extra work ? What time may be allowed when none is specified? When does a given time expire ? What is meant by a month ? What is the limitation for simple cases ? for sealed instruments ? When is the guaranty required ? What is it? Page 251. Give the substance of the law relating to Government con- tracts ; relating to appropriations for public works. Analyze the form given for use by the U. S. Engineers, indicating the general and several duties of the parties. Page 253. Fill up the bond. 284 QUESTIONS. Pages 254, 256, 257. What are the conditions imposed in the form of Light-House contract? What bonds and certificates are required ? Page 259. Analyze carefully the form of contract for a sewer. Pages 262, 263. What are the elements of the contracts for a Reservoir and the general form for Iron Pipes for Aqueduct on page 273 ? Page 275. What are the stipulations for a Grant of Right of Way in fee ? Page 277. State the conditions of the preliminary agreement for Right of Way. Page 278. What is the form of deed for Right of Way for a R. R., &c. Page 280. Analyze the form of Agreement for Graduation and Masonry. (Students should now be required to prepare all the papers for a complete contract, including the proposals and drawings, and endorse them for filing away.) APPENDIX. R. A. Malone vs. City of Philadelphia, in the case of the Hart Creek Sewer, giving some important rulings by Judge Fell, concerning the authority of Engineers in ap- proving estimates when made sole arbitrers by the terms of the contract. No. 2. — Room C. — Judge Fell. The case of R. A. Malone vs. The City. The Assistant City Solicitor opened the case for the defence, and said that this was a case of great importance, not only in the amount of money claimed, but other questions involved. When this contract was en- tered into, the estimated cost of the sewer was about ^230,000, but if what Mr. Malone claimed was allowed him, the cost would be increased to nearly double that amount. They would show that the plan under which this contract was framed had been devi- ated from, the work done in an entirely different manner from that required by the contract, and plaintiff could not, therefore, recover anything. If they failed in that they would show that there was a claim made for work done largely in excess of that which was really done, these excessive demands amounting to about ^71,000. They would further show, by persons employed in the work, that, if the amount of work claimed for was dt)ne, it was done in such a manner that the plaintiff could not recover for it. Chief Engineer Smedley was recalled by Mr. Willson and testified. W. Milnor Roberts was the next witness called. Mr. Willson in answer to a question by Mr. Sellers, said he proposed to prove by the witness that he, W. Milnor Roberts, spent about a month watching the prosecution of that work, from about the 4th of January, 1877 ; that as a result of the examination then made, to prove by the witness that the amount of rubble masonry as estimated for on the 6th — the estimate in suit — was in excess of the amount actually done ; that the said work was not done according to the plan which was in existence when the contract was made, or according to the plan subsequently adopted ; that the masonry in question was not laid according to the requirements of the specification ; that the amount of earth estimated to have been removed was in excess of the amount actually excavated ; that the amount of rock estimated to have been removed was in excess of the amount actually removed, and that the amount of the timber estimated to have been put in position by the contractor was in excess of the amount actually placed in position. Mr. Sellers objected to the offer as irrelevant to the issues, contending that in the ac- tion brought, one in debt npon a monthly estimate, it was clearly inadmissible. Mr. Malone, he said, entered into a contract, which provided that upon the happening of certain contingencies he was to receive from the city certain estimates as the work pro- gressed. He received an estimate showing the sum of ^99,500 due him. Upon that estimate he brings suit, and the city pleas are nil debit, and payment with leave. Under these pleas the city can only set up one of two things : First, that the aggregate amount of the approximation estimate of December 8th, 1876, was so much in excess of the 286 APPENDIX. work actually done, that if the excess was charged to this particular estimate it would pay it ; and secondly, that the excess of work which it is alleged Mr. Malone was al- lowed for, is an excess which, according to the terms of the contracts, he cannot thus secure. Now all that the city claims is that he has been allowed for work representing ^71,000 more than he was rightfully entitled to, and yet the estimate of the Engineer shows that, of the money actually due him for work done prior to this last estimate, no less than ^79,000, or more than ^8000 over all that the city claimed, has been retained until the final estimate is made. And since that time, too, it is admitted by the city that Mr. Malone did ^50,000 more work. If, therefore, on this aporoximate estimate there are trifling discrepancies, on the final estimate, which provides that " all legal and equita- ble deductions shall be made," there is ample security for the protection of the interests of the city. Hence the contractor is clearly entitled to recover upon the presentation of the estimate, together with his contract. But, moreover, the evidence is irrelevant for another reason. The contract provides that in case any dispute or difference shall arise as to the efficiency of labor or quality of material employed , it shall be settled by the Chief Engineer and Surveyor, whose decision shall be final and conclusive on both parties . If Mr. Smedley, therefore, had chosen to say that the best brickwork in any aque- duct in this city, or in this very work, was defective, as he had a right so to do, we would have had no remedy and could not have recovered. We agreed to do the work to the satisfaction of the City Surveyor and Engineer, but not to the approval of any roving Engineers who may happen to come along. The City Engineer approved ol it, and, upon further examination, still approves of it. Therefore, the city of Philadel- phia, having taken Mr. Malone by the throat and required him to submit to the ap- proval and decision of her Engineer as to material and workmanship, and that Engi- neer having decided in his favor, it is entirely immaterial what any other man or En- gineer may think or say of the work. The contract says the Chief Engineer and Sur- veyor shall have the sole power of decision, and there is no reason why this contract stipulation should be broken down, especially when no