CORNELL UNIVERSITY LIBRARY GIFT OF Regional Plan Association FINE ARTS Cornell University Library NAC 6827 .A32A25 Report of Committee of the Albany Chamber of Commerce appointed to suggest a plan for the Improvement of the River Front November 14, 191 1 Committee EDMUND N. HUYCK JAMES H. PERKINS ANDREW THOMPSON NAd (l &> ef/' -a-.J /_,A'„,jt -/C JJ 5°° Total assessed valuation $76 , 30b ESTIMATES OF EXPENSE TO THE CITY 1. Improvement from Maiden Lane to Madison Avenue Property to be acquired, assessed valuation, $533,500, plus one-third. . . . $712 ,000 Dock wall from Hodge St. to Madison Ave 45 , 000 Pavement, curb, sidewalks, etc., at Plaza 26 , 500 Pavement, curb, sidewalks, etc., east half of Quay St 18 , 500 Pavement, curb, sidewalks, etc., at Steamboat Square 18 ,000 Bridge across Basin to Recreation Pier 40 , 000 Total $860 , 000 2. Improvement from Madison Avenue to South Ferry Street Property to be acquired, assessed valuation, $76,300, plus one-third $102 ,000 Enlargement of Riverside Park 52 , 500 Dock wall 45 , 000 Pavement and sidewalk on Quay St 12, 500 Pavement and sidewalks on South Ferry St 4 1 500 City's share of pavement and sidewalks on Broadway 15 , 500 Total $232 ,000 3. Improvement from South Ferry Street to Island Creek i Dock rights, 1620 feet at $20 $32 ,400 Dock wall 142 , 000 Pavement on Quay St 58 , 000 Total $232,400 Summary of Expense to City Improvement from Maiden Lane to Madison Ave $860 ,000 Improvement from Madison Ave. to South Ferry St 232 ,000 Improvement from South Ferry St. to Island Creek 232 ,400 Total $1,324,400 ESTIMATE OF EXPENSE TO D. & H. CO. Between Maiden Lane and South Ferry Street, from Broadway easterly. This estimate does not include the property to be acquired, the buildings to be erected or the track work. New dock wall and platform $88 ,000 Filling Basin 35 ,6oo Pavements, sidewalks, etc 79 ,000 Total $202 , 000 ESTIMATE OF EXPENSE TO N. Y. C. & H. R. R. R. Between Maiden Lane and 100 feet south of Columbia Street. This estimate does not include property to be acquired, buildings to be erected or the track work. New dock wall and platform $82 , 000 Filling Basin 36 , 000 Pavements, sidewalks, etc 26 , 000 Total $144 , 000 In addition to the above, the owners of the property along the west side of Broadway from State Street to Madison Avenue and along the west side of Dean Street from State Street to Maiden Lane will be assessed for the expense of the new pavement and sidewalks in front of their property amounting to about $30,000, and the United Traction Company will be assessed for about $18,000 for the new pavement between and two feet outside the outer rails of their tracks. The above estimates include the expense of engineering but do not include the work of elevating the passenger tracks of the D. & H. Co. nor the expense of constructing the proposed intercepting sewer in the area affected by the river front improvement. The type of dock wall, on which the above estimates are based, is a concrete wall on pile foundations, similar to the walls being built around the recreation pier, and costing about $50 per lineal foot. This dock wall will allow a depth of about 12 feet of water next the wall. Should a greater depth of water be required, a different type of wall must be built at a greatly increased cost. It also must be understood that the above estimates are only approximate and based on such maps and information as were readily available within the limited time at my disposal. They are therefore subject to more or less change as a result of accurate surveys and sound- ings and the preparation of detail plans for carrying on the work. Very respectfully submitted, (Signed) Wallace Greenalch, Civil Engineer i')'>)i>*»»>'»n»tm »»>»>» Rccreaf/on fter. Riven ^O c Section A -A Scak- 10 tut to Imth