harm can result to the city. Mr. Malone put himself at the mercy of the city's Engineer, who had the widest power over his work. In consideration, theretore, the city agreed that he should be paid upon estimates duly made out, and upon which 80 per cent, of the sum due was to be retained by the city until final estimate ; when, according to the terms of the contract^ •• all legal and equitable deductions are to be made." Mr. Malone took the contract^ bound himself to submit to the decision of the Chief Engineer, took the risk of the ap- proval of that gentleman, a competent and able Engineer, and, having his approval, he contends that the city cannot, having shut his mouth, open hers. There is no allega- tion that we corrupted the city's officer, and such a thing has not even been suggested. Therefore, the evidence sought to be introduced is entirely irrelevant, and its introduc- tion would be virtually tearing the contract between the parties to the wind. Mr. Willson replied, contending that to exclude the city from introducing the offered testimony, there must be most positive words of exclusion in the contract itself. This was what the Supreme Court in previous cases had already invariably required, and there was no such language here. The cases decided above were mostly all cases in which the parties waived resort to the Courts and bound themselves to abide by the de- cision of arbitrators. Here Mr. Malone is only entitled to his money when he has done his work. We propose to show that he has not done it, that what he did do was im- properly done, and that it was slighted in the absence of the city's officers. This was not, therefore, the work the doing of which was a condition precedent to the gettfng of the money. Mr. Smedley was not a fraudulent party to this agreement, but he himself must have been misinformed. Furthermore, the Engineer only had authority under APPENDIX. 287 the contract to pass upon the quality of the work and not upon the quantity. Clause 103 of the contract r<;served this latter right to the city, and to her alone. Therefore the offer to show that the measurements of the assistant were incorrect, and to prove that, for a long distance, the sewer was constructed in a way entirely different from the specifications, is perfectly admissible, inasmuch as it tends to show that a less quantity of work was done, and relates solely to quantity and not to quality. The question is not the quality of the work or materials, but purely as to the quantity — a matter in which the City reserved to itself the right of determination — and gave no power to the Chief Engineer to pass upon. The evidence is clearly admissible, for to hold otherwise would be to put the city at the mercy of incompetent officials. Judge Fell — If the contractor came into court without the approval of the Engineer of the city could he recover ? I mean if he came here upon his contract suing for work done and material furnished. Mr. Willson — No, sir ; he could not recover at an intermediate stage of the work. Judge Fell — For the reason that it is a part of the contract that he shall have the ap- proval of the Engineer? Mr. Willson — Yes, sir. Judge Fell — If this is binding upon him, why not binding upon the city? Taking the first clause of the contract, which says that all the work shall be done to the satisfaction and approval of the Chief Engineer and Surveyor, and construing it with the looth clause of the same instrument, what is the result? Now I put this case to you. If Mr. Malone came into court without an estimate would he be entitled to recover? Suppose he came in and claimed more than the amount of the estimate, would he be entitled to recover it ? Mr. Willson — Yes, sir, he could, because the contract gives the city's officers no de- cision on the question of the quantity of work done. Judge Fell — Is not the presenting of the estimate, with the approval of the Engineer, a sine qua non to any recovery ? Mr. Collis — It is not conclusive ; the city alone can say that it is conclusive upon the question of quantity. Mr. Sellers then went into an explanation of the word " quantity," used in thu con- tract. At the time the work was contracted for, it was thought possible that an exten- sion of the sewer two squares west of the westernmost extremity might be necessary, and the determination of this question was the question which the city reserved to itself under clause 103. Mr. Malone 's contract was for no given amount of work ; it was to build a sewer along the line of Somerset street, from Indiana avenue to Aramingo Creek, the various grades of work entering into its construction to be done at rates given in a schedule annexed to the contract. There was no quantity mentioned — no quantity entered into the contract at all — and all that the city meant by reserving the question of the approval of any change in quantity, was to determine itself whether or not the sewer should be extended. Mr. Malone was bound by the Engineer's estimate, which the evidence showed was substantially correct, the only deduction to be made amounting but to ^6000, against which the city had retained the sum of 378,000. As the contractor is to be bound by the Engineer's estimate, it was but fair for him to ask that he should have the same protection afforded him as the contract afforded the city. Mr. Willson cited the case of Caldwell vs. Rennels, and argued that, under the de- cision, the evidence offered was admissible; for, according to the ruling there, a de- fendant's mouth could only be closed by a distinct waiver of his right of appeal from the decision of the arbitrator to the Courts. Even admitting that the city was remiss in not having sufficient engineers to properly look after the work, Mr. Willson contended that the evidence he offered was still relevant and admissible. Judge Fell then said : By the first section of this agreement the plaintiff " covenants 288 APPENDIX. and agrees that all of said materials shall be furnished and delivered, and all the said work and labor shall be done and performed to the entire satisfaction of the Chief En- gineer and Surveyor of the City of Philadelphia/' who has the power to reject any materials and order their removal, and order them to be replaced by others, and to or- der taken down and done anew any of the work. The Chief Engineer has further power, if in his opinion the work is not prosecuted efficiently and diligently, or is being performed imperfectly or negligently, or in the event of the refusal of the plaintiff to obey any of his instructions, to take entire charge and control of the work and to finish it himself, at the cost and expense of the contractor. Clause loo of the specifications, which are a part of the agreement, provides that «« If any dispute or difference shaP arise as to the efficiency of labor or quality of materials employed, they shall be settled by the Chief Engineer and Surveyor, whose decision shall be final and conclusive on both parties." The payments, by the terms of the contract, are " to be made in monthly instalments of 80 per cent, on the amount of work executed during ihe preceding month, upon cer- tificates furnished by the Chief Engineer and Surveyor, until the final payment, which is especially provided for." All through these specifications every question which might arise in the execution of such a contract is anticipated, and they are all left unqualifiedly to the determination of the Chief Engineer and Surveyor. It is apparent throughout this agreement that the city has reserved to herself through her own officer — not as an individual by her officer — for though she may change her Engineer a dozen times while this contract is being carried out, the Engineer for the time being has the entire control of it. She has made her own officer sole and absolute judge of all matters arising under this contract. It seems to me that in this way the city has reserved to herself, through her agent, to be the sole and exclusive judge of the amount of work done, the character of the work and every other question arising out of this contract. That is a part of the consideration — as far as she is concerned — and to it Mr. Malone submitted when he signed this agreement and bound himself hand and foot. The arbitrary power which the Chief Engineer and Surveyor might unjustly and op- pressively use, offered to him no advantage, unless it was that the decision of the Chief Engineer and Surveyor should be final. The law is well settled in Pennsylvania, that if parties, in making a contract under which disputes are contemplated as possible, agree under seal to submit every such dis- pute to the award of some third person, so that his decision shall be final and conclu- sive, it is a bar to any action in the contest. The plaintiff cannot sue under such a contract without first obtaining the decision of the arbiter. Such a decision is a prerequisite to any action. If the plaintiff in this case came into Court without the decision or award of the Chief Engineer and Surveyor, he could maintain no action. He comes here with it, and it is admitted that it is faithfully and properly obtained, and that it is the honest judgm.ent of that officer. To admit testimony of other parties to contradict the state- ment of the Chief Engineer and Surveyor, will be to substitute the opinion of another for that of the Chief Engineer and Surveyor, and to submit the question existing out of this contract to the judgment of a new party. Both parties contracted to leave it to the decision of the Chief Engineer and Surveyor — not to that of any third party, and by their contracts, I think they are bound. I sustain the objection. S. W. Thackara was the next witness called, Mr. Willson offered to show by the witness that he is a sworn measurer, was present at the work during its construction, and the rubble masonry was not rubble masonry at all, but stones loosely thrown into the excavation ; that the outline and figuration of APPENDIX. 289 the mn>onry was different from tliat required by the contract, and that the area of the work constructed was consideral)ly less than tlie area recjuirod ; tliat at least two-thirds <>f the stones used in that part of the sewer the witness examined were less than the re- quired size. Objected to by Mr. Sellers as irrelevant, on the ground that the evidence was as to the character of the work, Objection sustained. Robert B. Merkens was next called. Mr. Willson offered to show by this witness that he was employed as a bricklayer on the sewer from July to September, 1876; that in places the stone cradle was not prepared in the form of a circle, and that bricks were cut to make the brick work even ; that in some places the brick work was only four inches thick ; that in portions oi the work done by him the bricks were put in dry, without mortar ; that the stone work was defective ; that a watch was kept for the resident Engineer Hoover, and that during his absence poor work was done. This was objected to by Mr. Sellers, and ruled out by the Court under its previous decision. Mr. Collis offered to show that at the time the estimate was made the appropriation for the sewer had run out. He did this with a view to save the city from the payment of interest, Mr. Sellers admitted the fact, but argued that under the decision in 30th Smith, of Talham vs. The City, it had no effect in stopping the interest. The evidence being all in, the case was closed. Judge Fell charged the jury as fol- lows . "Gentlemen of the jury, under the testimony in this case your verdict should be for the plaintiff to the amount of his claim, ,^99,500 with interest, amounting altogether to ^101.987.'' The jury found a verdict in accordance with the instructions of the Judge, and the Court adjourned. GLOSSARY OF TECHNICAL TERMS USED THROUGHOUT THIS WORK. Abutment — That portion of the masonry of a bridge or dam upon which the ends rest^ and which connect the superstructure with the adjacent banks. Air Registers — Ventilators of iron or other material, covering apertures in walls, win- dows, or doors, to permit a free circulation of air. Angle Iron — A strip of flat bar iron bent longitudinally at right angles. Arch Caps — Voussoirs. Architrave — The lowest, principal division of an entablature, resting immediately over the abacus. Arris — The edge in which two surfaces meet ; the intersection of two planes. Ashlar — In masonry a stone squared and hewn, used for facing work when laid in regular beds or joints. Tooled ashlars are blocks marked with parallel flutings or grooves. Axed — in masonry, dressed with a stone hammer to a smooth surface. B Backed — In masonry, built in on the rear face. Backed — In carpentry, is applied to joists having their upper surfaces hewed or planed off near the ends, decreasing to the middle, causing them to be slightly round on top, to allow for settling. Backed — In earthwork, filled, returned to place. Baluster — A small pillar supporting a rail. Balustrade — A railing composed of balusters. Base — Lower portion of a post or column, but is generally used to designate the lowest portion of arfy structure. Basil — The angle at the cutting edge of a tool or instrument. Bats — Broken bricks. Batter or batir — The slope or inclination given to the front or face of a wall. It is ex- pressed by dividing the height by the horizontal distance from the vertical to the face ; thus -5- represents a slope of 5 feet vertical for every i horizontal. Batten — A strip of board less than four inches in width, generally used for covering cracks or joints. Battlement — A notched or indented parapet, of which the higher parts are called merlons , and the openings or lower portions, embrastnes or loops. Bay — in plastering, the distance between the screeds. Bay window, (^auriel or onel') — A window forming a bay or recess in a room, often, corruptly' called a <5 => fc> Cross Bridging — Short battens placed in the form of an X between joists to stiffen thcni and prevent twisting. Cross Section — The section made by cutting across or tlirough an object. Cross Section Paper — The paper used for plotting the cross or transverse sections of earthwork upon. Crown — The highest point in the curve of an arch. Culled — assorted, picked out, selected. Cut Stone Masonry — That built of stones having plane joints and smooth or dressed faces. D " Dashed and Broomed " — Having mortar thrown against the surface to be covered, and smoothed down with a broom. Davits — The iron brackets or cranes hinged upon a vessel or balcony for the purpose of raising boats or weights. Deck Bridge — One in which the track bearers rest upon the upper chord and the trains pass over the top. Deafened — So arranged as to interrupt the passage of sound. Dentils — Ornaments resembling teeth, used in the mouldings of Ionic, Corinthian and Composite cornices. Derrick — A kind of crane having a hinged jib or arm which can be raised or lowered at pleasure. Diagonals - Boards or laths nailed on the studding diagonally. Diamond Checkers — Diamondshaped cavities or projections in an iron floor to roughen it. Dimension Stone — Is that which is quarried of such sizes and shapes as to have, when dressed, certain given dimensions. Door Jamb — The vertical portion of the frame ; the sides. Dormers — Windows pierced through inclined roofs and having their frames vertical. Double Hung — Windows having two sashes separated by parting strips. Double Trimmeis — Two parallel joist arranged to receive aud support others called tail joist at right an. les to them. Dowel — A straight pin of wood or metal inserted part way into each of two faces which it unites. Drafts — In stone cutting, are lines cut upon the faces to be "used as guides in dressing or laying. Drafted — Having drafts cut upon the surface. Drawn — Removed, pulled out. Drift Bolts — A rod used to drive out a bolt. Dump — An embankment where mateiial is deposited from carts, cars or barrows. Dump Scow — A bateau having a movable bottom. Dumping Ground — Any site where waste material or refuse may be deposited. E Eaves — That portion of a roof which projects beyond the walls. Extrados — The exterior curve of an arch, measured on top of the voussoirs. F Facade — The exterior face or front of a building. Fall — The rope used with pulleys in hoisting. Fascia — A broad fillet, band or face used in classical architecture, generally in combina- tion with mouldings. 294 GLOSSARY. Fence Stone.— Long rectangular stones suitable for fence posts. Fillet — A small flat band used principally between mouldings to separata them. Finial — The carved or ornamental terminal inserted in gables, canopies, &c., in Gothic architecture. Flagstones or Flags — Large flat slabs used for paving. Flashings — Broad strips of sheet lead, copper or tm having one edge inserted in -(he joints of brickwork or masonry, an inch or more above a roof. The opposite edge is flattened down upon the roof and covered by slate shingles, &c,, to prevent leaks. Flat Work — In plastering, is that having no projections, beads or mouldings. Flatted Timber — That which is hewn or sawed on two sides only. Float — A plasterer's trowel, used ixifioating plaster on a wall. It is sometimes so long as to require two men to use it. Flush — Even with ; being upon the same level. Flush Bolt — A screw bolt whose head is sunk to the level of the surrounding surface ; a sliding bolt let into the face or edge of a door. Flume — An artificial channel for conducting water around or through a piece of work in progress. Footings — The bottom of a trench for foundations. Frieze — The middle division of an entablature in architecture, lying between the ar- chitraye and the cornice. Function — A quantity or expression depending for its value upon that of some variable which it contains. Furring — Pieces inserted to bring others up to a required level as in joists ; a kind of chock. Gable — That portion of the end wall of a building above the eaves of a sloping roof. Girder — A beam which sustains the joists of a floor when the distance between walls renders additional support necessary. Girth or Girt — The periphery or bounding line limiting a right section of any body. Grillage — A platform of heavy timber notched together to support a structure in com- pressible soils. Grouting — A thin mortar or cement poured into the joints of masonry and brick work to fill the interstices. Grubbing — Removing roots and stumps from the surface ; clearing. H Halved — In carpentry, cut half away so that two timbers may pass each other and yet have their faces in the same planes. Hammer-Dressed — Dressed to a plane surface by repeated blows of the patent dressing hammer. Hanger — An iron bracket or projection depending from a ceiling for supporting shafting. Hard Pan — A stiff clay which it is sometimes necessary to remove by blasting. Hatchings — In topographical drawings, are shade lines drawn in the direction of falling water to indicate the direction of the slope. Its angle or intensity is represented by the number and thickness of such lines in a given length of contour. Haunches — Those portions of an arch lying between the crown and the pier or abutment. Headers — Those bricks or stones having their ends in the face of a wall and their lengths perpendicular thereto. Heading — In tunneling, a gallery or drift excavated in advance of the bottom to facili- tate the work. GLOSSARY. 295 Head Light — The light carried in front of a locomotive to illumine the way and act as a signal. Head Shaft — The main shaft connecting directly with the engine. Hearting — The interior filling of a wall. Hip Roof — One that slopes four ways, forming ridges or hips. Hollow Quoins — Cylindrical recesses or corners in canal locks in which are placed the posts of the gates. Honey Combed — Vesicular, spongy, full of holes. Hood — A cap or covering of stone, metal or wood. Horses — The inclined notched ribs which support the steps in a staircase. Impost — The horizontal block of masonry at the point of junction between the arch and its piers. Isometrical — Of equal measure ; in drawing it is that method of representing objects on the flat by which their three dimensions are laid ofl» upon three axes making with each other angles of 120O and the scale Is the natural cosine of the angle made by the edges of a cube with a plane perpendicular to its diagonal. Invert— An arch built on the ground, concave upwards, to support piers or walls and distribute the superincumbent pressure. Jambs — The side of a door, window, chimney, &c. Jettee or Jetty — A pier, mound or mole projecting into ihe water to protect a harbor or rrver bank. Jogs — In masonry indents or offsets either in the stones themselves or in the manner of laying them. Joist — Timber used in supporting floors and ceilings. K Knees — Crooked timbers used in ship building for uniting the ribs to the deck timbers; any angular pieces of wood or metal similarly applied. Keystone — The top stone or voiissoir at the crown of an arch. Laterals — The braces in the side of a truss. Lathing — The thin strips nailed to the studding to support the plaster. Lead — The length of haul from the pit to the dump. Lining — The arch of a tunnel or culvert. Lintel — A horizontal beam over an opening in a wall ; when the span is great and the beam supports heavy masonry, it is called a breastsummer or hressummer. Light — A pane of window glass. Lock — A chamber oi masonry closed at the ends by gates to pass boats from one level to another in canals. Lock-pit — The excavation for the masonry of a lock chamber. Lumber — Sawed timber, either boards, plank or squared pieces. Lugs — Small projections upon the surface of a casting by which it may be lifted or fas- tened in place. 296 GLOSSARY. M Manhole — An opening into a sewer, drain or culvert large enough to adnait a man. Manilla — A fibre oDtained Irom the Musa texiilus in the Philippine Islands, used for making ropes and paper. Mantel — A covering. Maul — A large mallet of hard wood bound with iron rings. Mean Lov/ Water — The mean height of low tides, and the datum surface to which geodesic levels are referred. Meeting-Rail — The central vertical rail of shutters. Mineral Furniture — Knobs, escutcheons, &c., made of clay, porcelain or other mineral substances. Mitre — The line formed by the intersection of mouldings, beams or parts of a frame meeting at an angle. Mitre Sill — The sill against which lock gates rest when closed. Mitre Posts — Those meeting over the mitre when the gate is closed. Modillions — Projecting brackets under the corona of the Corinthian and composite or- ders. Mortise — A. hole or recess cut in the face o f a timber to receive the tenon projecting from the end of another. Moulding — A general term given to all linear ornaments whether projections or cavi- ties, as the fillet, bead, ogee, &c. Muck — Soft mud containing much vegetable matter. Muck-Bar — Bar iron which has passed once through the rolls. It is usually cut inta lengths, piled and re-rolled. Mullions — The vertical strips separating window panes. Muntins — The horizontal strips separating vv'indow panes, N Nave — The part of a building in which the audience assembles. Neat Lines^-Those by which the work is laid out. Neat Work — Work wrought to the neat lines. Newel — The central column around which the steps of a circular stairway wind ; the principal post at the angles and foot of a staircase. Normal — Perpendicular to any surface or line Nosing — The slight projection upon the front edge of a step or window sill. O Ogee — A moulding of an S shape. One- Man-Stone — A stone of such size as to be readily lifted by one man. Out of Square — Askew, oblique. Out of Wind — Perfectly straight or flat. Outlets — Openings through which gas pipes enter rooms. P Parget — The plastering applied to the interior surface of chimneys. Pediments — That portion of the end wall of a building which corresponds to the gable r but it is much less acute at the top. The term is often applied to the triangular decorations over doors and windows. Parting Strips — The thin vertical strips in a window frame to separate the sash. Pinnacle — A shaft surmounted by a small spire and finial. Pilaster — A square column or pillar generally attached to a wall from which it projects a third, fourth, fifth or sixth of its breadth. It is sometimes disengaged. GLOSSARY. 297 Pin Connections — The iron pins used in uniting the several members of a bridge or roof truss at the posts. Pinners — Small stones driven into joints to wedge others. Pinned — Held in place by wooden pins or tree nails. Pit — A hole or excavation from which material has been removed. Pitch — The slope of a roof, inclination, distance between teeth of a cog wheel or the threads of a screw. " Pitched " — Chiselled to a line ; also rubble work in which the blocks -xxo. pitched into place with a certain degree of regularity, so as to bind one another in place. As in the upper courses of breakwaters, jettees, &c. Plant* — The general arrangement of the machinery in any manufactory or process ; the tools and apparatus required in any operation. Plancier — The soffit or under side of the corona of a cornice in classical architecture. Plinth — A square member forming the lower division of the base of a column ; also the plain projecting face at tne bottom of a wall. Plumb — Vertical, upright Pointed — Dressed with a point and mallet to true planes ; also having joints filled with cement or mortar and lined with a trowel or pointing tool. Primed — Having the first coat of paint or " priming " laid on. Porcelain Furniture — Knobs, &c., of porcelain. Purlins orPurlines — The horizontal strips placed upon rafters to support the roof cov- ering. Q Queen-Posts — The two vertical members of a roof truss composed of two struts and a straining beam, ties and rafters. Quoin — The hollow into which the quoin post of a canal lock gate fits ; also the dressed stones on the vertical edges of buildings. R Racked Back — Built in steps or offsets out of plumb. Radiators — Coils or drums used in heating by steam or hut air. Rabbet or Rebate — A half groove along the edge of a board or moulding forming a longitudinal recess. Raked Out — Cleaned out with a scraper. Range Work — Built in horizontal layers of uniform thickness. Relieving Arches — Those built against the back of a wall and having their axes per- pendicular thereto to relieve the wall from the pressure of a backing of earth. Rendering — Plastering on a wall without laths. Registers — The open work castings inserted in walls for air passages. Return — The termination of the drip stone or hood-moulding of a window or door. Return Walls — Wing walls used to support the side slopes of an embankment and keep open a passage way. Reveal, Revel — The sides of an opening for a doorway, window, cS;c., between the framework and the outer surface of the wall. Ridge — The line in which the slopes of a roof meet. Ring — To make a sonorous vibration. Rip-Rap — A covering or apron of rubble stones thrown over a bank to protect it from washing, Riser — The vertical part of the face of a step. Rock Range Pitch Face — Masonry with roughly scabbled faces, but with " beds " and " builds" cut square and true. 298 GLOSSARY. Rock Face — Not dressed or hammered to a plane on the face. Rostrum — An elevated platform in a hall, with a sedilia. Rough Cast — A mode of finishing outside work by dashing over the second coat of plaster while quite wet, fine washed gravel in lime. Rubble Work — Masonry in which stones are used in the rough without being dressed to size. Running Foot — A foot measured in the direction of the length of the material, without reference to the other dimensions. Saddle Heads — Hollow castings resting on the heads of columns to sustain another series above and allow beams to pass through. Salmon Bricks— Pale yellow, underburnt bricks. Sand Finish, Floated — Plastering in which the finishing coat is composed chiefly of sand put on with the float and straight edge. Sash — The frame of wood or iron supporting the glass in windows. Sash Fasteners — The spring catches attached to the meeting rails to lock them. Sash Lifts — The buttons or hooks attached to the lower rail of window sash. Scabbled — Chipped off roughly with a stone hammer. Scarf — A longitudinal joint made in timber by notching and overlapping tbeir ends, which are secured by bolts, straps and fish-plates. Scotia — A hollow moulding resembling a pulley. Screeds — Strips of plaster both horizontal and vertical, forming guides for the straight edge. Scroll — An ornamental form arranged like a band in undulations or convolutions. Seasoned — Dried either by exposure to weather or by artificial means. Second Shaft — The cqunter shaft connecting with the main or head shaft. Secret Nailed — In flooring nailed through the tongue so that the heads of the nails are invisible. Segmental Heads — Of doors and windows, arched so as to form an arc of circle. Separators — Thimbles or small pieces of iron inserted between girders to keep them apart. Set (n) — A permanent bend or deflection produced by straining a beam beyond its limits of elasticity. . Set (v) — Hardened — a cement, according to Vicat, is said to have set when it will bear a wire 1-24 in. in diameter weighted with one pound. Shaft — A vertical pit or well ; the main part of a column. Shade — That part of an opaque object from which light is obscured by the object itself. Shadow — That part of an object from which light is obscured by the interposition ot an opaque body. Shakes — Longitudinal cracks in timber which has grown in localities exposed to the wind. Shank — The body of a bolt excluding the head ; the long straight part of many things. Skew-Back — The angular block supporting the end of an arched or inclined member. Square Droved — In masonry, cut by a broad chisel into small lines square with the edge. Splay — A surface making with another an angle differing from a right angle. Stepped — Cut out in offsets resembling steps, as in loundatiou on sloping ground, &c. Stiles (Styles) — In joinery,^ the upright pieces of a frame as of a door, shutter, screen, or other panel work. The horizontal pieces are termed rails. Stop-Bead — A small bead or projection on a metal surface to prevent a pipe or sash from slipping past. GLOSSARY. 299 Straining-Beam — A horizontal beam placed between two struts inclined in opposite directions, producing a strain of compression. " Straw " Bids — Fraudulent bids. Strapped — Bound around with flat bands of iron. Stretchers — Bricks or stones placed with their longest dimensions parallel to the face of a wall. String Course — A projecting horizontal band or line of mouldings in a building. Stringers — Longitudinal beams generally used to support a uniform load. Stripping Grounds or Grounds — Strips of wood fastened to blocks in a wall to support architraves and mouldings. Struck Joints — Those filled with mortar which is pressed out and struck off with a trowel. Struck Measure — One in which all material projecting above the top of the vessel is scraped off. Stirrup — A pendant band of iron, supporting girders. Stud — A short stout projecting pin ; a l^rop ; the vertical pieces in a stud partition. Sub-Panel — One of the lower panels in a door, &c. Sub-Plinth — The lowest portion of the plinth. Suites — Adjoining apartments. Swedged — Mammered with the swedge hammer which has a cylmdrical groove of proper diameter traversing its butt. Swivel — A revolving link in a chain consisting of a ring or hook ending in a headed pin which turns in a link. Tail Joist — Short pieces of joist extending between two beams, girders or trimmers. Tap Screws — A screw of hard steel with a square head for cutting threads on nuts. Tap Bolt — A bolt which simply passes into its socket without penetrating it. Tapped — Reamed out. Templet or Template — A form or pattern. Tenon — A projection from the end of a timber made to fit a mortice. Terra Cotta — A substance manufactured from clay and sand or chamotte (ground terra cotta.) Thimble — A short piece of tube slipped over a rod to separate parts of a structure as, a post or chord. Through Bridge — One in which the vehicles pass through, the roadbed being supported on the lower chord. Thickening Washers — Additional or extra washers used when the thread is not cut far enough on a bolt. Topped Out — Having a splay outward at the top as in chimneys. Toothing— Unfinished brickwork so arranged that every alternate brick projects half its length. Tool Dressed — Hammered to a plane surface, not smoothed. Transept — That part of an auditorium which projects at right angles to the body or nave, making it cruciform. Transom — A horizontal cross bar or muUion for a door or window ujually separating the door from a light over head. Trap — A horizontal door, as in a floor ; a bend in a pipe to retain water and prevent foul gasses from flowing through. Tread — The flat or horizontal part of a step. Treenails — Wooden pins used in fastening timbers together. 300 GLOSSARY. Trimmer — A short cross timber, framed into two joists to sustain the ends of intermed- iates where they would otherwise find no support. Turn Buckles — A small fastening turning about a screw through its centre ; a nut with a right and left handed screw for tightening up tie rods. Two-Men Stone — Stone capable of being conveniently lifted by two men. Three Coat Work — Plaster or paint put on in three layers. Tongued and Grooved — Having a rib projecting from the edge of one board and fit- ting a corresponding longitudinal recess in another, as in flooring. U Upset (or Stove Up) — Hammered back to thicken the end of an iron bar as in forming an eye or head for a bolt. V Valley — A re-entrant angle formed by the intersection of two parts of a roof. Veneered — Covered by a thin sheeting of ornamental wood. W Wainscoting — A wooden facing around the walls of rooms about three feet high. Wall Plate — The plank laid on the side walls of a house on which the roof trusses rest. Wash Boards — The boards surrounding a room, at the floor, to a height of less than a foot. Wasted — Thrown aside. Water Closet Containers — The basins above the goose neck forming a trap. Water Table — A horizontal band or offset in a wall sloped on the top to shed the water t usually between the foundation and superstructure. Weather Boarding — An outer covering of boards which are generally placed horizon- tally so that the higher board overlaps the one below, sometimes arranged vertical- ly with battens over the joints. Weir — An opening in the breast of a dam or an embankment to discharge the ex- cess of water. Weld — The junction of two metals made by heating and hammering them together in connection with a flux. Web — The flat metalic surface connecting two or more ribs or flanges. Wind — Twist, warp. INDEX. Pages Advertisements 207: object of 208 part of contract 211 for breakwater 210 " bridge 215 " canal locks 211 " digging engine — house foundat'ns 214 " dam 211 " dredging (rock) 210 " dredging (sand) 209 " gravel 215 '' opening trenches 214 " pier 210 «* removing piers .. 215 " removing snags.. 211 " rip rap 209 ' sewers 213 «' stone for pier, East Ri.er Bridge, 216 . " steam power, — Centennial, 216 " shafting 217 Agents, legal status of 246 Agreement, articles of (form in use by U. S. Engineers) 251 Agreement, form in use by U. S. 1 Light-House Board 254 Agreement for construction of Sewers 259 \ •' " " Reservoirs 262 " articles of, for the manu- I facture of iron pipe 263 ' Agreement for a college building 267 " general form, between a | contractor and a firm 273 , A Pages. Agreement for Right of Way in fee... 275 " " preliminary 276 '' 277 " for Graduation & Masonry 280 Appropriations 251 Arch, and ring stones 95, 162 brickwork 162 Artisan's Work, measuring.., 26 Asphalt, flooring 113 B Backing 163 Bench Marks 172 Bids T 219, 246 " opening of 235, 238, 239 " right to reject 211 " by telegraph 211 «' indorsing 211 " to include what 146, 163 " in equal amounts 238 " for masonry, &c., (see Proposals) 146 Blanks, where obtained 211 Block Plan 43, 44 Board Measure 26 Bonds 228, 253, 257 Bondsmen's Oaths, forms of 228, 255 Book Sizes 25 Borrow Pits 171 Bricks, dimensions, &'c 31 Bricks and brickwork 49, 92, 106, 113, 126, 162, 167 Bridge, dimensions 174 " strains 174 tests 177, 182 302 INDEX. C Pages. Contract 243 " component parts of 243 " conditions of 248 " classification of 244 '« four essential elements of.,.. 245 " forms of, in use byU. S. En- gineers and others (see Agree- ments) Carpenters' work 27, 50 Cement 74^95. 106, 139, 161 Certificate, of Solvency, (forms) 229, 231,257 Certificate of City Solicitor 231 Chairs and joints 42, 156 Coffer Dams 171 Colors, code of conventional ...0 6 Compulsory Signatures 245 Concrete 70.741 95. 139 Connections, sewer 97 Consideration, the 245, 246 Coping ^95, 140 Cross Ties 42, 156 Custom or usage 248 Damages and penalties 102 Day, a working .■■■. 25 Delivery 42, 157 Dimensions, how indicated 2 «' of locomotives, 184, 186, 187 '« cars. Boiler Tank i38 •' '' Box 192 " •' Butter and Egg,., 198 •♦ '' Gondola 201 •« " Rack 194 '' «' Stock 196 " for wrought iron bridge.. 142 Drain Pipe 169 Drawings, for contracts 7 «' '' maps 7 •' working 2 " paper, sizesof 6 " law relating o 7 •' where 'leen 211 Duress 245 Duties, general, of "tarries 248 " of contractor 248 «• of employer 248 E Earth, excavation, (see Specifications for earth ex.) 165 Eight-Hour law .,... 25 Embankments 91, i66 Engineer 173 Estimates, required 7 " . elements of 9 " formulas for computing 10 " for superstructure CS.RR. 42 " for an Art Building 43 " in detail 49 *' for bridges 240 •' approximate, 62, 64, 70, 109, 135, 144, 210 Estimates, law, relating to 7 Excavations (see Specifications for).. Fencing 157 Filling and ditching 157 Flagging 105 Form i Forms of contracts, U. S. Eng's 251 " '• U. S.Lt. House... 254 «« " Municipal, &c,, — 259, 262, 263, 267, 273, 275, 276, 277, 280 Forms of contracts, furnished by whom 220 (see Bonds, Certificates, Bids, &c) Foundations for abutments 179 " " culverts 152 '' paved and timber 170 " prices 49 " timber and planking. 96 Fraud 245, 246 G General Conditions 98, 99, 100, lox Geometry, Descriptive i Grouting 163, 167 Guaranty, forms of 223, 250 H Hard Pan 165 Headings 207 Heating and cooking apparatus 45, 52 Heights, comparative, of noted domes and spires 48, 49 INDEX. 303 I Pages. Instructions for bidders 219 Interference with travel...'. loi Iron, angle 175 Ironwork, prices for 50 •« " galvanized 50 Iron, wrought and cast, &c 30 Law, relating to drawings and estimates 7 '' " length of day 25 " '' advertisements 207 '• '' contracts 243 Light 5 " direction of 5 LI^UTATlONS 250 M Manholes in sewers Masonry in abutments " shafts, &.C (see Specifications for) Measures of length " miscellaneous ;. " of land (Surveyor's) " French, of length.^ " Spanish, of length •' of surface 16, " " French " '« Spanish " of capacity. " '• French " " Spanish " liquid " dry, Spanisji Measuring, Artisan's work " boards .... " bridges " timber " Bricklayer's work " Carpenter's work " Excavator's work " Glazing " Masonry 18, 28, 29, 30, " Painting , '' Paving 31, " Plastering '• Plumbing " Quarryman'3 Track, R. R 96 162 163 14 14 15 16 16 17 i7 18 19 20 20 19 21 26 26 176 26 31 27 28 33 3^ 32 33 33 33 18 157 M Pages. Metric System 15, 16, 17,20, 23 Mortar 68, 95 Mutual Consent 245, 246 O Offers, on time 246 " by correspondence 246 Painting 32, 52, 191, 201 Paper, hot and cold pressed 7 Parties, to a contract 245 Paving 31, 170 Payments, by instalment 249 " upon certificates 249 '« of penalties 249 58.61,64,76,103.108,159,249 Perch 18, 28 Perspective i Piers 180 Pile§ and piling 96, 171, 179 Plastering, prices 52 Plumbing, prices 50, 51 Pointing 93, 112 Prices 49, 50, 51, 52, 238, 239, 240, 241 '' sewer 236 " must be in writing 220 Profiles , 3 Projections , orthographic i " scenographic i " isometric 4 Proposals 219 •> for a Light House 227 " for a Sewer 230, 236 " •• " (tabulated) . .. 237 " for Graduation and Masonry P. R. R. (table) 232 Proposals for same C.S.R.R, (table).. 233 " '* Tunnel (tabular) 233 " •' superstructure Iron B'dg 234 " •' removing Snags 222 " " building Lock 224 " " building a Dam 225 " " bridge at Philada 240 Puddling 10:; Rails 42, 156, 177 Rail Tests 17S Refilling 91 304 INDEX. R Pages. Residence 220 Retaining walls 170 Rip rap 170 Risks 249 River navigation 177, 182 Rock, loose 165 " solid. 165 Rod 31 Rolling Load 173 Roofing Slate, price of 51 " galvanized iron and tin 52 S Sand 40,74, 139 Scale i " position of..... 2 «< decimal and duodecimal 2 " vertical and horizontal 3 Seals 220 Section Lines 6 Shade and shadows i Shade Lines 5, 6 Shoeing 90 Signatures 220 Slope Walls 170 Specifications, Architectural— '' Carpenter work 114, 128 " Collegafe building no " Gas 121, 135 " Hardware 119. 137 " Heating .122, 137 " Ironwork ..117, 127 '« Lightning rods.. 123 <« Painting & glazing. .121, 136 «« Plumbing 120, 134 «« Plastering ,121, 133 «< Railroad depot 124 '* Tinning & slating.. 122, 137 '* Breakwater, crib work.. 59 «« «« riprap 57 «« Bridge .superst'ure 142, 181 <• Bridge, over R. R-iron 145 '« Bridge R.R. masonry.. 139 " Bridge & trestles ,..171, 173 «' Clearing & grubbing... 164 '^ Canal Locks 64 " Cars (freight) 188,192, 194, 196, 198, 201 Specimcation for a Dam 71 S Pages. Specifications, Dredging sand & mud 55 " " loose rock .. 58 •' Earthwork, 66, 72, 90, 104, no, 165, 170 Specifications, Excavations jor a— " Canal Lock 66 " College building no " Dam 72 " Masonry 170 " Reservoir 104 Roadbed (R.R.) 165 •' Sewer 90 '< Tunnel 161 " Grading a Drive 147 " Graduation & Masonry .....150, 164 Specifications, Lighthouse (iron) 77 '< Locomotives, 184, 186, 187 " Macadamizing a road, 149, 166 Specifications, Masonry for — " Abutments 162 " Brick 92, 105, 113, 126 " Broken range ashlar... 112 '< Bridge (R.R.) 94, 139, 152, 180 Specifications, Canal Locks 67 " Culvert 152, 169 " Dam 73 " hammer dressed 94 «' random coursed pitch- ed ashlar 94 Specifications, regular coursed pitch- ed ashlar 94 Specifications, rock range pitch face, -' 140. 145. 154 Specifications, (rubble) 154 " shaft 163 '• of stone 93,111, 126 " tunnels. ..31, 161, 168, 169 Specifications /«7r a Pier (iron) 61 " Rails (iron) 177 " Removing Snags 63 " Reservoir 104 '< River improvements, 62,68,64, 71 Specifications, Sewer (brick) 60 " Superstructure (R.R) 155 '« Track laying 155 INDEX. 305 S Pages. I Specifications, Trestles 171, 173. 276 ^ " Tunnels 161, 167 | Specific Gravities 34 '< " table of. 36 et. seq. Spoil Banks 171 Stakf:s 172 Statute relating to advertisements 207 " " contracts 251 " " day's work 25 •' " drawings 7 •' " estimates 7 Stone, estimated by U. S. Eng'rs 18 " dressed, prices 50 •• (see Spec 'ns for Masonry) Straw bids 219 Sub-sills 155 Timber 18, 26 '« for bridges 175 guard 175 Time, divisions of 24 •• for completing work 250 Track Laying 42, 156 Turnouts 42, 157 U Pages. Units, standard, American, English, French and Spanish, with relations 13 Units of length 14, 15, 16 ' surface 16, 17, 18 ' volume i3 ' capacity, liquids 18, 19, 20. 21 ■' '' dry nieas..i8, 19, 20, 21 ' weight 21, 22, 23 ' Time 24, 25 ' miscellaneous table of. 25 W Weight, of one cub. ft. of various sub- stances, (table) 36 to 41 Weight, Avoirdupois 21 «' Troy 22 " Apothecaries 22 " French and Spanish 23 " of rails 177, 178 1: students can procure Engineering and Surveying Instruments from: FAUTH & CO., J|anufarfurjr3 o( ^j'trctttoraical mi. j^tiginecrtng iji-tstruntfitta, Fronting Capitol Park, V/ASHINGTON, D. C. Prize Medal and Diploma awarded by the U. S. Centennial Commission ior excellence in design and construction of the Instruments exhibited. Illustrated Catalogue sent post-paid on application. HELLER & BRIGHTLY, Engineering- and Surveying Instruments, 88 North Seventh Street, Philadelphia. Without decreasing- size of any pirt of our " Enpfinecrs' Transit," we have re- duced the weiyht one-half. An orilinary Transit Telescope magnifies from lo to 12 (iiameteri, our new Transit Telescope (length loji inches, shows objects erect and not inverted; magnifies 18 diameters, and will read time on a watch- dial at 9S3 feet. For description of our new Mining Transit (weight 55.2 lbs.) and Plummjt Lamp see Van Nostrand's Engrineering Magazine, June, 1873. Extract from report of Committee of Civ. Engs. appointed by Franklin Inst. to examine H. & B.'s now Transit [Dec. 1871] : "It exhibits several novelties of construction which, in the opinion of the ciimmiltee, render it suporior to those now in use, and in its opinion the deviations which they have made from the common styles of Transit are decided improvements." John C. TrAUTWINE, Chairman. We have also 'ately (Jan., 1878) placed several other valuable improvements on our Engineering Instnmients. the most important of these being a patented device for instantaneously setting and leveling up field instruments, by which at least one-thiiHl more field wo' k can be done than by the old method, and more correctly. Our instruments are exclusively used by the Univ. of Penna.: Colum- bia Coll'esre, N.Y. City; Princeton College, also in the Polytechnic College, Phila.; Dartmouth College. N. H.; University of California, and others. Descriptive and Illustrated Price List sent post-paid on application. ]\/[athematical Instruments. Drawing Instruments, Transits, Levels, Compasses, Tape Measures, Scales, T Squares, Pocket Levels, Parallel Rulers, Drawing Papers, Water Golors, India Ink, Drawing Pencils, Hand Levels, Sur- veying Ciiains, Aneroid Barometers, &.C., &.C. JAMES W. QUEEjYS' CO., 924 Cliestnut St., Philadelphia. p. S. — Priced and Illustrated Catalogue sent on application. No. lOl South Eighth Street, Philadelphia. Protractors, Improved Boxwood Scales, Proportional and Beam Compasses, Dividers. RuJing Pens, &c., always on hand or made to order. ANNOUNCEMENT! TOWNE SCIENTIFIC SCHOOL, UNIVERSITY OF PENNSYLVANIA. The Course of Study in this department extends over four years, the first two of which are regarded as preparatory, and embraces : In the Freshman Year, The English, French and German Languages, History, Drawing, Mathe- matics and Chemistry. In the Sophomore Year, Rhetoric, Compositions and Declamations, Philology, French, German, Drawin J, Mathematics, Chemistry, Geology and Physical Sciences. In the Junior Year, Logic, Compositions and Declamations, Physical Science, Geology, Chem- istry, Mineralogy, Metallurgy, Mathematics, Surveying, Drawing, Archi- tecture, Engineering and Modeling. In the Senior Year, History, International Law, Social Science, Compositions and Declamations, Astronomy, Physical Science, Geology, Chemistry, Mineralogy, Metal- lurgy, Drawing, Surveying, Geodesy, Engineering, Mechanics, Modeling and Architecture. For requirements for admission and graduation, details of studies, tuition, ^c, apply for the annual catalogue. In addition to the above, instruction is given in the Towne Scientific School in five parallel courses, viz.: I. Chemistry — Dr. F. A. Genth. II. Geology and Mining Engineering — Prof. f. P. Lesley^ Dean. IV. Dynamical Engineering — Dr. Wm. D. Marks. V. Architecture — Prof. Thoinas W. Richards. VI. A course preparatory to Medical Studies. The remaining Departments of the University are those of Medicine, Law, Music and the Arts: for information concerning which application should be made to the Provost. .^ ^ << '^A v^' (?■ ! ^